Attachment_1_Rockfall_IDIQ_Draft_Schedules_A-E_3.pdf
PDF 1 MB Posted
- Attached to
- WY Rockfall Risk Mitigation IDIQ 2026
- Solicitation number
- DOIRFBO250012
About this file
This document contains a Contract Line Item Number (CLIN) pricing schedule for rockfall risk mitigation services across five annual schedules from 2026-2030. The pricing schedule covers multiple line items for rockfall mitigation, including a crew of three SPRAT or IRATA rope access technicians with a Level III supervisor, various hardware components like galvanized bolts, mesh, stainless steel cable, anchors, rockfall barrier systems, shotcrete reinforcement, and design services. Each annual schedule (Schedules 1-5) is identical in structure, with line items for crew hours, materials, and design, though all current unit prices are listed at $0.00, suggesting this is a preliminary or placeholder pricing document. The accompanying location map shows dam and powerplant sites across Montana, Wyoming, Idaho, Utah, and Colorado, indicating the potential geographic scope of the rockfall mitigation work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN Services/Materials Estimted Quantity Unit of Measure Unit Price Amount
1-1
Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND RATE) Crew Hours $ $0.00
1-2 #8 Grade 150 All-Thread Galvanized Bolt Each $ $0.00 1-3 #11 Grade 150 All-Thread Galvanized Bolt Each $ $0.00 1-4 3mm Mesh SF $ $0.00 1-5 1/2" Diameter Stainless Steel Cable / Rope LF $ $0.00 1-6 Anchors Each $ $0.00 1-7 Rockfall Barrier System LF $ $0.00 1-8 Wet-Mix Reinforced Shotcrete SF/IN $ $0.00 1-9 Steel Fiber Reinforcement SF/IN $ $0.00 1-10 Strip-drain (6” wide) LF $ $0.00 1-11 Drilled PVC Horizontal Drains LF $ $0.00 1-12 Design of Rockfall Mitigation HR $ $0.00
$0.00
Schedule 1 - 2026 (Performance Dates Upon Award of Contract)
Total of Schedule 1
Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND RATE) Crew Hours $ $0.00
1-2 #8 Grade 150 All-Thread Galvanized Bolt Each $ $0.00 1-3 #11 Grade 150 All-Thread Galvanized Bolt Each $ $0.00 1-4 3mm Mesh SF $ $0.00 1-5 1/2" Diameter Stainless Steel Cable / Rope LF $ $0.00 1-6 Anchors Each $ $0.00 1-7 Rockfall Barrier System LF $ $0.00 1-8 Wet-Mix Reinforced Shotcrete SF/IN $ $0.00 1-9 Steel Fiber Reinforcement SF/IN $ $0.00 1-10 Strip-drain (6” wide) LF $ $0.00 1-11 Drilled PVC Horizontal Drains LF $ $0.00 1-12 Design of Rockfall Mitigation HR $ $0.00
$0.00
Schedule 2 - 2027 (Performance Dates Upon Award of Contract)
Total of Schedule 2
Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND RATE) Crew Hours $ $0.00
1-2 #8 Grade 150 All-Thread Galvanized Bolt Each $ $0.00 1-3 #11 Grade 150 All-Thread Galvanized Bolt Each $ $0.00 1-4 3mm Mesh SF $ $0.00 1-5 1/2" Diameter Stainless Steel Cable / Rope LF $ $0.00 1-6 Anchors Each $ $0.00 1-7 Rockfall Barrier System LF $ $0.00 1-8 Wet-Mix Reinforced Shotcrete SF/IN $ $0.00 1-9 Steel Fiber Reinforcement SF/IN $ $0.00 1-10 Strip-drain (6” wide) LF $ $0.00 1-11 Drilled PVC Horizontal Drains LF $ $0.00 1-12 Design of Rockfall Mitigation HR $ $0.00
$0.00
Schedule 3 - 2028 (Performance Dates Upon Award of Contract)
Total of Schedule 3
Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND RATE) Crew Hours $ $0.00
1-2 #8 Grade 150 All-Thread Galvanized Bolt Each $ $0.00 1-3 #11 Grade 150 All-Thread Galvanized Bolt Each $ $0.00 1-4 3mm Mesh SF $ $0.00 1-5 1/2" Diameter Stainless Steel Cable / Rope LF $ $0.00 1-6 Anchors Each $ $0.00 1-7 Rockfall Barrier System LF $ $0.00 1-8 Wet-Mix Reinforced Shotcrete SF/IN $ $0.00 1-9 Steel Fiber Reinforcement SF/IN $ $0.00 1-10 Strip-drain (6” wide) LF $ $0.00 1-11 Drilled PVC Horizontal Drains LF $ $0.00 1-12 Design of Rockfall Mitigation HR $ $0.00
$0.00
Schedule 4 - 2029 (Performance Dates Upon Award of Contract)
Total of Schedule 4
Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND RATE) Crew Hours $ $0.00
1-2 #8 Grade 150 All-Thread Galvanized Bolt Each
$ $0.00 1-3 #11 Grade 150 All-Thread Galvanized Bolt Each $ $0.00 1-4 3mm Mesh SF $ $0.00 1-5 1/2" Diameter Stainless Steel Cable / Rope LF $ $0.00 1-6 Anchors Each $ $0.00 1-7 Rockfall Barrier System LF $ $0.00 1-8 Wet-Mix Reinforced Shotcrete SF/IN $ $0.00 1-9 Steel Fiber Reinforcement SF/IN $ $0.00 1-10 Strip-drain (6” wide) LF $ $0.00 1-11 Drilled PVC Horizontal Drains LF $ $0.00 1-12 Design of Rockfall Mitigation HR $ $0.00
$0.00
Schedule 5 - 2030 (Performance Dates Upon Award of Contract)
Total of Schedule 5
Fo r
In te rn al
U se
O nl y D ra ft
N ot F or D is tr ib ut io n
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL - TITLE
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
LAR M TA IOCE N
C A D
S
YS
TE
M
A ut oC A D
3.
0S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
LO
C A
TI
O N
M A P.
D W
G
LA
S T
S A V
ED
D A
TE
-1 0-
LA
S T
S A V
ED
B Y
N N
IE
LS
EN
R O
C K
FA
LL
R
IS
K M
IT
IG
A
TI
O N
I D
IQ
G
R
EA
T
PL
A
IN
S R
EG
IO
N
D A M
A N
D P
O W
ER
PL
A N
T
LO
C A
TI
O N
M A P
WYAO, MTAO
AND ECAO
LOCATION MAP
MILLS, WY 2019-10-10
File details come from the government source that posted it. Updated .