Attachment 1 - PWS Sections C.4.1 - C.4.6.docx

DOCX document 66 KB Posted

Attached to
Equipment Related Services for maintenance, repair and overhaul, equipment modification, installation of equipment and technical representative services.
Solicitation number
ERS-MS-CI01
Issued by

About this file

This document is a Performance Work Statement (PWS) detailing comprehensive equipment-related services for the U.S. Army Contracting Command Detroit Arsenal's TACOM Service Solutions (TS3) program. The PWS covers an extensive range of technical support functions across multiple phases of equipment lifecycle management, including materiel acquisition, product assurance, logistics management, industrial base operations, program management, and internal operations support. Key service areas include pre-production and production phase support, system integration, testing and evaluation, maintenance, configuration management, training development, supply chain management, and technical representative services.

The PWS outlines detailed requirements for supporting military equipment and systems, encompassing tasks such as test planning, lifecycle logistics, human systems integration, product support, equipment modifications, depot-level maintenance, and logistics enterprise system support. The scope extends to both domestic and international locations, with services potentially involving maintenance, repair, overhaul, technical analysis, training, and logistics support for various military platforms and technologies. The document emphasizes comprehensive support across equipment lifecycle stages, from initial design and testing through operational deployment, sustainment, and eventual demilitarization, with a focus on maintaining military equipment readiness and performance.

View the file

Other files

File Type Posted
TS3 ERS Suite Ceiling Increase Market Survey.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1: PWS Sections C.4.1 – C.4.6

C.4.1 Materiel Acquisition Support: The contractor shall provide equipment and logistics related services that support technologies, hardware, vehicle systems, weapon systems, and software as a part of the Materiel Acquisition Process.

C.4.1.1 Pre-Production Phase Support: The contractor shall plan, manage and execute the following, as specified in the awarded TO issued hereunder:

a) Test, evaluation, and demonstration activities, to include the following: preparation of test and evaluation strategy and test plans, development of the Test and Evaluation Master Plan (TEMP), engineering support for operational assessments and Live Fire Test and Evaluations (LFT&E), to include: component and system-level testing, advanced technology demonstrations and outcome-based performance measures, developmental test and evaluation, technical support and interpretation of results of Operational Test and Evaluation (OT&E);

b) Lifecycle logistics functions, IAW standards and regulations identified in the awarded TO issued hereunder, to include the following: training plans, manpower estimates, Human System Integration (HSI) strategy, repair analysis, assessments for special sets/kits/tools/outfits, special test, measurement, and diagnostic equipment, HAZMAT impact, environmental, occupational health evaluation and Chemical, Biological, Radiological, Nuclear, and High Yield Explosive (CBRNE); training plans, human systems integration portion of Manpower Integration (MANPRINT), manpower estimates, systems support and maintenance objectives and requirements, interoperability; performance based logistics, unique item identification, training plans, human systems integration strategy, manpower estimates, interoperability, product support plan and capability, and review special kits, outfits, sets, tools, test, measurement and diagnostic equipment; design and develop packaging and handling systems and storage requirements for design systems or components.

C.4.1.2 Production and Deployment Phase: The contractor shall provide testing services, and integration and interoperability services to include tear down, inspection, and recommended fixes. This work may include tasks such as the following: failure analysis, engineering design review for life cycle cost reductions, and product-change analysis of components and end items. The contractor may provide component and vehicle testing, design analysis, design layout and simulation, prototype build and delivery of recommended design changes to the Government. The contractor shall provide services for production and deployment phase-specific processes and activities to include the following:

a) Test and evaluation activities to include the following: Initial Operational Test and Evaluation (IOT&E) technical support and execution, LFT&E execution and report, Production Verification Testing (PVT) and First Article Testing (FAT) technical support, high altitude electromagnetic pulse testing, and TEMP execution and assessment; and

b) Lifecycle logistics activities to include the following: performance based logistics, unique item identification, human systems integration, manpower estimates, interoperability certification, and review of special kits, outfits, sets, tools, support equipment and test, measurement and diagnostic equipment.

C.4.1.3 Operations and Support Phase: The contractor shall provide services for operations phase-specific processes and activities to include the following:

a) Test and Evaluation activities to include the following: Follow-on Test and Evaluation (FOT&E) planning and execution, preparation and execution of test plans for new components and systems to include lab and vehicle performance and durability testing;

b) Lifecycle logistics activities to include the following: performance based logistics, unique item identification, technical manuals, human systems integration, and special kits, outfits, sets, tools, test, measurement and diagnostic equipment;

c) IT and IA activities to include the following: monitoring of system changes to determine impact on spectrum supportability and E3; continued life cycle compliance with the information support plan, to include updates for each major weapon system upgrade, interoperability requirements certification, and the information technology and national security system interoperability certification; and support continued life cycle compliance with information assurance certification and accreditation;

d) Fielded system sustainment activities to include the following: technology insertion, systems integration, modification kit development and implementation, value engineering, Operations & Support Cost Reduction (OSCR) initiatives, resolve spare parts technical and obsolescence issues, support industrial base, qualify additional spare parts sources, investigate and resolve fielded vehicle performance, safety, and reliability issues, perform root cause analysis and failure analysis, develop, fabricate, and test solutions, develop Modification Work Orders (MWOs), update and validate Technical Data Packages (TDPs), provide technical input and support to RESET/RECAP programs, maintenance, overhaul, rebuild and develop systems modernization plans; and

e) Support program management activities including technical and administrative support for program reviews, milestone decision events, cost/benefits analysis, cost estimating, and industrial capability/competition analysis.

