Attachment 1 SBSpecs.pdf

PDF 1 MB Posted

Attached to
GAOA Spotted Bear & Meadow Creek Road Resurfacing, Flathead National Forest
Solicitation number
1240LT22R0069
Issued by

About this file

This solicitation package includes specifications and plans for a road resurfacing project on the Flathead National Forest. The work involves resurfacing approximately 9.95 miles of the Spotted Bear and Meadow Creek Roads, and includes removing and replacing the existing aggregate surface course, full depth reclamation, stockpiling aggregates from developed sources, blasting rock if needed, establishing turf, and implementing erosion control measures. The specifications provide requirements for contractor quality control, traffic control, materials testing, compaction methods, and acceptance criteria. Bids for the work are due by 1:00 PM local time on January 20, 2022 and the contract is to be awarded by February 15, 2022. The Forest Service will administer the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents Preface

101 - Terms¸ Format¸ and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid¸ Award¸ and Execution of Contract

Delete Section 102

103 - Scope of Work

Delete Subsections 103.02, 103.03, 103.04, 103.05

104 - Control of Work

Delete Subsections 104.01, 104.02, 104.04

104.06 Use of Roads by Contractor

105 - Control of Material

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.02 Visual Inspection

107 - Legal Relations and Responsibility to the Public

Delete Subsection 107.05

108 - Prosecution and Progress

Delete Section 108

109 - Measurement and Payment

Delete Subsections 109.06, 109.07, 109.08, 109.09

109.01 Measurement of Work

109.02 Measurement Terms and Definitions

153 - Contractor Quality Control

153.02 Qualifications

153.03 Quality Control Plan

153.07 Records and control charts

153.04 (2) (a) Submittal Log

155 - Schedules for Construction Contracts

Delete Section 155

156 - Public Traffic

Attachment #1-1240LT22R0069

Section 156. – PUBLIC TRAFFIC

157 - Soil Erosion and Sediment Control

157.04 General

205 - Rock Blasting

205.03 Regulations

205.06 Preblast condition survey and vibration monitoring and control

205.07 Test Blasting

205.08 Blasting

301 - Untreated Aggregate Courses

301.03 General

301.05 Compacting

303 - Road Reconditioning

304 - Full Depth Reclamation

314 - Stockpiled Aggregates

314.01 Description

314.04 Stockpile Site

625 - Turf Establishment

Section 625. — TURF ESTABLISHMENT

703 - Aggregate

703.05 (c) Surface course aggregate. (3) Plastic Index

703.05 Subbase, Base, Surface Course, and Screened Aggregate

Preface Preface_wo_01_07_2022

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

101 - Terms¸ Format¸ and Definitions 101.01_National_11_9_2016

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_National_11_9_2016

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_1_22_2020

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards —

The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_11_9_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_11_9_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.06_National_11_9_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.05_National_6_29_2020

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.

106 - Acceptance of Work 106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project.

When the Government tests work, copies of test reports are furnished to the Contractor upon request.

Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive.

The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;

providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_11_9_2016

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017

Delete Subsection 107.05.

Delete Subsection 107.05.

108 - Prosecution and Progress 108.00_National_11_9_2016

Delete Section 108 in its entirety.

Delete Section 108.

109 - Measurement and Payment 109.00_National_11_9_2016

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

Delete Subsections 109.06, 109.07, 109.08, 109.09.

109.01_National_2_22_2019

Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:

109.01 Measurement of Work.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.

Table 109-1

Decimal Accuracy of Quantities for Final Payment

Pay Item Level of Precision Linear Foot 1

Exception--Timber, Steel, and concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1

Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;

0.1

Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1

Exception--Calcium Chloride;

Sodium Chloride; Hydrated Lime;

Bituminous Materials; Pavements;

Bed Course Materials

0.01

Hour 0.1

MFBM 0.01

Station Yard 1 Cubic Yard Mile 1

Ton Mile 1

109.02_National_11_9_2016

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

153 - Contractor Quality Control 153.02_National_11_1_2016

Delete Subsection 153.02 and replace with the following:

153.02 Qualifications.

Submit the following for approval with the quality control plan:

(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.

(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:

(1) NICET Level II certification in highway material or equivalent state or industry certification;

(2) Certification by a regional certification program (such as Western Alliance for Quality Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and Certification (M-TRAC)); or

(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.

153.03_National_11_1_2016

Add the following paragraph to the end of Subsection 153.03(b):

153.03 Quality Control Plan.

(b) Quality Control Procedures.

Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.

