Attachment 1 Schedule of Items - 1240LQ23Q0109 Tomboy Mine Preliminary Inspection.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Tomboy Mine Preliminary Inspection
Solicitation number
1240LQ23Q0109
Issued by

About this file

This attachment provides the schedule of items for Request for Quotation number 1240LQ23Q0109 issued by the Department of Agriculture Forest Service. The RFQ seeks quotations for preliminary assessment and site inspection reports for the Tomboy Mine and optional work at the Victor Mine. For the Tomboy Mine, the schedule includes lump sum line items for preparation of health and safety plans and reports, evaluation of existing data, field work planning and execution including travel, sampling and testing, and risk assessment and standards comparison. An additional lump sum line item is provided for the final report. Optional identical line items are included for the Victor Mine, with a note that field work for both sites would be combined into a single trip if the optional items are awarded. No pricing is included in the schedule.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

Schedule of Items
RFQ 1240LQ23Q0109 Tomboy Mine Preliminary Assessment/Site Inspection Reports
SiteTask #DeliverableQuantityUnitCost
Tomboy Mine (BASE)1Preparation of HASP and QAPP, Evaluation of Existing
Data, and Preparation of FSP1Lump Sum
2(a)Performing Field Work Plans (Including conducting field work and all associated travel costs)1Lump Sum
2(b)Sampling and Testing1Lump Sum
3Risk Evaluation and Standards/Benchmarks Comparison
Assessment Tables1Lump Sum
4(a)Final PA/SI Report1Lump Sum
Victor Mine (OPTIONAL)1Preparation of HASP and QAPP, Evaluation of Existing Data, and Preparation of FSP1Lump Sum
2(a)Performing Field Work Plans (Including conducting field work and all associated travel costs) Note: if awarded optional items, site visits and field work for Tomboy and Victor sites shall be completed in a single field event to reduce travel costs.1Lump Sum
2(b)Sampling and Testing1Lump Sum
3Risk Evaluation and Standards/Benchmarks Comparison Assessment Tables1Lump Sum
4(a)Final PA/SI Report1Lump Sum
Total (BASE)$0.00
Total (OPTIONAL)$0.00
Total (BASE and OPTIONAL)$0.00

File details come from the government source that posted it. Updated .