C.4.1.4 Demilitarization and Removal from Service: The contractor shall provide services for demilitarization and disposal activities as specified in the individual TO.

C.4.1.5 Systems Integration: The contractor shall provide system integration of hardware and software, to include the following:

a) Integrate hardware and software into subsystems or components into the systems; systems into System of Systems; and systems onto platforms;

b) Identify and assess constraints that the integration processes, including assembly sequencing, fixtures, hardware and compilers (software), may impose on the design solution;

c) Integrate hardware and software at the component, subsystem and system level in a test, verification, validation and operational environment;

d) Furnish services for installation of hardware and software and technical manual development;

e) Troubleshoot and correct system or component failures;

f) Generate and maintain validation records;

g) Design system models and fabricate prototype equipment;

h) Modify existing equipment to optimize system of systems integration;

i) Develop procedures, plans, and methodologies for demonstration and evaluation of operational interoperability;

j) Furnish technical support for validation events and requirements, such as the following: development or testing of prototypes, performance of simulations, preparation and evaluation of mock-ups of the system, modeling or simulation of the systems intended operational environment;

k) Develop and maintain documentation to assess whether the system element was built IAW the design-to or build-to specifications including performance of reliability, availability, maintainability analysis;

l) Perform physical examinations, demonstrations, and testing;

m) Prepare system element(s) for integration, verification, and validation, to include, testing and input to appropriate reviews and reporting; and

n) Develop operations, maintenance, and installation manuals.

C.4.1.5.1 Standardization: The contractor shall prepare and implement an overall standardization program plan for specified systems and subsystems. The standardization program plan shall optimize the commonality of parts, components, and subcomponents. The standardization program plan shall conform to the Army's Implementation Plan (AIP).

C.4.1.5.2 Human System Integration (HSI): The contractor shall validate human factors engineering analysis, simulation, testing, evaluation, documentation and reporting IAW MIL-HDBK 759B and MIL-STD 1472D. The contractor shall evaluate the human machine interface for system operators and maintainers.

C.4.1.5.3 System Safety: The contractor shall perform health hazard, hazardous materials and other safety related analyses. The contractor shall identify safety features of hardware, software and integrated systems design and the associated mitigating designs, procedures, precautions, training, engineering controls, equipment and protective procedures in order to achieve an acceptable risk. The contractor shall conduct hazard evaluations, accident evaluations and reports, and prepare Safety Assessment Reports (SAR) IAW MIL-STD 882. The contractor shall prepare System Safety Plans, Hazardous Material Management Plans and input to the system MANPRINT Management Plan. The contractor shall participate in System Safety Working Groups and represent Safety engineering on other Integrated Product Teams (IPT) and meetings.

C.4.1.6. Producibility: The contractor shall evaluate the inherent producibility of proposed technologies, designs and design changes, and identify and evaluate the associated issues and impacts on economic feasibility of production. The contractor shall identify improvements in the design that would result in an economically producible design.

C.4.1.7 Configuration Management (CM): The contractor shall operate and maintain a CM system for any design or system, hardware or software, assigned to the contractor as a design agent, authority or custodian IAW MIL-HDBK 61A(SE) and MIL-STD 3046. This work shall include the following:

a) Provide recommendations and analyses for the specified aspects of CM, to include, managing the configuration for "as designed", "as approved", "as authorized", and "as supported" configuration baselines;

b) Serve as the configuration baseline manager and manage and maintain TDPs. This work shall include digitizing, updating, reviewing or validating drawings or other documents in a consistent electronic format, maintaining legacy technical data, and establishing virtual databases for customers; and

c) Conduct configuration verifications through a Physical Configuration Audit or a Configuration Item Verification Review using the appropriate equipment.

C.4.1.8 Product Improvements: The contractor shall provide evaluation expertise for potential improvements with respect to system or subsystem functionality and affordability. Potential improvements shall include the following: survivability, mobility, lethality, seaworthiness, protection, energy efficiency, Safety of Life at Sea (SOLAS) requirements, sustainability, performance, operating, cost reduction, and value engineering. Services shall include the following: providing personnel with demonstrated expertise in support of Modernization through Spares (MTS) and OSCR initiatives, tradeoff analysis, cost benefit analysis or life cycle cost projections, or in the conduct of pilot projects and demonstrations relevant to fact based evaluation of such services.

C.4.1.8.1 Value Engineering (VE) and OSCR: The contractor shall provide VE and OSCR program services to include the following: design, prototype, test, trial fit, low rate production and identification of candidates for VE or OSCR and the associated analysis.

C.4.1.9 Infrastructure, Laboratories and Equipment Support: The contractor shall provide support for infrastructure and utilization for laboratories. The contractor shall provide support for the following: laboratory master planning activities space allocation, design for architectural construction and architectural projects, equipment installation general, special, and emergency events support as specified in the individual TO.