153.07_National_11_1_2016

Delete Subsection 153.07 and replace with the following:

153.07 Records and control charts.

Maintain complete testing and inspection records by pay item number and make them accessible to the

CO.

153.10_Regional_5_31_2018

Add the following Subsection:

153.04 (2) (a) Submittal Log At a minimum the contractor shall provide project submittals as shown on the Submittal Log below.

Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.

Submittal Log

Log No.

Indirect payment to Pay

Item(s) Description of Submittal Type of

Submittal

Requirement found in

Specification No.

/Drawings

Additional Specification References

1 151 Submittal Schedule Schedule

2 151 Source Development Plan- Peters Creek Quarry Plan 105.02(a)

3 151 Hazardous Spill Plan Plan 107.10

4 151 Contractor Quality Control Plan Plan 103.02 552.09

5 151 Traffic Control Plan Plan 156.03

6 301 Aggregate Target Values Target Values & Samples 301.03

7 301 Aggregate Surface Course Testing Test Results Table 301.01

8 314 Blasting Personnel Qualifications Qualifications 205.04

9 314 Blasting Plan Plan 205.05

10 314 Extents of preblast clearing & scaling & blast plan map Plan 205.08

11 314 Blasting Reports Reports 205.09

12 314 Blasting Materials Material Certification 205.10

13 625 Seed Mix Material Certification 625.10 106,FSSS

625,713

155 - Schedules for Construction Contracts 155.00_National_11_9_2016

Delete Section 155 in its entirety.

Delete Section 155.

156 - Public Traffic 156.00_National_2_5_2019

Delete Section 156 in its entirety and replace with the following:

Section 156. – PUBLIC TRAFFIC Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Permanent Traffic Control 633

Traffic Signing and Marking Material 718

Concrete Barriers and Precast Guardwalls 618

Temporary plastic fence 710.11

Construction Requirements

156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 1 hours at any one time followed by an open period of no less than 30 minutes Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).

Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.

Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15. All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.

Table 156-1 Temporary Road Closures

Road Number

From Terminus

To Terminus

Maximum Consecutive Days of Closure

Minimum Consecutive Days Open

568 MP 0.00 MP 9.95 5 2

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See Subsection 109.05.

157 - Soil Erosion and Sediment Control 157.04_National_11_1_2016

Delete Subsection 157.04 and replace with the following:

157.04 General.

Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.

When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.

205 - Rock Blasting 205.00_National_11_8_2016

Add the following to Subsection 205.03:

205.03 Regulations

(e) Forest Service. For projects in National Forest Service lands, comply with Forest Service Manual (FSM) 6745, Explosives and Blasting Materials.

Add the following to Subsection 205.06:

205.06 Preblast condition survey and vibration monitoring and control.

Limit blasting induced vibrations in saturated soils or on steep slopes as designated or as directed by the

CO.

Notify the owners of nearby utilities at least 24 hours before blasting.

Add the following to Subsection 205.07:

205.07 Test Blasting.

Test blast at all new sources, when rock type changes, and when blast layout changes due to slope or other changes.

Add the following to the bulleted list in the eighth paragraph of Subsection 205.08:

205.08 Blasting.

• Precipitation exceeds 1 inch in any 24 hour period.

• Precipitation exceeds 3 inches in any 96 hour period.

• Precipitation exceeds 4 inches in any 144 hour period.

• A landslide occurs within 300 feet of a blast site under any precipitation conditions.

301 - Untreated Aggregate Courses 301.03_National_7_17_2017

Add the following to Subsection 301.03:

301.03 General.

Written approval of the roadbed is required before placing aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpile according to Section 314.

301.05_National_7_17_2017

Delete Subsection 301.05 and replace with the following:

301.05 Compacting.

Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road.

Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

(a) Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

(b) Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

(c) Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

(d) Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

(e) Compaction E. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

303 - Road Reconditioning 303.05_Regional_5_31_2018

Delete Subsection 303.05 and replace with the following:

303.05 Roadbed Reconditioning.

Remove organic, deleterious, and material larger than 6 inches brought to the surface during reconditioning. Scarify potholes, ruts, and areas shown in the plans to a 6-inch depth or the bottom of the pothole, whichever is less. Dispose of waste at designated sites or according to Subsection 204.14.

Repair soft and unstable areas according to Subsection 204.07. Remove irregularities and shape to a uniform surface. Perform the work, including mixing or spreading, when the moisture content is suitable for the specified compaction method. Compact the surface according to Subsection 204.11. Shape the surface according to 204.13(c).

