Attachment 1 PWS GRD.SRD Materials Helicopter Transport.pdf
PDF 172 KB Posted
- Solicitation number
- 1240BF25Q0011
- Issued by
-
Department of Agriculture Forest Service
About this file
This Performance Work Statement (PWS) details a non-personal services contract for material transportation services within the Glacier & Seward Ranger District of Chugach National Forest. The contract will provide transportation of materials and supplies between staging areas and designated work sites, with a primary service period from May through October, though work may occur year-round. The government will award a Firm-Fixed Price (FFP) contract with one base period and four 12-month optional periods, spanning from the date of award through September 14, 2030.
Key requirements include the contractor furnishing all labor, equipment, and transportation necessary to move materials such as dimensional lumber, hand tools, chainsaws, and potentially hazardous materials. Typical slingload weights will average 500-600 pounds. The Contracting Officer's Representative (COR) will coordinate specific delivery dates and locations, with the government delivering supplies to staging locations and the contractor responsible for loading. Performance standards require 95% service compliance, with invoicing to be completed within 30 days of service and fuel charges to be reimbursed at direct cost without profit. The contract will be administered through task orders issued against the base agreement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Glacier & Seward Ranger District Material Transport Performance Work Statement (PWS) Page 1 of 6
General Information
1.0 General
This is a non-personal services contract to provide transportation of materials and supplies between staging areas and designated work sites within Glacier & Seward Ranger District, Chugach National Forest. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
2.0 Background and Purpose
Transportation of materials and supplies to and/or from remote work sites on the Glacier & Seward Ranger District, Chugach National Forest. See Appendices for a general overview of the area.
3.0 Description of Services
The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide transportation of materials and supplies between staging areas and designated work sites within Glacier & Seward Ranger District, Chugach National Forest. The Contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.
4.0 Place Performance The work shall be performed at various locations throughout the Glacier & Seward Ranger District.
5.0 Period of Performance The ordering periods of performance shall be for 1 Base Period and 4 Optional Ordering Periods of 12-months each.
Period POP Start Date POP End Date Base Period Date Of Award 14 September 2026 Option Period 1 (12-Month Option Period) 15 September 2026 14 September 2027 Option Period 2 (12-Month Option Period) 15 September 2027 14 September 2028 Option Period 3 (12-Month Option Period) 15 September 2028 14 September 2029 Option Period 4 (12-Month Option Period) 15 September 2029 14 September 2030
6.0 Contract Type
The Government will award a Firm-Fixed Priced (FFP), Requirements, Service Contract with up to a 5-Year Ordering Period. Performance shall be made only as authorized by Task Orders issued IAW the Ordering Clause. Subject to any limitations in the Order Limitations Clause or elsewhere in this contract, the Contractor shall furnish to the Government all services specified in the Schedule of Items and called for by orders issued IAW the Ordering Clause.
Note: Task Orders will be issued at the rates specified in the Schedule of Items. The quantities of services specified in the Schedule of Items are estimates only.
7.0 Government Regular Working Hours
The Government's regular working hours are Monday through Friday from 0700 to 1700, except federal holidays or when the government installation is closed due to local or national emergencies, administrative closings, or similar government directed closings.
8.0 Federal Observed Holidays
When a federal holiday occurs on a Saturday, federal employees are normally granted the previous Friday as the holiday observance. When a federal holiday occurs on a Sunday, federal employees are normally granted the following Monday as the holiday observance. Below is the list of recognized federal holidays:
Federal Holidays New Year’s Day (January) Labor Day (September)
Performance Work Statement (PWS) Page 2 of 6
Martin Luther King Jr’s Birthday (January) Columbus Day (October) President’s Day (February) Veteran’s Day (November) Memorial Day (May) Thanksgiving Day (November) Juneteenth Day (June) Christmas Day (December) Independence Day (July)
9.0 Contractor Key Personnel
Contract Manager: The Contractor shall provide a Contract Manager and designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. The Contract Manager or alternate shall be available during the Government's regular working hours.
