This memorandum provides salient characteristics for a required lofted inspection shed to be constructed or delivered at Joint Base Elmendorf-Richardson in Alaska. Key details include prefabricated or on-site construction of a wood-walled structure approximately 14 feet by 40 feet by 9 feet tall, with a lofted storage area and metal roof. Exterior color should be tan with a black roof. The shed requires two 80-inch by 36-inch metal doors and one 9-foot by 7-foot manual garage door. It should be on skids for repositioning. Related federal contract opportunity FA500023Q0126 seeks bids for the inspection shed's construction or delivery between 7:00 and 15:30 hours Monday through Friday at the munitions inspection facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3 MUNS Inspection Shed - Combo.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
3rd WING (PACAF)
JOINT BASE ELMENDORF-RICHARDSON, ALASKA
05 September 2023
MEMORANDUM FOR 732 AMS/RA
FROM: 3 MUNS/MXWCB
SUBJECT: Salient Characteristics of Lofted Garage
1. The following items are the considered salient characteristics of required lofted garage:
• Prefabricated or built on site lofted garage. Approximate dimensions 14ft x 40ft x 9 ft first floor with loft area for storage.
• Exterior building color: Tan
• Wall construction: Wood
• Roof Color: Black
• Roof Material: Metal
• Man Doors: Two (2) metal doors approximately 80 in X 36 in.
• Garage Door: One (1) manual garage door approximately 9ft X 7ft.
• Building should be on skids or similar construction to allow for repositioning
• Requested building layout:
2. In addition to providing the above equipment, the contractor shall assemble the lofted garage at the munition inspection facility or deliver assembled building. All work shall be completed between the hours of 07:00-15:30 Monday-Friday.
MICHAEL R.A. MCCRACKEN, SrA, USAF Munition Inpector