Attachment 1 - PWS Fuel FY25 ULDF 25-0601.pdf
PDF 355 KB Posted
- Attached to
- Propane and Diesel Fuel Federal contract opportunity
- Solicitation number
- FA875125Q0004
About this file
This document is a Performance Work Statement (PWS) for the supply of diesel fuel and propane at the Rome Research Site (RRS) and related facilities in New York. The key details are:
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to deliver diesel fuel and propane to government-owned storage tanks at the RRS facilities. Fuel deliveries must be made between 0700-1600 hours Monday-Friday, excluding federal holidays. The contractor is required to respond to delivery requests within 72 hours and complete deliveries within that timeframe. The PWS includes details on fuel products, storage tanks, unloading procedures, spill response, environmental requirements, security procedures, safety, personnel, and other general information. The PWS also includes several appendices with additional forms and reporting requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Offeror Representations and Certifications--Commercial Products and Commercial Services (Oct).docx | DOCX document | |
| Combined Synopsis Solicitation - 25Q0004.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
DIESEL FUEL /PROPANE SUPPLY
AT
ROME RESEARCH SITE (RRS) FACILITIES
ROME, NY
ULDF#: 25-0601
U
DATED: 23 July 2024 U i
TABLE OF CONTENTS
1. OBJECTIVE ______________________________________________________________ 1
1.1. DESCRIPTION OF SERVICES _____________________________________________________ 1
1.2. SCHEDULE OF FUEL PRODUCTS __________________________________________________ 1
1.3. SCHEDULE OF TANKS TO BE SERVICED ____________________________________________ 1
1.4. UNLOADING PROCEDURES _____________________________________________________ 2
1.5. SPILLS ______________________________________________________________________ 3
1.6. SUPPLIES ____________________________________________________________________ 3
2. GENERAL INFORMATION __________________________________________________ 3
2.1. DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT OR VEGETATION_________________ 3
2.2. ENVIRONMENTAL REQUIREMENTS _______________________________________________ 3
2.3. PERMITS, LICENSES AND CERTIFICATIONS (RESERVED) _______________________________ 4
2.4. HOURS OF OPERATION ________________________________________________________ 4
2.5. RECOGNIZED HOLIDAYS ________________________________________________________ 4
2.6. SITE CLOSURES _______________________________________________________________ 5
2.7. SECURITY ___________________________________________________________________ 5
2.8. TRAFFIC LAWS _______________________________________________________________ 7
2.9. WEAPONS, FIREARMS, AND AMMUNITION ________________________________________ 7
2.10. PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY _______________ 7
2.11. GOVERNMENT INTERFACE ____________________________________________________ 7
2.12. SAFETY ___________________________________________________________________ 7
2.13. EQUIPMENT OPERATORS _____________________________________________________ 8
2.14. WORKMANSHIP ____________________________________________________________ 8
2.15. TOOLS ____________________________________________________________________ 8
2.16. CONTRACT MANAGER _______________________________________________________ 8
2.17. PERSONNEL ________________________________________________________________ 8
3. LIST OF APPENDICES ______________________________________________________ 8
APPENDIX A - FEDERAL STOCK CLASSES REQUIRING CONTRACTOR REPORTING ___________ 9
APPENDIX B – PRODUCT REQUEST FORM _________________________________________ 10
APPENDIX C – PRODUCT USAGE FORM ___________________________________________ 11
PERFORMANCE WORK STATEMENT
1. OBJECTIVE
The objective of this requirement is to provide all management, tools, supplies, equipment, and labor necessary to ensure that fuel is delivered to Government owned fuel storage tanks at Rome Research Site Facilities in a manner that will maintain a satisfactory and safe environment.
1.1. DESCRIPTION OF SERVICES
The contractor shall provide auto fill fueling for all propane heating tanks in the middle and end of each month during the winter heating season (October- April). Fuel deliveries will be performed between the hours of 0700 and 1600, on Mon-Fri, excluding Government holidays. The contractor is responsible to notify the designated point of contact to gain access to the site. Upon completion of the delivery the contractor will obtain the signature of the designated point of contact on the delivery ticket. A copy of each delivery ticket will be left at the site. The ticket will include the following information: type of fuel delivered, quantity of fuel delivered, tank identification and facility number(s), date and time of delivery, and name of the contractor delivering the fuel.
The contractor is required to respond to requests for fuel delivery within 72 hours of receipt. The contractor shall complete the delivery within this timeframe. A list of persons authorized to request fuel deliveries will be provided by the Contracting Officer. This list will be updated as necessary. Contractor shall provide and ensure a means of answering emergency calls on a 24-hour a day basis.