Quality Control Representative: The Contractor shall provide a Quality Control Representative who shall be responsible for the Contractor’s Quality Control Plan (QCP) to ensure services are performed IAW the PWS.
The Quality Control Representative shall implement and maintain full compliance of the QCP throughout the contract period.
10.0 Government Key Personnel
Contracting Officer (CO): The CO is the only person with the authority to: enter into, administer, and or terminate contracts; make related determinations and findings on behalf of the government; and legally bind the government. The CO shall ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO shall determine and document the final assessment of the contractor's performance in the government’s past performance tracking system.
Contracting Officer’s Representative (COR): A COR may be assigned to this contract to monitor all technical aspects and assist in contract administration. The COR may be authorized to perform the following functions:
assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communication with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements (without increasing or decreasing contract scope), including Government drawings designs, and specifications; monitor Contractor's performance and notify both the CO and Contractor of deficiencies; and provide site entry of Contractor personnel. The COR is not authorized to change any of the terms and conditions of the contract or any resulting task order.
Security and Safety Requirements
11.0 Conduct of Contractor Personnel
The CO may require the contractor to remove from the work site any employee working under this contract for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor employee shall be subject to dismissal from the premises upon determination by the CO that such action is in the best interests of the government. Such removal from the work site or dismissal from the premises shall not relieve the contractor of the requirement to provide sufficient personnel to perform the services as required by this PWS.
12.0 Safety
Contractor activities shall be conducted in a safe manner that minimizes accidents as well as any impacts on Government operations and members of the public. Contractor shall comply with applicable federal, state, and local codes and standards, including safety and occupational health requirements, as well as any additional specific requirement contained in this PWS.
Performance Work Statement (PWS) Page 3 of 6
Technical Requirements
13.0 Specific Tasks
The primary need for services is May through October, but work may occur at any time of the year. Amount of work will depend upon Government needs and will be communicated on a case-by-case basis as needs arise.
Coordination: The COR will coordinate with the Contractor with the need and time of material transport after a task order is funded. Only the COR or the CO can schedule trips for material transport. The COR will coordinate possible dates with the Contractor as soon as needs are known.
Loading: The Government will deliver the supplies to the staging location for loading. All loading is the responsibility of the Contractor and Government employees will not have any involvement with loading or unloading. See Appendices for general approximation of staging locations and delivery locations, this is for general information purposes to illustrate the general range of deliveries. Actual staging locations and delivery locations will be determined and coordinated in response to actual needs. The COR will have someone onsite at delivery location to confirm receipt of delivery.
Typical Load: Common materials requiring transport may include dimensional lumber (2”x12”x10’), hand tools, chainsaws and equipment. Gasoline, pressurized fuel canisters, and other hazardous materials may be transported with advance communication. Approximate weight, and dimensions, and location of each load will be communicated prior to work. Slingloads will typically average 500-600 pounds.
TASK 1 Haul and Backhaul Material: The Contractor shall provide transport of materials and supplies to and/or from staging areas to designated work sites as identified and coordinated with COR.
1. Confirm actual date for delivery, items to be transported, and pickup & drop off locations with COR.
2. The COR or a Government representative will be on-site for confirmation of delivery.
3. Damages to air cargo may be held liable against the Contractor IAW 52.247-21 and 52.247-22.
4. The Contractor will do their best to reschedule in the event of a weather delay.
TASK 2 Fuel Charges: Coordinate with the COR prior to invoicing in IPP. The Government will reimburse the Contractor for the actual cost of fuel used in performance of Task 1 without profit.
1. The Government intends to use: https://www.airnav.com/fuel/local.html to verify pass through fuel surcharges and monitor aviation fuel pricing.
2. The Contractor shall inform the COR when the fuel rates change.
Deliverables Schedule
14.0 Key Deliverables
The Contractor shall submit an electronic copy of all deliverables to the CO and COR in PDF format and phrased in layperson language. Below is a list of all deliverables outlining each objective and due date.