Delete Subsection 303.06 and replace with the following:

303.06 Aggregate Surface Reconditioning.

Repair soft and unstable areas to the full aggregate surface depth and according to Subsection 204.07.

Scarify potholes, ruts, and areas shown in the plans to a 6-inch depth or the bottom of the pothole, whichever is less. Remove irregularities and shape to a uniform surface. Perform the work, including mixing or spreading, when the moisture content is suitable for the specified compaction method.

Compact the surface according to Subsection 204.11. Shape the surface according to 204.13(c).

304 - Full Depth Reclamation 304.00_Regional_1_20_2021

Delete Section 304 entirely and replace with the following:

Description

304.01 This work consists of pulverizing an existing roadbed in-place, mixing this material with water, and shaping and compacting the mix.

Material

304.02 Conform to the following Subsections:

Water 725.01(c)

Construction Requirements

304.03 General. Establish profile and cross slope control. Maintain the existing cross slope or crown if none is established.

Before pulverizing, perform ditch and shoulder reconditioning in accordance with 303.03 and 303.04 respectively. Suitable material generated during reconditioning may be pulverized and incorporated into the roadway.

Protect buried facilities from damage.

304.04 Reserved.

304.05 Pulverizing. Furnish a road reclaimer that is:

(a) Self-propelled;

(b) Specifically manufactured for in-place reclamation;

(c) Capable of reducing the existing material to the required size;

Use the reclaimer to pulverize the existing roadway material, in-place until 100 percent passes the sieve size specified in the schedule of items. Reprocess or remove larger particles and dispose of them at designated sites or according to Subsection 203.05.

304.06 Mixing and Spreading. Add water as necessary to adjust the moisture content of the mixture to meet the compaction method specified. Mix to produce a homogenous full depth mixture. Spread the mixture uniformly across the existing roadbed to provide a final compacted shape according to the established line, grade, and cross-section.

304.07 Compacting. Adjust the moisture content in accordance with the compaction method specified in the schedule of items and compact according to subsection 204.11.

304.08 Surface Tolerance. See Subsection 301.06.

304.09 Maintenance. See Subsection 301.07.

304.10 Acceptance. See Table 304-1 for sampling, testing, and acceptance requirements.

Construction of full depth reclamation will be evaluated under Subsections 106.02 and 106.04.

Measurement

304.11 Measure the Section 304 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

Payment

304.12 The accepted quantities will be paid at the contract price per unit of measurement for the Section 304 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Table 304-1 Sampling, Testing, and Acceptance Requirements

Material or Product

(Subsection)

Type of Acceptance (Subsection)

Characteristic Test Methods Specifications

Sampling Frequency

Point of Sampling

Split Sample

Reporting Time

Remarks

Production Pulverized material

Process control (153.03), (106.02)

Visual Inspection (106.02)

Moisture content (in-place)

Gradation

Various Field Testing

Methods

Consistently throughout operation

IAW QC Plan

Behind recalimer before compaction

Upon completion of test

Moisture content suitable for compaction specified

100% passing sieve size specified in the pay item

Finished Product Finished pulverized material

Visual Inspection (106.02)

Surface tolerance & depth

– Subsection 301.06

Minimum 8 per mile

Random Completed, compacted, and finished surface

– Before placement of next layer or as requested

Reclamation depth specified in the pay item

314 - Stockpiled Aggregates 314.00_National_7_18_2017

Add the following to Subsection 314.01:

314.01 Description.

Pit or quarry development work consists of clearing, grubbing, stripping topsoil, removing overburden, constructing access roads, conducting restoration activities, and performing other incidental work required for pit or quarry development.

Add the following to Subsection 314.04 after the first sentence of second paragraph:

314.04 Stockpile Site.

Submit a plan of operation according to Section 105.02. Perform the work in accordance with MSHA 30 CFR, part 56.

625 - Turf Establishment 625.00_National_7_18_2017

Delete Section 625 in its entirety and replace with the following:

Section 625. — TURF ESTABLISHMENT Description

625.01 This work consists of soil preparation, watering, fertilizing, seeding, and mulching. Seeding and mulching methods are designated as dry or hydraulic.

Material

625.02 Conform to the following Subsections:

Agricultural limestone 713.02

Fertilizer 713.03 Mulch 713.05 Seed 713.04 Tackifiers 713.11 Water 725.01(b)

Construction Requirements

625.03 General. Apply turf establishment to portions of slopes, ditches, waste areas, and other disturbed areas as soon as possible after being constructed to template lines unless otherwise specified in writing by the Contracting Officer.

