Attachment 1 - RFQ 19SN1025Q0028-0001 SOW.pdf
PDF 231 KB Posted
- Solicitation number
- 19SN1025Q0028-0001
- Issued by
-
Department of State US Embassy Singapore
About this file
This Statement of Work (SOW) details a contract for the U.S. Embassy Singapore to procure and install non-penetration deadweight anchors and free-standing railings at the Chancery Rear CAC Guard House and Sub-power Station rooftops. The project aims to address a safety deficiency by providing fall protection systems, with specific requirements including 1 set of deadweight anchors for the Chancery rear CAC guard house rooftop and 2 sets for the sub-power station rooftops, along with a 14m x 2.5m free-standing railing system.
The SOW mandates strict compliance with safety standards, including OSHA 29 CFR 1910.29, EN795 Class E, BS 7883, and ISO 14567 regulations. Contractors must provide all materials, labor, and tools, and ensure the installation meets fall protection requirements, including the ability to support at least 5,000 pounds per employee. The project is scheduled for completion by April 28, 2025, with detailed specifications for anchor and railing installation, testing, and site cleanup. The document emphasizes comprehensive safety measures, including personal protective equipment, equipment inspections, and emergency response protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 19SN1025Q0028-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Non-penetration Anchors and Free-Standing Railing Installation at the Chancery Rear CAC Guard House and
Sub-power Station Rooftops
Project:
27, Napier Road
U.S. Embassy Singapore
APR 28th, 2025
The U.S. Embassy intends to award a contract for procurement and installation of deadweight anchors and free-standing railing at the U.S. Embassy rear guardhouse rooftop and sub-power station rooftops. This was highlighted in the SHEM deficiency priority one list.
The contractor is to supply all material, labor, and tools to complete the following: -
Description:-
This is a deficiency highlighted on the SHEM deficiency priority one list. This was highlighted to safeguard personnel working on the rooftop to protect them from falling off the edges.
Scope of work for deadweight anchors at U.S Embassy Rear Security Rooftop
1. Contractors are to purchase 1 set of deadweight anchor materials and deliver all materials to the Chancery rear CAC guard house.
2. A set of deadweight anchor materials would consist of a central pedestal (attachment point for lanyard), 4 pieces of weight, nuts and bolts to secure all parts during assemble.
3. The deadweight anchor can be able to be used on roofs up to 5° pitch.
4. The deadweight anchor must be able to function as both fall-restraint and fall-arrest system.
5. The length and width of the deadweight is anchor after installation is 1420mm x 1420mm.
6. The deadweight anchor must conform to EN795 Class E, BS 7883 and ISO 14567.
7. The contractor is to move all materials to the Chancery Rear CAC rooftop safely.
8. Assemble the materials into the deadweight anchors on the rooftop.
9. Test and certify the deadweight anchors are in good working condition.
10. Remove debris from the rooftops.
11. Clean the work areas
12. Remove and dispose of trash from the Chancery.
Scope of work for free-standing railings (14m x 2.5m) at U.S Embassy Rear Security Rooftop
1. Railing system must comply with OSHA 29 CFR 1910.29 ⎯ Top rail: 42 inches (+/- inches) capable of withstanding 200 lbs force in any direction.
⎯ Mid-rail: Positioned at 2 inches height, and able to withstand 150 lbs force in any direction.
2. The railings are to be installed into base deadweights instead of counterweights.
3. The deadweight anchors must conform to EN795 Class E, BS 7883, and ISO 14567.
4. The completed system of guardrails and deadweight anchors must meet requirements of OSHA
1910.140(c)(13), to ensure the system is capable of supporting at least 5,000 pounds (22.2 kN) for each employee attached; or has been designed, installed, and used, under the supervision of qualified person, as part of a complete personal fall protection system that maintains a safety factor of at least two.
5. Contractors are to purchase and deliver materials to the Chancery rear CAC guard building.
6. Contractors are to move all materials to the Chancery sub-power station rooftop in accordance with all applicable safety requirements in this statement of work.
7. Contractors are to assemble the materials into the free-standing railings on the rooftop.
8. Contractors are to test and certify the final assembled guardrails are in good working condition and meet the requirements of OSHA 1910.140(c)(13).
9. Contractors are to clean the work area and remove debris from the rooftop.
10. Contractors are to remove and dispose of trash from the Chancery.
Scope of work for deadweight anchors at U.S. Embassy Sub-power station rooftops
1. Contractors are to purchase 2 sets of deadweight anchor materials and deliver all materials to the Chancery rear CAC guard house.
2. A set of deadweight anchor materials would consist of a central pedestal (attachment point for lanyard), 4 pieces of weight, nuts and bolts to secure all parts during assemble.