C.4.1.9.1 Laboratory Maintenance and Technical Support: The contractor shall operate and perform preventive maintenance, repair, and replacement for all shop, prototype, industrial, laboratory type equipment to include purchase, operation, and maintenance of specialty equipment used for research, design, and prototype activities. This shall include support for all hand receipt or durable equipment items as specified in the individual TO.

C.4.2 Product Assurance and Test Services:

C.4.2.1 Test Services:

C.4.2.1.1 Test Plans: The contractor shall prepare, coordinate inputs, submit, and update project and program TEMPs and related documents.

C.4.2.1.2 Test Integration Work Group (TIWG) Participation: The contractor shall attend and participate in TIWG and Test Coordination Meetings.

C.4.2.1.3 Test Site Services: The contractor shall provide technical and administrative services at both Government and contractor such as the following: on-going testing, coordination activities, attending test meetings, coordinating visits and briefings, and providing test incidents and report summaries.

C.4.2.1.3.1 Test Incident Reports (TIR) and Data: The contractor shall collect, collate, and analyze TIRs prepared by both Government and contractor test agencies. The contractor shall schedule, attend, and participate in TIR review and closeout meetings. The contractor shall monitor progress and report status of failure analysis to close-out.

C.4.2.1.3.2 On-Site Test Representatives: The contractor shall perform surveillance of test activities through on-site representation such as monitoring the progress of tests, condition of test assets and test services equipment, availability of repair parts, status of equipment repair, and other similar test-related activities. The contractor shall attend meetings or briefings and submit surveillance reports.

C.4.2.1.3.3 System Support Packages (SSP): The contractor shall perform studies, analysis and evaluate kitting and assembling to transport the SSP to the specified test site, as specified in the individual TO. The contractor may be required to track the initial delivery, consumption and replenishment of components and maintain control of the SSP. The SSP shall include all required components for testing services and shall identify existing tools and test equipment used to perform testing services to include known Government tools and test equipment. The SSP shall consist of all items on the SSP Components List (SSPCL). The SSP requirements shall include repair parts, technical manuals, Basic Issue Items (BII) common and special tools, and test equipment.

C.4.2.1.3.3.1 System Support Packages Components List (SSPCL): The contractor shall prepare and provide a SSPCL that identifies the contents of the SSP for each test site and the activity responsible for each SSP item.

C.4.2.2 Quality Assurance (QA): The contractor shall provide QA and quality engineering services. Efforts shall include, but are not limited to, the following: developing quality assurance requirements and quality assurance procedures, reviewing and analyzing weld procedures (for armor and vessel construction and repair), overseeing software quality processes and products, analyzing compliance, monitoring tests, reviewing contractor quality assurance systems, and participating in quality audits, FAT and other tests. The contractor shall review, analyze, and document findings from Quality Deficiency Reports identifying root cause and proper corrective actions.

C.4.2.3 Reliability, Availability, Maintainability (RAM) Program Services: The contractor shall provide RAM services. Tasks shall include the following: analyzing data, reviewing and critiquing program plans, participating in conferences and meetings, auditing contractor field failure analyses and corrective action programs, and researching alternative solutions for performance or reliability issues. These efforts shall include the following:

a) Development or review of Reliability/Maintainability Program Plans;

b) Conducting Failure Modes Effects and Criticality Analysis;

c) Participating in the analysis of existing systems to formulate Operational Modes Summary Mission Profile and the associated RAM annexes;

d) Generating RAM allocations to systems, subsystems and components;

e) Creating and updating RAM predictions and growth curves based upon the Failure Mode, Effects, and Criticality Analysis (FMECA) and the results of testing and data searches;

f) Conduct or support RAM scoring conferences;

g) Conduct or support RAM management or RAM related segments of IPTs and program or project reviews; and

h) Failure Reporting Analysis and Corrective Action System (FRACAS) actions.

C.4.3 Logistics Management:

C.4.3.1 Integrated Product Support (IPS) Management Services: The contractor shall plan, manage, integrate and execute an IPS program for specified system or equipment. Tasks shall include the following: participation in engineering design reviews, participation in diagnostics strategy meetings, developing IPS assessments for specific elements of IPS, participation in IPS meetings, program reviews, and other related meetings and events for the specified system, and preparing and maintaining a logistics support package.

C.4.3.1.1 IPS Management and Supportability IPT (SIPT) Support: The contractor shall participate in and support IPS Management and SIPT activities. All IPS program requirements, tasks, and milestones shall be maintained by the SIPT. The contractor shall support the mission of the Product Support Manager and the IPS Manager.

C.4.3.1.1.1 IPS Acquisition Documents: The contractor shall research, prepare and recommend updates to Acquisition Strategy and Acquisition Plans for IPS. The contractor shall prepare drafts of specified logistics acquisition documents as contained within the DoD 5000 series regulations, following the requirements of the applicable regulations and pamphlets, as these documents are identified by individual TOs.

C.4.3.1.1.2 IPS Planning: The contractor shall prepare and maintain the Life Cycle Sustainment Plan (LCSP)IAW AR 700-127. Services shall include describing the overall IPS program, including all IPS program requirements, tasks, and milestones.

