Attachment 1 - QASP.docx
DOCX document 28 KB Posted
- Solicitation number
- 36C26022Q0019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 36C26022Q0019 A00001.docx | DOCX document | |
| 36C26022Q0019 A00001.docx | DOCX document | |
| Attachment 6 - Contractor Rules of Behavior.docx | DOCX document | |
| Attachment 4 - Background Investigation Process.docx | DOCX document | |
| Combined Synopsis Solicitation.docx | DOCX document | |
| Attachment 7 - Organizational Conflicts of Interest.docx | DOCX document | |
| 36C26022Q0019.docx | DOCX document | |
| Attachment 2 - SCA WD 2015-5563 Rev. 13.pdf | ||
| Attachment 8 - Instructions for the Preparation of Quotes.docx | DOCX document | |
| Attachment 3 - VA Information Privacy.docx | DOCX document | |
| Attachment 5 - Contractor Employees Legal Status.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 - QUALITY ASSURANCE SURVEILLANCE PLAN
The Contractor will be evaluated in accordance with the following:
1.0. PURPOSE: This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
1.1. This QASP does not detail how the Contractor accomplishes the work. Rather, the QASP is created with the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
1.2. This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the Contractor through contract modification. Copies of the original QASP and revisions shall be provided to the Contractor and Government officials implementing surveillance activities.
2.0. GOVERNMENT ROLES AND RESPONSIBILITIES: The following personnel shall oversee and coordinate surveillance activities.
2.1. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the Contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Assigned CO: Laura Park Organization or Agency: Network Contracting Office 20
2.2. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the Contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Carol Rentz Organization or Agency: VA Portland Health Care System Imaging Department
3.0. CONTRACTOR REPRESENTATIVES:
The following employee(s) of the Contractor serve as the Contractor’s program manager(s) for this contract.
Primary: ____________________________ Alternate: ____________________________
4.0. PERFORMANCE STANDARDS:
4.1. The Contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of Contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
4.2. The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine Contractor performance and shall compare Contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the Contractor on the contract.
5.0. METHODS OF QA SURVEILLANCE:
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
5.1. Direct Observation: 100% surveillance
5.2. Periodic Inspection. Inspections scheduled and reported quarterly per COR delegation or as needed. Periodic reviews of at least ten (10) randomly selected patient documents/files will be reviewed per initial inspection period (60 days) and every six (6) months. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.)
5.3. Random Sampling. Random reviews of at least ten (10) randomly selected patient documents/files will be reviewed per initial inspection period (60 days) and every six (6) months thereafter. All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.
5.4. Verification and/or documentation provided by Contractor. COR will review invoices, training certificates, licenses, etc. All documentation that is outlined in the PWS will be provided to the COR when requested.
| Measures |
| PWS |
Reference Performance Requirement
| Standard |
| Acceptable Quality Level |
| Surveillance |
Method Met AQL/DID NOT MEET AQL-
CPAR RATING/ADD
| 1 – Scope of Work |
| 7.1.3.1. |
| Provide required medical service as specified in the PWS. |
| Qualified personnel are available and in location as needed to properly perform tasks as specified. |
| 90% |
| Random Inspection and Documentation |
Direct Observation
| 2 - Patient Safety |
| 7.1.3.2. |
| Patient safety incidents must be reported using Patient Safety Report. |
| All incidents reported immediately (within 24 hours.) |
| 90% |
| Direct Observation |
Verification and Documentation
| 3 - Maintains licensing, registration, and certification |
| 7.1.3.3. |
| Updated Licensing, registration and certification will be provided as they are renewed. |
| Licensing and registration information kept current. |
| 95% |
| Verification and Documentation |
Contractor to provide documented evidence
| 4 - Mandatory Training |
| 7.1.3.4. |
| Contractor completes all mandatory required training |
| Contractor will complete all required training per VAMC policy |
| 85% |
| Verification and Documentation |
Contractor to provide documented evidence
| 5 - Privacy, Confidentiality and HIPAA |
| 7.1.3.5. |
| Contractor is aware of all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA and complies with all standards |
| Zero breaches of privacy or confidentiality |
| 90% |
Verification and Documentation Random Sampling Direct Observation
| 6 - Timely Invoicing |
| 7.1.3.6. |
| Within 30 days of the end of each month services were provided, as described above, the Contractor shall provide itemized invoicing |
| All itemized invoices provided within 30 days of end of each month services delivered |
| 90% |
| Verification and Documentation |
Periodic Inspection
PERFORMANCE MEASURES
6.0. RATINGS: Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
| EXCEPTIONAL: |
| Performance meets contractual requirements and exceeds many to the |
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
| VERY GOOD: |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective. |
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
| SATISFACTORY: |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory. |
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the Contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
| MARGINAL: |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented. |
Note: To justify Marginal performance, you should identify a significant event in each category that the Contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the Contractor of the contractual deficiency (e.g,. Management, Quality, Safety or Environmental Deficiency Report or letter).
| UNSATISFACTORY: |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the Contractor’s corrective actions appear or were ineffective. |
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the Contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the Contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
7.0. DOCUMENTING PERFORMANCE:
7.1. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using Contractor Performance Assessment Report (CPAR).
7.2. If Contractor performance does not meet the Acceptable Quality level, the CO shall inform the Contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the CO determines formal written communication is required, the CO shall prepare a Contract Discrepancy Report (CDR) and present it to the Contractor's program manager.
7.3. The Contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the Contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the Contractor has to present this corrective action plan to the CO. The Government shall review the Contractor's corrective action plan to determine acceptability. The CO shall also assure that the Contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance and the acceptability of the Contractor’s corrective action plan.
7.4. Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
8.0. Frequency of Measurement:
8.1. Frequency of Measurement: The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
8.2. Frequency of Performance Reporting: The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.
9.0. CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
CONTRACTOR NAME/TITLE DATE
CONTRACT REPORT
| 1. CONTRACT NUMBER |
| 2. REPORT NUMBER FOR THIS DISCREPANCY |
| 3. TO: (Contracting Officer) |
| 4. FROM: (Name of COR) |
5. DATES
a. CR PREPARED
| b. RETURNED BY CONTRACTOR: |
| c. ACTION COMPLETE |
6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
| 7. SIGNATURE OF COR |
| Date: |
| 8. SIGNATURE OF CONTRACTING OFFICER |
| Date: |
| 9a. TO (Contracting Officer) |
| 9a. FROM (Contractor) |
10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
| 11. SIGNATURE OF CONTRACTOR REPRESENTATIVE |
| Date: |
12. GOVERNMENT EVALUATION.
13. GOVERNMENT ACTIONS
14. CLOSE OUT
| NAME |
| TITLE |
| SIGNATURE |
| DATE |
CONTRACTOR NOTIFIED
COR
CONTRACTING OFFICER
File details come from the government source that posted it. Updated .