3. The deadweight anchor can be able to be used on roofs up to 5° pitch.
4. The deadweight anchor must be able to function as both fall-restraint and fall-arrest system.
5. The length and width of the deadweight is anchor after installation is 1420mm x 1420mm.
6. The deadweight anchor must conform to EN795 Class E, BS 7883 and ISO 14567.
7. The contractor is to move all materials to the Chancery Rear CAC rooftop safely.
8. Assemble the materials into the deadweight anchors on the rooftop.
9. Test and certify the deadweight anchors are in good working condition.
10. Remove debris from the rooftops.
11. Clean the work areas
12. Remove and dispose of trash from the Chancery.
NOTE: All work shall comply with US OSHA and Army Corps of Engineers (ACOE) Safety and Health Requirements Manual (EM 385-1-1) in addition to any local requirements (whichever is most stringent).
1. General Safety Requirements
a. The contractor must demonstrate understanding of his/her responsibilities related to the safety requirements by addressing hazards in preplanning processes and meetings.
b. Prior to starting a project, the contractor is required to review the work site and identify hazards that may occur while performing the job.
c. The contractor is expected to provide a “competent person” to implement Site health and safety plan and to oversee its compliance. A competent person is an individual who, by way of training and/or experience, is knowledgeable of applicable standards, is capable of identifying workplace hazards relating to the specific operation, is designated by the employer, and has authority to take appropriate actions.
d. The contractor is required to provide proof of payment of local insurances (EPS, ARL) of all the employees that will be involved in the project. Likewise, the contractor is required to provide monthly payment documents of local insurance for the length of work.
e. The contractor will conduct a safety briefing before starting daily work.
f. Contractor personnel who have signs of drunkenness or who are under the influence of stimulants or hallucinogens will be denied entry to the work area.
g. The contractor shall ensure individuals working at the site are trained and aware of potential hazards.
The contractor shall ensure that these individuals are provided with proper safety equipment to prevent accidental injury in accordance with the requirements of the contract.
h. The contractor must accept the safety standards set by the US Embassy.
i. All workers will remove all chains, rings, watches and/or bracelets during the execution of work.
j. Smoking is prohibited at the work site and will use only designated area for smokers.
k. The contractor will report accidents to the COR who will pass the proper data to the POSHO or Safety
Coordinator.
2. Barricading and Warning Signs
a. The contractor must place provisional barricades and warning signs to maintain a safe and accessible path-of-travel for all pedestrians, including those with disabilities, in order to avoid accidents to third parties. Barricades alert others about hazards created by construction activities and should be used to control vehicular traffic around the work site as well.
b. Erect and maintain for the duration of the Contract proper barricades including fencing material, traffic cones, caution tape and temporary curb ramps complying with all access codes and regulations.
c. Ensure that no construction materials be stored and/or placed on the path-of travel.
d. Maintain the construction barriers in a sound, neat, and clean condition.
3. Personal Protective Equipment (PPE) Requirements
a. Contractor personnel must use personal protective equipment (PPE) required and in accordance with the contracted work.
b. The contractor is required to inspect and maintain spare PPE in case of damage, deterioration or loss of the equipment.
c. The PPE used must meet the technical specifications required by Colombian regulation and international standards.
d. Sharp cutting tools must be carried in Tools Carrying Cases; under no circumstances they are to be carried in uniform pockets.
e. In those tasks where PPE certified is required, the contractor must provide the current certification.
f. The contractor must provide records of PPE received for all the employees involved in the task.
4. Safety inspections requirements
a. All tools, equipment and/or machinery that will be used in the execution of the contracted work must be inspected by a competent person before starting the project.
b. COR and/or Safety representatives of the US Embassy may inspect equipment, tools and/or machinery of the contractor at any time and may request to change it if deemed necessary.
5. Hand and Power Tool Safety
a. The contractor must ensure the safety of tools and equipment used by its employees.
b. Inspected at regular intervals and maintained in good condition all tools in accordance with the manufacture’s specifications.
c. Ensure that tools are used for their intended purposes.
6. Emergency Response Requirements
a. In case of an emergency within the US Embassy facilities and/or during the execution of the contracted work, contractor personnel must follow the instructions given by the Embassy representative
(escort) who is supervising the work, or security personnel.
b. The contractor must not obstruct emergency response equipment such as first aid kits, fire extinguishers, fire cabinets, defibrillators, spill kits, stretchers, eye wash stations or safety signs.
7. High Risk Work Requirements
a. The contractor shall submit certificates of training for each person who will conduct the task. These certificates must be submitted before starting the execution of the project.
b. The contractor shall prepare a work permit specifically for the task and must be provided to the COR before the initiation of work.
c. The contractor must send a risk assessment of the task in a minimum period of eight working days before commencement of work. The POSHO or Safety Coordinator will review the document and make any comment it deems necessary.
d. The execution of high-risk activities will be carried out with a minimum of two people present that may give first aid or notice in case of emergency.
