Attachment 1 - Rubber flooring SOW.pdf
PDF 115 KB Posted
- Attached to
- 57 MXG Rubber Flooring
- Solicitation number
- F3G3AA5174AG01
About this file
This Statement of Work (SOW) details a contract for replacing rubber flooring in the Wheel and Tire Shop at Building 270, Nellis Air Force Base, Nevada. The project involves removing approximately 1,554 square feet of existing deteriorating rubber flooring and installing new flooring with specific requirements: minimum 1/3-inch thickness, black color, slip-resistant, and compliant with SAE AMS-R-7362 standard. The contractor must remove existing flooring and adhesive, prepare the concrete floor, install new flooring with flush seams, groove and weld seams, and clean the area daily.
The work is to be performed on the Main Base of Nellis Air Force Base, located 9 miles north of Las Vegas, with the specific site at the intersection of Tyndall Ave and Rickenbacker Ave. Working hours are 7:00 a.m. to 4:00 p.m., Monday through Friday, excluding federal holidays. Environmental protection requirements must be followed, and the 99 CES will conduct asbestos and lead-based paint testing if required. The 57 Maintenance Group will periodically evaluate the contractor's performance, and all work must comply with applicable building codes, industry standards, and manufacturer recommendations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Wheel and Tire Shop Photos.pdf | ||
| Combo Synopsis Solicitation - Rubber Flooring.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOO-1
STATEMENT OF WORK
FOR
Replace Rubber Flooring in Wheel & Tire Shop, B270
NELLIS AIR FORCE BASE, NEVADA
18 August 2025
OFFICE OF THE BASE CIVIL ENGINEER
NELLIS AIR FORCE BASE, NEVADA
SOO-2
STATEMENT OF WORK
1. OVERVIEW: The existing rubber flooring in the Wheel and tire shop at building 270 is in need of replacement. The flooring is buckling and falling apart which causes a hazardous condition for employees.
SCOPE: The purpose of the contract is to replace approximately 1,554 square feet of rubber flooring in the Wheel and Tire shop. The new rubber flooring must have a minimum thickness of 1/3 in, black in color, slip resistant and SAE AMS- R-7362 compliant. The Contractor shall remove all existing rubber flooring to include the adhesive glue and properly dispose of the material. The contractor shall prepare the concrete floor to accept the new adhesive and rubber flooring. The contractor will ensure that all seams are flush and properly connected with no gaps or buckling.
The contactor shall groove all open seams and apply seam welding treatment. At the end of each day and at the completion of the project, the contractor will clean all job-related debris from area.
LOCATION: The project site is located at Nellis Air Force Base, Nevada. The Main Base is located approximately 9 miles north of downtown Las Vegas on Highway US 93 (Las Vegas Blvd.). NAFB consists of three main areas: the Main Base, Area II, and Area III. The specific project location is on the Main Base in Building 270, the Phase Dock, located at the intersection of Tyndall Ave and Rickenbacker Ave,4141 TYNDALL AVE, NV, 89084.
1. ENVIRONMENTAL PROTECTION: All work and the contractor’s operations shall comply with the requirements imposed by all applicable federal, state, local, and NAFB laws, regulations, codes, and permits (including NAFB Management Plan 12) concerning environmental protection. If required per the task in the area where work is to be performed, an asbestos-containing material and a lead-based paint test will be done by the 99 CES.
2. CONTRACTOR PERSONNEL: The contractor’s personnel shall conduct themselves in a professional manner.
3. QUALITY ASSURANCE: The government, through the 57 Maintenance Group, will periodically evaluate the contractor’s performance in accordance with the specific contract performance requirements.
4. WORKING HOURS: Standard working hours are from 7:00 a.m. to 4:00 p.m. Monday through Friday excluding Federal Holidays and the day after Thanksgiving.
5. GENERAL CONDITIONS: All work must be in compliance with and conform to industry standards and applicable manufacturer’s recommendations. Any electrical wiring, connections, and structural designs shall be installed IAW latest version of the NFPA 70 National Electric Code (NEC), Uniform Mechanical Code, and NFPA 54, ASME CSD-1 (Controls & Safety Devices).
All work must be in compliance with the International Building Code (IBC). 2009 Edition, DoD Unified Facilities Criteria Standards (UFC) Unified Plumbing Code (UPC) and all accepted industry practices. At the completion of the project, the system should be 100% operational.
SOO-3
--------------------------- END OF STATEMENT OF WORK---------------------------