1.2. SCHEDULE OF FUEL PRODUCTS
Diesel Fuel Grade National Stock Number Nomenclature DF1 9140-00-286-5286 Diesel Fuel, Propane
Grade Federal Specification. Nomenclature TYPE II BBG-110, 95% Odorized Propane
1.3. SCHEDULE OF TANKS TO BE SERVICED
Diesel Fuel Site Location Generators
Fuel Type Storage Tank Capacity Estimated Annual
Usage - gallons RRS –Building 3 (West) Two tanks Building 3 (East) One tank Building 3 (North) One tank Building 106, One tank Building 103, One tank Stockbridge, One tank Irish Hill (East), One tank Irish Hill (West), One tank Tanner Hill 1609, One tank Tanner Hill 1610, One tank
DF1 900 gallons,1900 gallons, 500 gallons, 250 gallons 660 gallons 322 gallons 300 gallons 190 gallons 54 gallons 350 gallons 80 gallons
2100 gallons for all
Propane
Site Location Storage Tank Capacity Estimated Annual Usage
Newport facility, Bldg. 1609 - Tanner Hill 1,000 gallons 8,000 gallons Newport facility, Bldg. 1612 - Irish Hill 1,000 gallons – 2 each 6,000 gallons Newport facility, Bldg. 1622 - Irish Hill 500 gallons 250 gallons Newport facility, Bldg. 1624 - Irish Hill 1,000 gallons 5,500 gallons Stockbridge facility Bldg. 1477 (Below ground tank, contractor needs to expose fill pipe during the winter months)
1,000 gallons 2,500 gallons
1.4. UNLOADING PROCEDURES
Contractor personnel should be prepared to prevent and help control transfer spills during unloading and be familiar with the overfill prevention devices associated with the tank being filled. To prevent spills from occurring during loading/unloading, the following spill prevention contingency procedures will be implemented.
1.4.1. BEFORE LOADING
1. Extinguish all flames and sources of ignition (e.g., cigarettes).
2. Ensure that vehicle’s motor and lights are turned off, and the parking brake is set.
3. Attach grounding wire to the truck body.
4. Remove ungrounded objects from the loading/unloading area.
5. Chock truck wheels.
6. Check hose and connections.
7. Check tank level gauge or stick the tank to confirm product level and ensure tank has sufficient capacity to accept transfer. Note working capacity as to not overfill.
8. Ensure that the driver does not remain in the vehicle.
9. All storm and sanitary sewer drains will be covered prior to dispensing fuel.
10. Absorbent material will be out and readily available to respond to a spill.
1.4.2. DURING LOADING
1. Transfer operator must be present and attentive at all times.
2. Because liquid volumes change with temperature, tanks shall not be filled above a level that will result in overflow after thermal expansion. Fill levels are established at 90 percent of tank capacity.
3. Inform driver to stop filling once tank reaches 90 percent capacity.
1.4.3. AFTER LOADING
1. All loading valves should be closed. Note any signs of spillage. Take remedial action, if necessary.
2. Close all hatches tightly.
3. Close internal safety valves.
1.4.4. BEFORE TRUCK DEPARTURE
1. Check all truck drains, outlets, and connections for leakage to prevent petroleum loss in transit.
2. Check unloading area for spills and apply absorbent materials, if needed.
1.4.5. UPON TRUCK DEPARTURE
1. Check all valves, caps, drains, and connections for closure and leakage. Relock them, if necessary.
2. Make a final check of unloading area.
1.5. SPILLS
No hazardous materials or substances, petroleum products, or materials of environmental concern shall be intentionally discharged or spilled onto the ground, asphalt, or concrete-covered surfaces or improperly disposed at job sites. Care should be taken to minimize and avoid fuel spills when refueling. The contractor is responsible for having a spill kit available if an issue arises sufficient to contain a worst case spill, both volume and hazard level. A spill is an uncontrolled release to the environment. As stated in the RRS SPCC Plans(s) (Copy will be provided to Contractor), spills of any type material (excluding clean water) shall be reported to Security Police and the hazardous Waste Program Manager immediately (after control of the spill) for evaluation to determine reporting responsibility and cleanup requirements. The contractor shall clean and remediate any spills or releases. If corrective action is not undertaken in a reasonably prudent time, the government reserves the right to execute cleanup and obtain reimbursement from the contractor. For spill occurring during normal duty hours, contact Security Police at 315-330-2961 and then the RIOCV Hazardous Waste Program Manager at 315-330-2810.
1.6. SUPPLIES
The contractor shall furnish a complete list of all supplies that are anticipated to be used during the contract period to the CO not later than the pre-performance conference for acceptance by the CO. After award, any new supplies added to the contract will need acceptance before being used on the installation. The supply inventory supply list shall contain the following information:
a) Product name
b) Manufacturer
c) Item use
d) Disposal procedures if material remains after usage
e) Storage provisions for item
The contractor shall be responsible for the proper disposal of all supplies.
A Safety Data Sheet (SDS) shall also be provided for each supply item and contractor employees will be trained, by the contractor, on the proper use and disposal of each item. All cleaning and supplies shall be non-flammable.
NOTE: Products containing chloroflourocarbons (CFCs) or ozone depleting substances shall not be allowed or approved for use.