8. Electrical Safety
a. The contractor shall fully comply with the local regulation and the Embassy policies related with electrical safety work practices and work-de energized to prevent any incident that may impact the health of personnel and Embassy and residential units’ electrical systems
b. It is Department policy that energized “live” parts to which an employee may be exposed must be de-energized before the employee works on or near them. If de-energizing them introduces or increased hazards or is unfeasible, you must contact your point of contact at the Embassy to report such situation before carrying out the work.
c. All personnel conducting electrical work shall be sufficient trained and considered as competent persons prior to performing the work.
d. The contractor should identify any potential sources of electrical energy likely to cause death, injury, or serious physical harm.
e. Ensure all work is performed in accordance with local regulation and U.S. standards.
f. The contractor must provide the appropriate equipment and tools for the work in compliance with the requirements of the contract.
g. During the execution of work on the electrical system, contractor personnel must remove conductive jewelry such as watches, rings, chains and/or bracelets.
h. Non-conductive (fiberglass) ladders should be used for electrical work or near electrical hazards.
9. Fall Protection Requirements
All work performed at more than 1.50 meters (5ft) is considered work at heights based on local laws, therefore the contractor must strictly comply with local Resolution 1409/2012:
a. All equipment to work at elevated surfaces must meet at least the ANSI Z359.1 standards or European counterparts.
b. All contractor personnel using equipment for work at heights must follow the instructions and warnings associated with such equipment.
c. Contractor personnel will not use as an anchor point for work, ladders, piping or pipe supports.
d. If an anchor point does not offer the recommended resistance for fall protection (5000lbs), the contractor must provide protective equipment for heights with dampers that may decrease the impact force.
e. Scissor scaffolds are prohibited. Only use multi directional/modular scaffolding properly certified.
f. Use dielectric ladders to work with electricity and areas with electrical influence.
g. It is forbidden to stand on or above the second top rung of the ladders.
h. All personnel performing work above 5 ft (1.5mts) must use at least the following personal protection equipment: helmet (dielectric if needed), with chin strap and three support points, safety glasses that protect eyes from impacts, with UV protection; hearing protection if necessary, gloves with high resistance to abrasion, slip reinforced toe boots, work clothes according to weather conditions and risk factors and proper fall protection systems.
i. The contractor must submit to the COR, in a minimum period of eight working days before starting the work, the training certificates of all workers who will perform the job. The certificate must comply with the provisions of Resolution 3673/ 2008. A re-training should be provided to employees at least once a year as required by local legislation.
10. Scaffolding Requirements
a. The contractor is responsible for proving safe conditions when using, erecting and breaking down scaffolding.
b. Scaffolds should be erected and dismantled by competent workers, under the supervision of knowledgeable and experienced supervisors.
c. Scaffolds should be erected on a rigid surface, capable of carrying the maximum intended load without settling or displacement.
d. Ensure scaffold is equipped with standard guardrails and toe boards on all open sides ends of platforms four to ten feet in height.
e. Provide an access ladder or equivalent safe access.
f. Supported scaffolds with a height to base width ratio of more than four to one (4:1) shall be restrained from tipping by guying, tying, bracing, or equivalent means.
11. DOSAR Additional Safety Measures Clause 652.236-70 ADDITIONAL SAFETY MEASURES (OCT 2017)
In addition to the safety/accident prevention requirements of FAR 52.236-13, Accident Prevention
Alternate I, the contractor shall comply with the following additional safety measures.
(a) High risk activities. If the project contains any of the following high risk activities, the contractor shall follow the section in the latest edition, as of the date of the solicitation, of the U.S. Army Corps of
Engineers Safety and Health manual, EM 385-1-1, that corresponds to the high risk activity. Before work may proceed, the contractor must obtain approval from the COR of the written safety plan required by
FAR 52.236-13, Accident Prevention Alternate I (see paragraph (f) of this clause), containing specific hazard mitigation and control techniques.
Scaffolding;
1) Work at heights above 1.8 meters;
2) Trenching or other excavation greater than one (1) meter in depth;
3) Earth-moving equipment and other large vehicles;
4) Cranes and rigging;
5) Welding or cutting and other hot work;
6) Partial or total demolition of a structure;
Additional Notes
The Embassy COR will work directly with the contractor ensuring all Safety Requirements are met as describe in this document and in case it is needed the COR will report to the Embassy POSHO or Safety
Coordinator any deficiency found before or during the execution of the project.
In case the COR identifies unsafe acts or conditions that could significantly affect the health or safety of
Embassy personnel, contractors, subcontractors, third parties or government property, the work can be stopped by the COR until the condition is fixed. If different work conditions appear during the project, the COR can indicate further safety requirements to the contractor.
The COR may share safety related information with the POSHO and Safety Coordinator to guarantee personnel safety and government property conservation.
END
File details come from the government source that posted it. Updated .