Attachment 1 - QASP NWI Pathology.pdf
PDF 250 KB Posted
- Attached to
- NWI Offsite Pathology Services
- Solicitation number
- 36C26326R0063
About this file
This is a Quality Assurance Surveillance Plan (QASP) for pathology services provided to the VA Nebraska Western Iowa Health Care System (VISN 23).
The QASP establishes systematic performance monitoring for a contractor providing pathology services to VA NWIHCS. The plan identifies what will be monitored, how monitoring occurs, who conducts surveillance, and how results are documented. Key performance measures include: Patient ID Rate (100% acceptable quality level with monthly report review), Cytology Report Completion (95% AQL for gynecological cases within 14 working days and non-gynecological cases within 5 working days), Timely Invoicing (98% AQL requiring all itemized invoices within 30 days of month-end via VA Invoice Payment Processing System), Specimen Slide Labeling (100% AQL with zero mislabeled specimens), Global Case Review (100% AQL requiring 10% monthly review of global cases with monthly reporting by the 20th), Autopsy Provisional Reports (100% AQL requiring delivery within 2 working days via encrypted email and secured fax), Autopsy Final Reports (100% AQL requiring submission within 30 working days), Malignancy Notification Documentation (100% AQL requiring documentation of date, time, and recipient for all first-time suspicious/malignant cases), and Privacy, Confidentiality & HIPAA Compliance (100% AQL with zero breaches). The Contracting Officer is NCO 23 (Department of Veterans Affairs, Network 23), with Susan Dover serving as Primary COR and Cassie Rezac as Alternate COR. Performance ratings follow CPARS standards (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory), with the CO responsible for final adequacy determinations. The plan includes a Contract Report form for documenting deficiencies and required corrective actions, and mandates quarterly and semi-annual performance communication between the COR and contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
VA NWIHCS Pathology Services
The contractor will be evaluated in accordance with the following:
1. PURPOSE: This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored
• How monitoring will take place
• Who will conduct the monitoring
• How monitoring efforts and results will be documented
a. This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
b. This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES: The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.
The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: NCO 23 Contracting Office:
Organization or Agency: Department of Veterans Affairs, Network 23 Contracting Office
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file.
The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned CORs: Susan Dover, Primary COR P&LMS Lab Manager Cassie Rezac, Alternate COR, Pathology Department
Organization or Agency: Department of Veterans Affairs, VISN 23 Nebraska Western Iowa Health Care System, Omaha Division
3. CONTRACTOR REPRESENTATIVES:
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract:
Primary:
Alternate:
4. PERFORMANCE STANDARDS: The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined.
a. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
b. The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE: Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. REVIEW MONTHLY REPORT: 100% surveillance via monthly report.
b. CYTOLOGY: 100% surveillance
c. INSPECTION – TIMELY INVOICES: The COR reviews the invoice through the VA Invoice Payment Processing System (IPPS) to ensure that the invoice is timely and accurate.
d. DOCUMENTATION WHEN SLIDES ARE RECEIVED: Upon receipt of slides, VA NWIHCS Pathology & Laboratory
Medicine Service will identify when specimen slides are mislabeled.
6. QASP PERFORMANCE REPORT:
PERFORMANCE MEASURES
Measure PWS
Reference Performance Requirement
Standard Acceptable Quality Level
Method of Surveillance Met AQL / DID
NOT MEET AQL-
CPAR RATING /
COMMENTS
Patient ID Rate
3.13.1
Patient ID Rate
(JC requirement)
There will be no charge to the VA for any re-testing due to contractor error.
Patient’s name (first and last), full SSN and/or full Date of Birth (DOB) or identification number (i.e., case number).
100% Review monthly report
Cytology 3.13.2 3.4.1.2
Cytology Report Completion 100% Surveillance
Gynecological (GYN) within fourteen (14) working days;
Non-GYN within five (5) working days
95% Review of Cytology Report
Timely Invoicing
3.13.3
5.2.1
Within 30 days of the end of each month services were provided, as described above, All itemized invoices provided within 30 days of end of prior month services delivered.