Item # Deliverable Objective Due 1 Invoices Invoices shall be submitted via www.IPP.gov.
Within 30 days of performance.
2 Fuel Charge To fairly and equitably reimburse the contractor for the cost of fuel.
With invoice.
https://www.airnav.com/fuel/local.html http://www.ipp.gov/
Performance Work Statement (PWS) Page 4 of 6
Performance Requirements Measures
15.0 Acceptable Performance
Acceptable performance is achieved if 95% of the requirement is successfully satisfied. The Contractor’s acceptable performance will be rated in COR reports and in the Contractor Performance Assessment Reporting System (CPARS) as Satisfactory, Very Good, or Exceptional.
16.0 Unacceptable Performance
Unacceptable performance is achieved if less than 95% of the requirement is satisfied (e.g., work specified by contract is incomplete or work is not IAW the PWS, task order, and manufacturer’s specifications). If the performance is deemed unacceptable for any objective (required task), the COR will determine the possible cause of this unacceptable performance. Unacceptable performance caused by actions of the Contractor shall be reported to the Contractor’s on-site representative and request its signature on documentation acknowledging notification. Unacceptable performance caused by actions of the Government shall not be held against the Contractor. If the Contractor disputes the results of surveillance, the COR must refer the Contractor to the CO for resolution. The Contractor’s unacceptable performance will be rated in COR reports and in CPARS as Marginal or Unsatisfactory.
17.0 Performance Requirements Summary
Item
Performance Objective
Performance Standard
Performance Threshold
Surveillance Method
Remedy
1 Task 1 – Haul and Backhaul Material
Work shall be performed IAW this
PWS.
No variances allowed. 95% services performed as required by the contract.
COR or Government Technical Representative (GTM) present for delivery.
Rework at no cost to Government for defective services. Full invoice payment upon successful completion and acceptance.
2 Task 2 – Fuel Charge
Work shall be performed IAW this
PWS.
Fuel Charge submitted in invoice, including date, location of fuel purchased, and direct cost of fuel consumed in support of Task 1.
Prior to invoicing.
Resubmit invoice if invoice does not contain the amount of information required for government to determine fuel charge pricing or if other than direct costs are included in invoice.
Definitions
18.0 Definitions
Acceptance: The act of an authorized representative of the Government by which the Government, for itself or as agent of another, assumes ownership of existing identified supplies tendered or approves specific services rendered as partial or complete performance of the contract.
Business Day: Refers to any day in which government normal business operations are conducted. For this contract, a business day will be IAW PWS Paragraph 6.0, Government Regular Working Hours.
Calendar Day: Refers to the period of elapse time, using Coordinated Universal Time or local time that begins at midnight and ends 24 hours later at the next midnight.
Contracting Officer (CO): A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Performance Work Statement (PWS) Page 5 of 6
"Administrative Contracting Officer (ACO)" refers to a Contracting Officer who is administering contracts.
"Termination Contracting Officer (TCO)" refers to a Contracting Officer who is settling terminated contracts. A single Contracting Officer may be responsible for duties in any or all of these areas.
Contracting Officer’s Representative (COR): An individual, including a Contracting Officer’s Technical Representative (COTR), designated, and authorized in writing by the Contracting Officer to perform specific technical or administrative functions.
Contractor: A supplier or service provider that enters into a contract with the Government to provide specific supplies or services to the Government. The term in this contract refers to the prime.
Day: Unless otherwise specified, it means a calendar day.
Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Equipment: A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
Facility: An establishment, structure, or assembly of equipment designated for a specific function; something designed, built, installed, etc., to serve a specific function affording a convenience or service.
Government-Furnished Property (GFP): Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification.
Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Government Property: All property owned or leased by the Government. Government property includes both government-furnished property and contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Inspection: Examining and testing supplies or services (including, when appropriate, raw materials, components, and intermediates assemblies) to determine whether they conform to contract requirements.