Seeded areas damaged by construction activities shall be reseeded within 10 days of the damage. Do not seed during windy weather or when the ground is excessively wet, frozen, or snow covered.

Assure that all seed and mulch used in the work conforms to the weed free requirements of Section 713.

625.04 Preparing Seedbed. Ensure that the surface soil is in a roughened condition favorable for germination and growth.

625.05 Watering. Maintain moisture as follows:

Watering is not required.

625.06 Fertilizing. Apply fertilizer by the following methods:

(a) Dry Method. Apply the fertilizer with approved mechanical equipment. Hand operated methods are satisfactory on areas inaccessible to mechanical equipment.

(b) Hydraulic Method. Use hydraulic-type equipment capable of providing a uniform application using water as the carrying agent. Add fertilizer to the slurry and mix before adding seed. Add the tracer material when designated by the CO.

Apply fertilizer at the rate of 100 pounds per acre. Insure that the fertilizer meets the following chemical analysis:

Nutrient Percent Nitrogen, N 16% Phosphorus, P205 16% Potassium, K 16%

625.07 Seeding. Apply seed by the following methods:

(a) Dry Method. Apply the seed with approved power driven seeders, drills, or other mechanical equipment. Hand-operated seeding methods are satisfactory on areas inaccessible to mechanical equipment; or

(b) Hydraulic Method. Use hydraulic-type equipment capable of providing a uniform application using water as the carrying agent. Add a tracer material consisting of either wood or grass cellulose fiber mulch to the water. Apply the tracer material at a rate of 400 pounds per acre (450 kilograms per hectare) to provide visible evidence of uniform application. Add the seed to the water slurry no more than 30 minutes before application. Seed by hand areas inaccessible to seeding equipment.

Furnish and apply the following kinds and amounts of pure live seed:

Seed Mix. Furnish and apply the following kinds and amounts pure live seed:

Common Name Species Pure Live Seed (Lbs / Acre)

% by weight

Blue Wildrye (native) Elymus glaucus 5 21 Mountain Brome (native) Bromus marginatus 9 38 Bluebunch wheat grass (native) Pseudoroegneria spicata 4 16 Slender Wheatgrass (native) Elymus trachycaulus 6 25 Total 24 100

Seed Certification

Certified, blue-tagged seed shall be used where a name variety or cultivar is specified. Blue tags that are removed to mix or spread the seed will be saved and provided to the Forest.

All seed purchased will be certified free of seeds from weeds listed on the current "All States Noxious Weeds List."

Pounds of seed to be furnished per acre shall be obtained by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.

𝑥𝑥 = (5 lbs Pure Seed per Acre)

(0.90 x 0.85) = 6.55 (𝑙𝑙𝑙𝑙𝑙𝑙 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑙𝑙 𝑙𝑙𝑐𝑐𝑐𝑐𝑒𝑒 𝑝𝑝𝑐𝑐𝑐𝑐 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐) where: purity = 90%; germination = 85%.

625.08 Mulching. Apply Mulch as soon as possible after seeding by the following methods.

Mulch material shall be weed free straw and shall be applied at a uniform rate to adequately cover the seed. The weed free straw shall be from a grain crop such as barley straw, wheat straw or oat straw.

Mulch will be applied at the rate of 1 Ton per Acre.

625.09 Protecting and Caring for Seeded Areas. Protect and care for seeded areas including watering according to 625.05. Repair or apply supplemental applications of seed, mulch, fertilizer, and water according to 625.05 as many times as needed until turf is established or final acceptance.

625.10 Acceptance. Material for turf establishment will be evaluated under Subsections 106.02 and 106.03.

Placing of turf establishment will be evaluated under Subsections 106.02 and 106.04.

Measurement

625.11 Measure the Section 625 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable:

When measuring turf establishment and supplemental applications by the acre (hectare), measure on the ground surface.

When measuring water by volume or mass, measure in the hauling vehicle or by metering.

Payment

625.12 The accepted quantities will be paid at the contract price per unit of measurement for the Section 625 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

703 - Aggregate 703.05_National_7_18_2017

Delete Subsection 703.05(c)(3) and Replace with the following:

703.05 (c) Surface course aggregate. (3) Plastic Index

(3) Plastic Index, AASHTO T 90

If the percent passing the No. 200 sieve is less than 12% 2 to 9 If the percent passing the No. 200 sieve is greater than 12% Less than 2

703.05_National_3_17_2021

Delete 703.05 and replace with the following:

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-2

(2) Liquid limit, AASHTO T 89 25 max.