C.4.3.1.1.2.1 IPS Elements: The contractor shall provide the preliminary planning, analysis, financial management, a draft IPS Master Schedule, and associated work for the individual logistic support elements to acquire, field, and support assigned systems.

C.4.3.1.1.3 MANPRINT Program Support: The contractor shall plan, manage, and support the MANPRINT effort to optimize total system performance, reduce life cycle costs and minimize risk of personnel loss or injury by ensuring a systematic consideration of the impact of materiel design on human systems throughout the system life cycle for specified systems IAW AR 602-2 or other regulations as specified in the individual TO. The contractor shall support all MANPRINT domains and prepare, manage and execute the System MANPRINT Management Plan (SMMP). The contractor shall conduct and support users to ensure human input is captured as a part of the design process.

C.4.3.2 Supportability Analyses: The contractor shall perform supportability analyses of specified systems or processes.

C.4.3.2.1 Supportability Influence on Design: The contractor shall perform an analysis of an emerging or existing design to minimize the impact of the design on the systems logistics footprint. The contractor shall formulate supportability characteristics for the design and other specifications for the system. Effective results from this analysis shall include the following:

a) Minimize the use of external Test Measurement and Diagnostic Equipment (TMDE);

b) Maximize the use of Built-In Test (BIT) and Built-In Test Equipment (BITE), subject to the specific governing specifications or standards listed in the TO Request;

c) Maximize forward replacement of components;

d) Consider Operation and Support (O&S) costs, cost savings, and ease of maintenance;

e) Emphasize commonality, modularity, and interchangeability of major components for systems designs, in order to simplify maintenance, logistics, and training burdens; and

f) Examine service alternatives to current designs or systems. Alternatives shall be fully documented and must show improvements in terms of operational availability or life cycle costs over current designs or systems.

C.4.3.2.2 Alternative Support Strategies: The contractor shall examine other IPS, MANPRINT, HSI Program support alternatives. The contractor shall perform analyses of alternatives. Analyses accomplished under this task shall include the following: modernization through spares and O&S cost reductions, tradeoff analysis, cost benefit analysis, life cycle cost projections, and other IPS, MANPRINT, HSI support alternatives. Alternatives selected to support the system(s) shall be documented in Logistics Management Information (LMI) for the system.

C.4.3.2.3 Level of Repair Analysis (LORA): The contractor shall conduct LORA on specified Line Replaceable Units (LRU), ensuring consistent coherent support for the end item IAW MIL-HDBK 502A.

C.4.3.2.3.1 Two Level Maintenance (TLM): The contractor shall support activities necessary for the execution of the DoD TLM efforts. Activities shall require representation at reviews and meetings, preparation, updating and validation of maintenance data and reports, and logistics engineering and products to support equipment as specified in the individual TO. The results shall be documented in LMI. The contractor shall review, analyze, and update data for specified TLM equipment. Efforts shall include, but are not limited to, the following: technical manuals and maintenance procedures, manpower requirements, provisioning, Repair Parts and Special Tools List (RPSTL), Maintenance Allocation Charts (MACs) and Manpower Requirements Criteria (MARC) reports.

C.4.3.2.4 Transportability Assessment: The contractor shall analyze, design, develop, verify, integrate, and test specified systems to ensure capability of meeting transportability requirements. The contractor shall conduct a transportability analysis to ensure that the specified system is transportable by highway, rail, marine, and air modes. The contractor shall analyze, design, develop, verify, integrate, and test specified systems capable of meeting stated transportability requirements. The analysis shall define the procedures and ensure the design is suitable to meet lifting and tie down requirements.

C.4.3.2.5 Facilities Assessment: The contractor shall identify the need for facilities to support the equipment being sustained or developed. When an analysis indicates a need for facilities, either new or increased, the contractor shall inform the Government. The contractor shall provide the results of the assessment to include the design drivers and associated facilities recommendations.

C.4.3.2.5 Business Case Analysis (Performance Based Logistics (PBL)): The contractor shall perform preliminary research supporting development of PBL business case assessments and studies. Research and draft documentation shall be IAW current DoD and Army Regulatory guidance that will be specified in the individual TO.

C.4.3.2.6 Logistics Studies: The contractor shall perform analyses and studies to assess initiatives, readiness, field issues, acquisition logistics or other logistics studies to include the following:

C.4.3.2.6.1 Army Transformation, Velocity Management, Logistics Initiatives: The contractor shall develop technical studies relative to Army Transformation, Velocity Management, and other logistics initiatives.

C.4.3.2.6.2 Condition Based Maintenance (CBM): The contractor shall assess the CBM program and make recommendations for improving and executing it. The contractor shall provide support to the implementation of CBM to include the following:

a) Collecting and analyzing raw data and CBM test data;

b) Interpreting the data and displaying it graphically for Government use;

c) Calculating the return on investment;

d) Identifying opportunities for CBM application; and

e) Identifying technologies to enhance application of CBM.

