This Quality Assurance Surveillance Plan outlines methods for monitoring contractor performance on a contract to provide outfitter guide services for wilderness leadership training. The government will assess equipment, safety practices, and meal provision on trips using inspections and customer feedback, with deductions from payment rates of up to 5% for deficiencies exceeding defined defect limits. Acceptable quality levels and maximum allowable defect rates are specified for equipment, safety, and meals. Deductions will apply if defects exceed the rates. The related federal contract opportunity is solicitation number 1284LM24Q0001 for outfitter guide services issued by the Department of Agriculture Forest Service to support Carhart National Wilderness Leadership Training.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Applicable Wage Determinations.pdf | ||
| 1284LM24Q0001.docx | DOCX document | |
| Attachment 3 Experience Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Wilderness Trips
1. Purpose: This Quality Assurance Surveillance Plan (QASP) describes methods that will be used to monitor the Contractor’s performance. The QASP is not part of the Contract. It is provided to the Contractor solely for informational purposes and is subject to change by the Government during the life of the contract. The Government reserves the right to perform assessments more or less often than outlined in this QASP.
2. Introduction: The QASP establishes methods to assess or evaluate performance of the Contractor under the contract. It is designed to provide an effective method of monitoring Contractor Performance for each objective on the Performance Requirements Summary (PRS) in the contract. The Government is concerned with the quality of the services provided, and not with the method that the Contractor uses to provide the services.
3. Responsibility for Quality Control: The Contractor is responsible for quality control and management actions to meet the performance requirements and terms of the Contract. The Government performs quality assurance to assess the quality of services rendered, and to verify the services meet the contract requirements, and contract standards are achieved. Quality Control for Commercial Items is in accordance with accepted industry practices.
4. Surveillance Methods: The Government will evaluate the Contractor’s performance under this contract. Examples of Government surveillance may include:
a. Government Inspections.
b. Customer complaints with verification by the CO or COR.
5. Deduction Methods: The Government will record performance noting any substandard performance. For substandard performance, the Government’s preferred course of action will be discussions with the Contractor to make the Contractor aware of the problem, and to effectively prevent any recurrence of substandard performance. The Government may also take the following actions:
| a. | Presentation of a Contract Discrepancy Report requiring a written explanation for substandard performance. |
| b. | Payment deductions in accordance with the PRS; |
| c. | Payment deductions in accordance with the applicable FAR clause(s). |
| d. | Require correction or re-performance of the service. |
QUALITY ASSURANCE SURVEILLANCE SUMMARY
| Performance Objective |
| Maximum Allowable Defect Rate |
| Surveillance Method |
| AQL/Deductions |
| Contractor provided equipment (all equipment is in good working order, i.e. all zippers work, tent flies appropriate for tent to repel water, sleeping bags clean and correct temp allowance for climate, etc) |
| 2 defects per trip |
| COR Inspections |
Customer Feedback 2% deduction from established trip rate for the complete trip being provided when standards are not met.
| Contractor safety (all safety standards are met for the type of trip and safe practices are used in all instances |
| 1 defects per trip (or zero) |
| COR Inspections |
Customer Feedback 5% deduction from established trip rate.
| Contractor provided meals (all dietary needs are met and menu approved in advance per contract) |
| 2 defects per trip |
| COR Inspections |
Customer Feedback 2% deduction from established trip rate for the complete trip being provided when standards are not met.
Deduction Threshold. If the number of defects, or instances of unacceptable performance, observed during an individual trip is equal to or less than the maximum allowable defect rate (MADR), then there will be no deduction in payments to the Contractor for that task. However, if the number of defects observed during a trip is greater than the MADR, then there will be a deduction in payments to the Contractor for that task order.