Invoice: A contractor’s bill or written request for payment under the contract for supplies delivered or services performed.
Line Item: the basic structural element in a procurement instrument that describes and organizes the required product or service for pricing, delivery, inspection, acceptance, invoicing, and payment. The use of the term "line item" includes "subline item," as applicable.
Line Item Number: Either a numeric or alphanumeric format to identify a line item.
Non-Personal Services Contract: A contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are
Performance Work Statement (PWS) Page 6 of 6 authorized by the Government IAW FAR 37.012, under general contracting authority, and do not require specific statutory authorization.
Option: Unilateral right in a contract by which, for a specified time, the Government may elect to purchase additional supplies or services called for by the contract or may elect to extend the term of the contract.
Performance Objectives: Describe the work that is to take place.
Performance Requirements Summary (PRS): Identifies the key performance indicators of the contract that will be evaluated by the Government to ensure the Contractor meets standards.
Performance Standard: Describe the desired results that are to be achieved. A measure of comparison; an acceptability criterion; a benchmark or yardstick against which a service will be measured.
Quality Assurance (QA): Refers to the various functions, including inspection, performed by the Government to determine whether a contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP): An organized written document used by the Government for quality assurance surveillance. A plan describing how the government will survey, observe, test, sample, evaluate and document the contractor’s performance in meeting critical performance standards identified in the contract.
Quality Control (QC): Refers to the various functions performed by the contractor to control and improve the quality of goods and services provided.
Quality Control Plan (QCP): An organized written document used by the Contractor for quality control. A contractor’s internal quality assurance procedures for measuring, tracking, reporting, and analyzing contract performance. A contractor’s QCP is separate from the government’s QASP.
Random Sampling: A method of looking at a few individual items in a lot to determine the quality of that lot against a standard.
Service Contract: A contract that directly engages the time and effort of a contractor whose primary purpose is to perform an identifiable task rather than to furnish an end item of supply.
Serviceable Condition: Refers to items that are usable; ready for use; in proper operating condition; durable;
clean and in good condition; usable for its intended purpose.
Sub-Contractor: One that enters into a contract with a prime Contractor. The Government does not have privy of contract with the sub-contractor.
Task Order: An order for services placed against an established contract or with Government sources.
19.0 Appendices
Appendix 1 – Glacier Ranger District Map Appendix 2 – Seward Ranger District Map
| General Information |
| 1.0 General |
| 2.0 Background and Purpose |
| 3.0 Description of Services |
| 4.0 Place Performance The work shall be performed at various locations throughout the Glacier & Seward Ranger District. |
| 5.0 Period of Performance The ordering periods of performance shall be for 1 Base Period and 4 Optional Ordering Periods of 12-months each. |
| 6.0 Contract Type |
| 7.0 Government Regular Working Hours |
| 8.0 Federal Observed Holidays |
| 9.0 Contractor Key Personnel |
| 10.0 Government Key Personnel |
| Security and Safety Requirements |
| Technical Requirements |
| 13.0 Specific Tasks |
| Typical Load: Common materials requiring transport may include dimensional lumber (2”x12”x10’), hand tools, chainsaws and equipment. Gasoline, pressurized fuel canisters, and other hazardous materials may be transported with advance communication. App... |
| 1. Confirm actual date for delivery, items to be transported, and pickup & drop off locations with COR. |
| 2. The COR or a Government representative will be on-site for confirmation of delivery. |
| 3. Damages to air cargo may be held liable against the Contractor IAW 52.247-21 and 52.247-22. |
| TASK 2 Fuel Charges: Coordinate with the COR prior to invoicing in IPP. The Government will reimburse the Contractor for the actual cost of fuel used in performance of Task 1 without profit. |
| 1. The Government intends to use: https://www.airnav.com/fuel/local.html to verify pass through fuel surcharges and monitor aviation fuel pricing. |
| Deliverables Schedule |
| Performance Requirements Measures |
| Definitions |
| 18.0 Definitions |
19.0 Appendices