C.4.3.2.7 Logistics Management Information (LMI): The contractor shall develop, acquire and maintain LMI for specified equipment. The contractor shall deliver LMI data that reflects the optimum logistic support package requirements at the lowest cost of ownership to the Government. The data shall reflect the latest knowledge on the system to include the results of field feedback and testing.

C.4.3.2.7.1 Basis of Issue Plans (BOIP) Feeder Data/Data Interchange: The contractor shall prepare item documentation to include BOIP feeder data, and System Interchange documentation.

C.4.3.2.7.2 Manpower Requirements Criteria (MARC) Program/Manpower Estimate Report (MER): The contractor shall utilize LMI and determine and analyze mission-essential wartime requirements for manpower of specified systems. The contractor shall submit proposed MARC changes and prepare a MER, to be submitted as a report to the Government. The format of the report shall be specified in the individual TO.

C.4.3.2.7.3 Maintenance Allocation Chart (MAC): The contractor shall generate a MAC that shall be an output from LMI following the same order and treatment as a specified systems Technical Manual (TM). The contractor shall also provide a maintenance task list from LMI that serves as the basis for the MAC.

C.4.3.3 Logistic Package Development and Maintenance: The contractor shall plan, manage, develop and maintain the Logistics Support Package reflecting the LMI. The contents and maturity of the package shall be tailored to the needs of key program events to include testing, fielding and training. The package shall be updated from logistics demonstrations and technical manual validations, design changes, and corrections identified by the field.

C.4.3.3.1 Technical Publication Development and Maintenance: The contractor shall plan, prepare, validate, verify and maintain equipment publications, Electronic Technical Manuals (ETM), Interactive Electronic Technical Manuals (IETM) to include RPSTLs and supporting specified equipment, ensuring that they are technically accurate, effective, and reflect the results of supportability analyses reflected in LMI.

C.4.3.3.1.1 Technical Writing and Editing Service: The contractor shall provide technical writing, editing and publications production skills, as specified in the individual TO.

C.4.3.3.1.2 Electronic Publishing Services: The contractor shall manage publications content data and work flow management systems, to include maintaining data security, data cleansing, data migration, and developing Desktop Publishing Instructions.

C.4.3.3.1.3 Extensible Markup Language (XML) Conversion: The contractor shall manage and perform XML implementation and conversion efforts, to include XML workstation coordination, setup and operation, and development of quality assurance procedures and documentation to enable Government review of vendor prepared XML tagged TM and other documents.

C.4.3.3.1.4 Modification Work Order (MWO) Development: The contractor shall plan, manage, develop, validate MWOs and execute associated activities, as specified in the individual TO.

C.4.3.3.1.5 Provisioning: The contractor shall perform tasks such as providing the Government with a complete range of technical data necessary to ensure supply support for specified equipment. System technical data shall reflect the as-built and as supported configurations.

C.4.3.3.2 Test, Measurement and Diagnostic Equipment (TMDE): The contractor shall identify and develop those TMDE support resources to include any augmentation to ensure the ability of the specified equipment to be effectively diagnosed and its maintenance verified. Maintenance concepts shall include the optimum use of accurate on-board or embedded diagnostic and prognostic capability to include BIT and BITE.

C.4.3.3.3 Packaging Development and Maintenance: The contractor shall review and recommend the appropriate performance based and detailed packaging requirements that satisfy the equipment and support items protection and preservation needs. The contractor shall take into account the environment in which the equipment and support items will be stored IAW MIL-STD 2073 and DA PAM 700-32. Tasks shall include the following: preservation, packaging, packing, marking and exercising efforts for specified TACOM LCMC equipment, both secondary and major end items; design, development, fabrication, testing, and documenting of special packaging designs; and providing all packaging LMI data elements for all store, stock, and issue items of supply. The contractor shall manage the Long Life Reusable Container Program, shelf life program, hazardous materiel packaging, National Maintenance Management packaging, and stock readiness program, when specified in the individual TO.

C.4.3.4 Logistic Package Validation and Verification: The contractor shall validate the Systems Support Package, IAW AR 700-127 through static activities to include joint Government and contractor logistics demonstration and TM validation, and capture and document the verification through dynamic efforts to include Government testing and active field usage. The contractor shall analyze the results of the validation and verification activities and update the Systems Support Package to correct errors, issues and shortcomings identified. The contractor shall plan, manage and support hands-on demonstrations to include logistics demonstrations, maintainability demonstrations, and technical manual validations and verifications. The contractor shall evaluate the effectiveness of the Logistics Support Package through evaluation of the SSP utility during testing.

C.4.3.4.1 Materiel Fielding Planning: The contractor shall provide fielding and training services CONUS and OCONUS. The contractor shall provide support data analysis for materiel fielding to be reflected in the systems Materiel Fielding Plan. Support data analysis shall reflect a total package fielding approach with deliveries of the verified Logistic Support Package to include, technical manuals, New Equipment Training (NET), sustainment training, training devices, and all support items. The contractor shall participate in New Materiel Introductory Briefings and reviews in response to the gaining commands Mission Support Plan.

C.4.3.4.2 Total Package Fielding (TPF): The contractor shall manage TPF efforts for assigned systems. Activities shall require representation at reviews and meetings, development of integrated fielding plans, and directing TPF activities.