(3) Plastic limit, AASHTO T 90 Nonplastic

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 50% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-3

(2) Liquid limit, AASHTO T 89 35 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No. 200 sieve is less than 12% 2 to 9

b) If the percent passing the No. 200 sieve is greater than 12% Less than 2

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 75% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Do not furnish material that contains asbestos fibers.Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:

(1) Gradation Table 703-13

(2) Plastic Index, AASHTO T 90 Less than 9

(3) Los Angeles abrasion, AASHTO T 96 55% max.

(4) Free from organic matter and lumps or balls of clay.

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.

Delete Table 703-2 and replace with the following:

T ab le

-2 ar ge t V al ue

R an ge s f or S ub ba se a nd B as e

G ra da tio n

Pe rc en t b y M as s P as si ng D es ig na te d Si ev e

(A A

SH

T

O T an d

T

1)

G ra di ng

D es ig na tio n

E (B e)

(6

(6

(4

4.

7.

(3

T he v al ue in th e pa re nt he se s i s t he a llo w ab le d ev ia tio n

) f ro m th e ta rg et v al ue s..

D (B

(6

(6

(6

(4

4.

7.

(3

C (B

(6

(6

4.

–7 .0

(3

B (S ub ba se

(8

4.

.0 (4

A (S ub ba se

(7

(6

(4

4.

8.

(3

Si ev e Si ze

2½ in ch

1½

3/

1/

N o.

N o.

Delete Table 703-3 and replace with the following:

ab le

-3 ar ge t V al ue R an ge s f or

S ur fa ce

G ra da tio n

Pe rc en t b y M as s P as si ng D es ig na te d Si ev e

(A A

SH

T

O T an d

T

1) ra di ng

D es ig na tio n

U

(6

(7

(5

8.

.0 (4

T he v al ue in th e pa re nt he se s i s t he a llo w ab le d ev ia tio n

) f ro m th e ta rg et v al ue s.

If th e pl as tic ity in de x

(P I) is gr ea te r t ha n 0, th e

TV

ra ng e fo r t he N o.

si ev e siz e is

-1

(4

(7

(5

8.

.0 (4

S 10

(6

(7

(5

8.

.0 (4

H

(6

(6

(5

9.

.0 (4

(6

(6

(5

.0

6.

(4

F 10

-1

-8

-6

(6

-5

-3

(6

-2

(5

.0

-1 6.

(4

Si ev e Si ze

N o.

N o.

Add Table 703-13:

Table 703-13 Gradation Requirements for Screened Aggregate

Sieve Size

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation L M N O P Q R

6 inch 100 100

4 inch 100 100

3 inch 100 100

2 inch 100

No. 4 15-45 15-45 15-45

Preface
101 - Terms¸ Format¸ and Definitions
101.01 Meaning of Terms.
101.03 Abbreviations.
101.04 Definitions.
102 - Bid¸ Award¸ and Execution of Contract
Delete Section 102.
103 - Scope of Work
Delete Subsections 103.02, 103.03, 103.04, 103.05.
104 - Control of Work
Delete Subsections 104.01, 104.02, 104.04.
104.06 Use of Roads by Contractor.
105 - Control of Material
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.01 Conformity with Contract Requirements.
106.02 Visual Inspection.
107 - Legal Relations and Responsibility to the Public
Delete Subsection 107.05.
108 - Prosecution and Progress
Delete Section 108.
109 - Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.01 Measurement of Work.
109.02 Measurement Terms and Definitions.
153 - Contractor Quality Control
153.02 Qualifications.
153.03 Quality Control Plan.
153.07 Records and control charts.
153.04 (2) (a) Submittal Log
155 - Schedules for Construction Contracts
Delete Section 155.
156 - Public Traffic
Section 156. – PUBLIC TRAFFIC
157 - Soil Erosion and Sediment Control
157.04 General.
205 - Rock Blasting
205.03 Regulations
205.06 Preblast condition survey and vibration monitoring and control.
205.07 Test Blasting.
205.08 Blasting.
301 - Untreated Aggregate Courses
301.03 General.
301.05 Compacting.
303 - Road Reconditioning
303.05 Roadbed Reconditioning.
303.06 Aggregate Surface Reconditioning.
304 - Full Depth Reclamation
314 - Stockpiled Aggregates
314.01 Description.
314.04 Stockpile Site.
625 - Turf Establishment
Section 625. — TURF ESTABLISHMENT
703 - Aggregate
703.05 (c) Surface course aggregate. (3) Plastic Index
703.05 Subbase, Base, Surface Course, and Screened Aggregate.