This document is a Performance Work Statement (PWS) for the repair of F-16 Radar Absorption Panels under the Air Force Repair Enhancement Program (AFREP). The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and return the radar absorption panels to a serviceable condition. The part numbers and stock numbers of the panels that require repair are specified. The contractor shall remove the defective foam, replace it with compliant material, prepare and paint the panels, and remark the part numbers. The repaired panels shall be returned to the customer within 30 days of receipt. The government shall be provided information on any commercial warranties. The contractor must maintain a quality assurance program and comply with safety standards. A copy of the repair and inspection record shall be provided to the 162nd Wing AFREP office.
The related federal contract opportunity is a Request for Quote (RFQ) for the Radar Foam Repair service, solicitation number W50S6S24Q0021. It is an unrestricted acquisition with a NAICS code of 336413 and 1,250 employee size standard. Offerors must submit a quote, completed representations and certifications, an AFREP source approval memo, and vendor information. The quote is due by a specified date and time. Any questions must be emailed by June 10, 2024, with responses posted by June 12, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A- Radar Foam Repair.docx | DOCX document | |
| W50S6S24Q0021 - RFQ Radar Foam Repair.docx | DOCX document | |
| Attachment 2 - CERT of 52.204-24 25 26 (REV).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
RADAR FOAM REPAIR
SPECIFICATIONS FOR REPAIR OF AIRCRAFT PARTS for the AIR FORCE REPAIR ENHANCEMENT PROGRAM (AFREP)
1. SCOPE
Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, to perform services required to repair and return F-16 Radar Absorption Panels to a serviceable condition, as defined in this PWS.
1.1 Background
Radar Absorption Panels installed on the F-16 Radar system are intended to provide protection for the radar system’s microelectronics and to improve the target detection sensitivity (capability) of the radar system. The radar absorption panels are of differing sizes and shapes strategically placed around the front of the radar processor package. Over time, the foam absorption material dries out losing its elasticity which results in cracks forming in the material and/or pieces of the foam becoming dislodged from the panels. In either case, the net result is degradation in the radar system protection characteristics which the absorption panels are intended to provide. The part numbers and stock numbers of the panels are identified below.
2.0 APPLICABLE DOCUMENTS
The following documents form a part of this PWS to the extent specified herein. In the event of a conflict between these documents and the contents of this PWS, the contents of the drawing shall take precedence.
0. Other Government Documents
| T.O. 1F-16C 3-3 53-21-01 | Structural Repair |
| T.O. 00-25-234 | General Shop Practice Requirements for the Repair, Maintenance, and Test of Electrical Equipment |
| Applicable drawings | 16B1741, Cover, Bulkhead Upper Assy | |
| 16B1742, Cover Bulkhead Lower Assy | ||
| 16B1743, Cover, Electrical Harness Assy | ||
| 16B1744, Cover, Antenna Base, Upper Assy | ||
| 16B1745, Cover Antenna Base, Upper Assy | ||
| 16B1746, Cover Antenna Base, Lower Assy | ||
| 16B1726, Cover, Radome | ||
| 16B1727, Cover, Radome | ||
| 16B1728, Cover, Radome |
3.0 REQUIREMENTS
0. General Requirements
0. The part numbers and stock numbers of the radar absorption panels that are subject to repair under the scope of this statement of work are as follows:
0. Upon receipt of the unserviceable/damaged radar absorption panels, the contractor shall take those actions necessary to ascertain the condition of each panel and to remove the defective foam from each panel.
0. Repair of each panel shall be accomplished by replacing the absorption foam with a material compliant with the requirements of the applicable drawing and by using the adhesives specified within the drawing. Note: The contour of the replacement absorption material shall be carefully controlled to ensure the panel will not be an obstruction to the radar antenna when reinstalled on the aircraft.
0. The contractor shall then prepare and paint each panel with the paint specified within the drawing.
0. The part number for each panel shall be remarked on each panel as specified within the drawing package.
0. The repaired panels shall be prepared for return to the customer using best commercial practices and shall be shipped by commercial transportation to the attention of MSgt Michael Whitt, 162 MXG/MXQ, Morris ANG Base, at 6620 S. Air Guard Way, Tucson, AZ 85706.
0. Facility Requirements
Facility environmental controls shall meet commercial industry standards for the work being performed.
3.3 Warranties
The government shall be provided the information pertaining to any commercial warranty that has been extended to the contractor during the course of work under this contract. No other specific warranty shall be offered for the repairs effected to each radar absorption panel other than to correct discrepancies identified as a result of workmanship errors.
3.4 Quality Assurance
The contractor shall maintain a quality assurance inspection program that ensures conformance to contractual requirements and meets the requirements of ISO 9001-2013 or an equivalent quality system model.
3.5 Safety System
The contractor shall conduct a system safety program and comply with Federal Occupational Safety and Health (OSHA) Standard, 1910 and/or other nationally recognized sources of safety, health, and fire prevention standards. Using good safety engineering principles, the contractor shall analyze and evaluate safety factors in the repair of the Radar Absorption Panels.
3.6 Period and Location of Performance
All work shall be accomplished at the contracted entity’s facility and shall be completed within thirty (30) days of receipt of the defective panels.
4.0 Contractor Personnel
4.1 A copy of the repair and inspection record shall be provided to the 162nd Wing AFREP office via e-mail to michael.whitt.1@us.af.mil and richard.moore.12@us.af.mil
5. Service Delivery Summary Contract Objective: To provide radar foam Repair service to the 162nd Wing Maintenance Group (MXG). The vendor repairs radar foam and returns them to the 162nd Wing in like-new condition.
| Deliverable |
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method Used / Frequency |
| Contractor shall furnish the repaired product to the Air Force as the Original Equipment Manufacturer (OEM) intended. |
| Para. 3.1.1. of PWS |
| Must maintain 100% compliance |
| Spot Checks/ |
Completion of Service
A record of the repair and test results to be e-mailed to 162nd Wing AFREP Manager: michael.whitt.1@us.af.mil and richard.moore.12@us.af.mil
Para. 4.1. of PWS
Must maintain 100% compliance Spot Checks/ Completion of Service