C.4.3.4.3 Training: The contractor shall provide qualified instructors to conduct NET, sustainment, and institutional training. The contractor shall conduct instructor and key personnel training, and provide re-useable training materials to include software and hardware training for mockup, simulators and development of training aids. Additional tasks shall include coordinating and facilitating training classes for the Government in various other areas related to this contract.

C.4.3.4.3.1 Training Support: The contractor shall provide training support to ensure the War fighter and technical support personnel are provided with instruction, exercises and skills regarding logistical platforms, systems, and war fighting capabilities. Training support shall include the following:

a) Administrative services to include registering students for training, reserving space and facilities for training at sites identified within the TO, maintaining class rosters, maintaining attendance records, and generating training completion certificates;

b) Technical and administrative services for conducting market surveys to identify available training courses or sources for training, relevant to a particular training need identified within the TO; and

c) Technical services for developing and delivering training courses or modules, either in-person or by electronic delivery, to include video training modules or computer-based training. These services may involve the development of training plans or course plans, development of specific training content, development of training aids to include student guides or handbooks, development, assembly, and shipment or set-up of Training Equipment Sets, and the delivery of training at sites which may be either CONUS or OCONUS (including Foreign Military Sales (FMS)) locations.

C.4.3.4.3.2 Training Development and Delivery: The contractor shall develop and deliver training to include the following:

a) Technical services for developing and delivering user and maintainer training in conjunction with the fielding of new hardware or new hardware modifications; and

b) Power Projection Training Programs of Instruction, to include NET to consist of Program of Instructions (POI); the furnishing of Field Service Representative (FSR) trainers for initial operator and maintenance at specified CONUS or OCONUS locations the furnishing of Power Projection Operations Mobile Training Teams.

C.4.3.4.3.3 Fleet Planning: The contractor shall develop and maintain a Fleet Plan for specified systems or family of systems. The contractor shall capture and maintain data and records (e.g. engineering change proposals, material inspection and receiving reports, and maintenance reports) for systems in development, population by configuration, fleet modernization strategy, and fielding schedules and priorities to formulate the Fleet Plan. The contractor shall apply data and records management and database architectural design and implementation with usage of program acquisition management to communicate the Fleet Plan and recommendations for managing the fleet.

C.4.3.4.4 Automatic Identification Technologies (AIT): The contractor shall perform the activities necessary for the successful execution of the AIT program to include the following: Policy and Strategy Creation; Systems Integration; Business Intelligence and Data Mining; development of Unique Identification (UID)/Radio Frequency Identification (RFID) legacy parts-marking strategies; Business Process Re-Engineering; Business Case Analysis and Automated Information Technology studies relating to Item Unique Identification (IUID) or RFID.

C.4.3.4.4.1 Item Unique Identification (IUID): The contractor shall analyze and assess IUID planning for specified system(s). The contractor shall develop plans for IUID applications to specific equipment to include marking techniques and locations. The contractor shall provide a plan for durable tagging of assets that meets the requirements of MIL-STD 130, and then implement the plan to input the IUID data into a register for asset accountability. Any item with a warranty must have a useable tag through the warranty period.

C.4.3.4.4.2 Radio Frequency Identification (RFID): The contractor shall analyze and assess planned use of RFIDs. The contractor shall develop draft policies, plans and guidelines for RFID applications. The contractor shall apply the draft policies, plans and guidelines to specific equipment to include marking techniques and locations, data capture, loading and utilization.

C.4.3.5 Field Support:

C.4.3.5.1 Product Support Integrator (PSI): The contractor shall serve as the Product Support Integrator and shall provide a theater based Business Case Analysis (BCA) for optimal least cost assimilating support elements, to include addressing the selection of appropriate Product Support Providers (PSPs). When selecting appropriate PSPs, the contractor shall use small business entities to achieve supply chain efficiencies and minimize civilian contractors on the battlefield, to the maximum extent practicable. The contractor shall ensure that the PSP provides the parts supply management and application of support packages to enable world class end item maintenance. The contractor shall follow the Performance Based Agreement and adhere to the applicable PBL criteria, specified in the individual TO, to support contractor maintenance, repair, rebuild, and overhaul, to include the following: operational availability, operational reliability, cost per unit usage, logistics footprint and logistic response time.

C.4.3.5.1.1 PSI Performance Measurements: The contractor shall ensure that the PBL metrics identified in the Performance Based Agreement supports the desired readiness and availability outcomes. The contractor shall establish requirements and controls to ensure the PSP achieves the performance measures tailored by each field commanders identified unique circumstances.

C.4.3.5.1.2 PSI Deployment: The contractor, functioning as the PSI, or their PSP, sub-contractor elements shall be required to deploy to appropriate CONUS and OCONUS locations to provide sustainment, to include maintenance, material and supply chain management and transportation, for supported items in a given theater.

C.4.3.5.2 Area of Responsibility (AOR) Operations and Logistics Readiness: The contractor shall provide field support services, to be fully defined in the individual TO, in the AOR. The contractor personnel shall be required to deploy in support of combat, field exercise, training event, media event or other action in a CONUS or OCONUS location.