98% VA Invoice Payment Processing System (IPPS)
Performance Requirement
Standard Acceptable Quality Level
Method of Surveillance Met AQL / DID
NOT MEET AQL-
CPAR RATING /
COMMENTS
the vendor shall provide itemized invoicing
Tests / Reports
3.13.4 0% of Specimen Slides Mislabeled
No mislabeled specimens
100% Documentation when slides are received
10% Review
3.13.5 Global Case
Review
Review and report 10% of all global cases monthly per accrediting agency guidelines. Prepare monthly report and deliver to the COR by the 20th day of the following month. Any discrepant results must be communicated within one (1) working day to a VA Pathologist.
100% Review all monthly SNOMED cases and review submitted global case reports.
Autopsy 3.13.6 Provisional Report 100% Surveillance
Provisional anatomic diagnosis must be provided to the VA within 2 working days via encrypted e-mail and secured fax.
100% Review monthly report
Autopsy 3.13.7 Final Report 100% Surveillance
The completed post-mortem exam, with final copy of succeeding pages must be submitted to the VA within 30 working days, unless exceptions for special studies are established by the medical staff.
100% Documentation when slides are received.
Malignancy Notification Documentat ion
3.13.8 According to
Directive 1106 –
pg. 48 (i)(5)
pg. 59 (bb)
All cases to be faxed.
Documented in the report: date, time and whom the Pathologist called for all first time suspicious/maligna
100% Review of final monthly reports.
Performance Requirement
Standard Acceptable Quality Level
Method of Surveillance Met AQL / DID
NOT MEET AQL-
CPAR RATING /
COMMENTS
nt cases. New malignancies, per handbook require documentation of second review.
Privacy, Confidential ity &
HIPAA
3.13.9
Contractor is aware of all laws, regulations, policies, and procedures relating to Privacy, Confidentiality and HIPAA and complies with all standards
Zero breaches of privacy or confidentiality
100% Random Sampling.
Contractor shall provide evidence of annual training required by facility, reports violations per VA Handbook 6500.6
7. CPARS RATINGS: Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/pdfs/CPARS-Guidance.pdf p.
A2-1):
Exceptional: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
Very Good: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
Satisfactory:
(Acceptable Quality Level)
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.
Marginal: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
Unsatisfactory: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT.
https://www.cpars.gov/pdfs/CPARS-Guidance.pdf
However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE
ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
c. The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
d. Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR on the following page.
9. FREQUENCY OF MEASUREMENT:
a. Frequency of Measurement: The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed
b. Frequency of Performance Reporting: The COR shall communicate with the contractor on a quarterly and semi-annual basis. Formal written reports, as outlined in the contract, will be submitted to the Contracting Officer for review of contractor performance
10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
DATE
DATE
SIGNED:
Susan Dover, Pathology/Laboratory Manager, COR
SIGNED:
Contractor Representative
CONTRACT REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS ISSUE
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION.
13. GOVERNMENT ACTIONS
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
| a. REVIEW MONTHLY REPORT: 100% surveillance via monthly report. |
| b. CYTOLOGY: 100% surveillance |
| c. INSPECTION – TIMELY INVOICES: The COR reviews the invoice through the VA Invoice Payment Processing System (IPPS) to ensure that the invoice is timely and accurate. |
| d. DOCUMENTATION WHEN SLIDES ARE RECEIVED: Upon receipt of slides, VA NWIHCS Pathology & Laboratory Medicine Service will identify when specimen slides are mislabeled. |
| a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR). |
| b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and... |
| c. The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. ... |
| d. Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR on the following page. |
| Text6: | |
| Text7: | |
| 2026-09-10T12:58:03-0500 | |
| SUSAN DOVER |
| Date10_af_date: 9/10/26 |
| Date11_af_date: |
File details come from the government source that posted it. Updated .