C.4.3.5.3 Liaison Officer (LNO) (CONUS or OCONUS): The contractor shall perform the following:

a) Observe and report on activity to the COR, when specified to do so in the individual TO. The contractor shall communicate with the customer for the specified systems to include the following: attend meetings, prepare and present logistics status briefings, and identify and resolve programmatic and logistics issues that impact system availability and readiness, when specified in the individual TO; and

b) Furnish LNO services that provide integration of the specified systems into military units. This work may require the contractor to perform tasks, to include developing and managing a database to track the movement of equipment modifications and safety enhancements from vendor, contractor, and depot locations to AOR installations, maintain contact with the Forward Repair Activity (FRA) and report problematic issues with Equipment Readiness. The LNO may be required to observe and report activity with specified systems to the COR, and ensure that total package fielding, RESET and installation of armor and safety enhancements are synchronized and accomplished, if specified in the individual TO.

C.4.3.5.4 Contractor Logistics Support/PBL: The contractor shall perform logistic support functions in support of a weapon system, end item, family of systems, component(s), facilities, and/or operations at an industrial or tactical installation. The contractor shall manage and execute these logistic support efforts to achieve the designated performance metrics specified.

C.4.3.5.4.1 Contractor Maintenance Teams (CMT): The contractor shall establish, operate, support and maintain CMTs that will directly support the maintenance mission of the maintenance team. CMTs shall perform the following: operator and unit level maintenance to TM 10/20 standards, commercial repair standards, preset, reset and national level maintenance for selected units at DoD installations or temporary locations, for specified systems or components.

C.4.3.5.4.2 Contractor Supply Support: The contractor shall perform the following:

a) The contractor shall provide materials, supplies and logistical support to develop, pack, ship, and store repair parts and kits to use in component repair and unit organic or other Government maintenance programs in the accomplishment of Unit Level through National Level maintenance, modification or rebuild;

b) Evaluate the need for fabricating, shipping, assembling or disassembling items, and subsequent fielding;

c) Receive, classify, store and distribute repair parts, components and other items of supply; and

d) Prepare and provide a SSP, IAW DA PAM 73-1, Section 6-57 and prepare and provide an SSPCL. The list shall include all required components for testing services and shall identify existing tools and test equipment used to perform testing services to include Government tools and test equipment, as specified in the individual TO. The SSP shall consist of all items on the SSPCL. The SSP requirements include repair parts, technical manuals, BIIs, common and special tools, and test equipment. The contractor shall assemble and ship the SSP to the specified test site, within the time specified in the task order, to include, packing, packaging, and transportation. The contractor shall track the consumption of components and maintain control of the SSP.

C.4.3.5.5 Transportation of Assets (CONUS or OCONUS): The contractor shall perform the following:

a) Coordinate transportation of Government assets to ensure they arrive safely IAW the specified Government schedule;

b) Coordinate transportation and supply support to permit rapid deployment and management of supplies and equipment;

c) Provide logistics support planning, inventory and property planning, storage and accountability , and coordinate movement;

d) Provide technical advice, assistance, guidance or operational support to identify and utilize existing regional or global modes of transportation resources, identify alternative capabilities and plan for effective integration of public and private sector support or resources, operation and maintenance of the infrastructures that support these activities. Services may include the operation of a vendor-managed inventory system, the operation of private or Government-owned warehouses, stockrooms, or other storage facilities, shipping and receiving, staging and storage, packing and crating and design, re-engineering, operation and maintenance of distribution and material handling equipment systems. This work may involve tasks related to the following: Standard Army Management Information Systems (STAMIS); supply and operating transformation, performance and command readiness; Distribution Management Stock Readiness; Configured Loads; Integrated Logistics Aerial Re-supply, future transformational logistics, packaging and operations; Stock Readiness (SR); Contract Logistics (CL); Integrated Logistic Aerial Re-Supply (ILAR); Vendor Initiated Parts Re-supply (VIPR) transitions, deployment packages, material and property requirements planning, movement, storage and accountability systems; logistics strategic planning services; Supply and Value Chain Management Services; Distribution and Transportation Logistics Services; asset management and visibility; Unit Level Logistics Systems; Support of the Standard Army Retail Supply Systems; Major Army Command (MACOM) Defense Reutilization and Marketing Service (DRMS) recovery program; and transportation motor pool operation support;

e) Test drive and operate military vehicles and heavy equipment; and

f) Drive, relocate and provide movement of vehicles from one work center, work shop area or production operation to another.

C.4.3.5.6 Equipment Modifications: The contractor shall manage specified equipment modifications and execute associated activities to include In-Progress Review (IPR); conduct New Material Introduction Briefs (NMIB); kit development, installation procedures, publication updates, and specific TMDE; kit procurement, kit storage, kit distribution; scheduling and shipment site coordination; kit application; MWO application management and tracking in multi-functional data; provide application team resources; train application teams; schedule and deploy application and inspection teams; track and report applications into the Modification Management Information System (MMIS); and provide individual and key personnel maintenance training to equipment user and maintainers.

C.4.3.5.6.1 Army Watercraft Systems Requirements: The contractor shall perform work for the PM Army Watercraft Systems for Service Life Extension Programs (SLEP). contractors shall support the following tasks, when specified in the individual TO: naval architecture and marine application; load line, ballast, and seaworthiness; welding and pipe fitting in a marine and watercraft environment; and perform Watercraft tasks IAW the following: American Bureau of Shipping (ABS) standards; CFR; Watercraft Safety Regulations; United States Coast Guard (USCG) standards; SOLAS requirements; and international discharge standards as defined by the Alaska protocol.

C.4.3.6 System Readiness: The contractor shall perform program management and operational support services focused on system readiness, to include analyzing, developing, automating and submitting operational plans for approval by the Government. The contractor shall implement procedures and provide program coordination in order to interface, monitor, research, administer, recommend business rules, document support, provide support analysis, formulate logistics topics, initiatives and strategic plans and technical operational and manpower support. The program management and operational support services shall include the following: logistical support and analysis to Resource Management (RM) and budget execution logistical support; operating contractor maintenance facilities at military installations; MACOM and Army Transformation Campaign Plan (TCP); attendance and participation at Maintenance Summits; development of logistics reengineering advertisement, educational, and presentational materials; Items Managed List (IML); Army Campaign Plan (ACP); logistics doctrine and structure; Strategic Readiness System (SRS); Army Balanced Score Card (BSC); Data Based Commitment Accounting System (DCAS); fiscal management; management and funds tracking procedures; Equipment Readiness Posture; Readiness Integrated Database (RIDB); inspection of unit logistical procedures, operational logistical libraries, STAMIS, MACOM Logistics Systems, and DS-RX Programs; Corps/Theater Automated Data Processing Service; CTASC-II; Standard Army Retail Supply System (SARSS); Standard Property Book System Redesign (SPBS-R); Property Book Unit Supply System Enhanced (PBUSE); Logistical Total Army Authorization Document System (LOGTAADS); Requisition Validation (REQVAL); Organizational Clothing and Individual Equipment (OCIE); Command Asset Visibility Equipment Redistribution System (CAVERS) or similar system; Distribution Execution System (DES); Modified Table of Equipment (MTOE); MACOM Readiness Distribution Program (RDP); logistical support planning; logistic business process reengineering and functional process improvement support; Army Watercraft Inspection Reporting System (WIRS); Army Watercraft Inspection Branch (WIB); Corrosion Prevention and Control (CPAC); deployment logistics support, deployment asset visibility, ashore and afloat brigade inspection readiness; Army maintenance management; acquisition logistics; global pre-positioned stocks software database; program/project management support; logistical redesign and restructuring; local or remote conferences and video-teleconferences; transformation, transportation, field services, maintenance, and medical supply operations.

C.4.3.6.1 Sustainment Issues - Technical Resolution: The contractor shall analyze systems and develop technical solutions to sustainment issues, to include trade-off-studies; effectiveness analyses; risk management; configuration management, interface management, and data management; performance measurements; technical review; requirements analysis, engineering analysis of hardware and software configuration, and functional analysis; transforming architecture (functional to physical); defining alternative system concepts; configuration items and system elements; selecting preferred product and process solutions; and defining or refining physical interfaces. The contractor shall develop, review, and provide deficiency reports, deviation from specifications, and ECPs based upon analysis of field issues.

C.4.3.6.2 Obsolescence Management and Technical Data Services: The contractor shall provide services necessary for the successful execution of an Obsolescence Management Plan by providing solutions to extend product life cycles of Government specified systems and products. Tasks shall include reverse engineering, technical services, and acquisition engineering. The contractor shall comply with survivability, mobility, lethality, standardization, and Chemical, Biological, Radiological and Nuclear protection and detection, contamination, survivability, and life support requirements.

C.4.3.6.3 Diminishing Manufacturing Sources and Material Shortages (DMSMS) Case Management: The contractor shall research and analyze DMSMS case files and DMSMS data in order to provide recommendations to the DMSMS Management Team, to include storage of data and accuracy of stages throughout the DMSMS process, as specified in the individual TO. The contractor shall query OEMs and manufacturers for current technical information supporting the DMSMS process. The contractor shall make recommendations and updates to the existing DMSMS Plan. The contractor shall use the information and systems as specified in the individual TOs when performing this work to include the following: DMSMS Plans, ECPs, Reliability Centered Maintenance (RCM), FRACAS, predictive modeling outputs, Readiness Assessment outputs, Federal Logistics (FEDLOG) data, Bills of Material, vendor service bulletins, Defense Logistics Agency (DLA) Engineering Assistance requests DLA Form 339 (Request for Engineering Support), Requests for deviations, and CBM output.

C.4.3.7 Command Wide Logistics Enterprise System Support: The contractor shall support the design, development, deployment, training and maintenance of enterprise logistics management systems used by, or developed to support, fixed base logistics operations. Tasks shall include the following:

a) Fielding and deployment of enterprise systems, to include, Global Combat Support System Army (GCSS-A), General Fund Enterprise Business System (GFEBS) and Logistic Management Program (LMP) increments to include migration of legacy data;

b) Establishment of network connectivity for remote locations at Government and off-installation sites;

c) Installation and Initial Operational Capability (IOC) of computer hardware and communications equipment;

d)…