2. GENERAL INFORMATION
2.1. DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT OR VEGETATION
Damages to Government buildings, equipment, or vegetation are addressed in clause 52.237-2 – Protection of Government Buildings, Equipment, and Vegetation. The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor's failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
2.2. ENVIRONMENTAL REQUIREMENTS
In addition to all applicable Federal, State and local environmental codes and regulations, the following specific guidance is provided:
2.2.1. HAZARDOUS MATERIALS
All hazardous materials brought on-site by the contractor prior to use must be approved using the AF 3952 and local processes. See Appendix B for categories of materials that require approval.
Government may remove any materials from consideration for use by the Contractor that contain ingredients prohibited by the AF or other regulatory agency. Contractor will be instructed materials that require the Air Force’s Enterprise Environmental Safety and Occupational Health-Management Information System (EESOH-MIS) tracking. Those materials will require the completion of a Contractor HAZMAT Product Request Form (PRF). This includes products that contain chemicals tracked for Air Quality purposes that may not be considered “hazardous” and any non-commodity batteries. This also includes fuels used to run generators and other construction/maintenance equipment. Contractors shall anticipate a 7-10 business day turn around for approvals. For initial contract PRF/Safety Data Sheet (SDS) submissions, of fifteen or more, a lead time of 20-25 business days can be expected. See Appendix C for the PRF. The Contractor will retain a copy of their Contractor HAZMAT PRFs for the duration of the specified project.
The Contractor will submit a Contractor Material Usage Data Sheet for each unique material to the
COR once a quarter. Any HAZMAT brought on site for the contract and not used in its entirety will be removed from the installation by the Contractor. See Appendix D for a copy of the Contractor Material Usage Data Sheet.
The contractor shall maintain an up-to-date hazardous material inventory with copies of SDS(s) for all materials used on the job site. The contractor shall maintain a complete copy of all approved SDS and AF Form 3952s. At the end of the contract, all excess hazardous materials will be removed by the Contractor. The contractor shall remove all hazardous materials by the end of each workday unless prior approval is granted detailing the amounts and location.
The contractor shall submit an interim inventory report, not later than ten working days following each contract year, of all hazardous materials used since the last hazardous usage report to the CO or COR.
In addition, the final inventory report will list all hazardous materials used, total amount of each used, and a description of the disposition of any remaining hazardous material over the duration of the contract.
2.2.2. SPILL RESPONSE (RESERVED) see Section 1.5 Spills
2.2.3. PESTICIDES (RESERVED)
2.3. PERMITS, LICENSES AND CERTIFICATIONS (RESERVED)
2.4. HOURS OF OPERATION
The contractor shall perform services during normal duty hours which are 0800-1600 Monday – Friday, excluding Federal Holidays. The contractor may work weekends and holidays if approved in advance at his convenience. Work required outside of the standard work hours shall be coordinated with RIOC and RRS Security forces.
2.5. RECOGNIZED HOLIDAYS
The contractor is not required to provide service on federal holidays, except in emergency situations. The holidays are as follows:
New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May
Juneteenth – 19 June Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December
If these holidays fall on Saturday, the preceding Friday will be the observed holiday. If these holidays fall on Sunday, the following Monday will be the observed holiday. If a holiday falls on a scheduled service day, the contractor will be responsible for rescheduling services for the first day post the holiday observance.
2.6. SITE CLOSURES
In addition to the federal holidays identified above, the AFRL Site Director may limit access due to emergency conditions. These conditions may include inclement weather conditions, power outages, and/or other unexpected emergency situations. The Director will announce through public channels, either delayed reporting or closure of RRS facilities due to emergency conditions. This announcement is made solely for safety and security purposes and to inform all personnel (Government and contractor) of site closure/delayed reporting. The Director is not authorizing time off for contractor employees and is not authorizing payment for work not performed.
contractors shall take all appropriate actions to notify their employees of closure/delayed reporting and make alternate work/schedule arrangements, if necessary.
The above applies to emergency situations only. Facilities will remain open for contractor personnel during unscheduled federal closures (e.g., National Day of Mourning) or other instances where Government employees are granted administrative leave in non-emergency situations. Work scheduled but not accomplished because of site closure will be accomplished as soon as possible after reopening the site.
2.7. SECURITY
2.7.1. ACCESS CONTROL
The work to be done under this contract is located in and around areas that are under the scrutiny of the USAF Civilian Police assigned to Rome Laboratory. To gain access to the area(s) to examine the work to be done for job estimation purposes, arrangements must be made through the Contracting Office. contractor personnel will be escorted into the area(s) for the purpose of project estimation.
2.7.2. VISIT REQUESTS
The government sponsor will have their visitor (if possible) complete the DBIDS Pre-Enrollment (https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page) and send the following information to the Visitor Control Center Org Box (afrl.riofsp.vcc@us.af.mil):
Names of visitors, QR code/Six-digit code, Date of visit and Length of visit
The contractor may also supply the Visit Request to the Security Office (AFRL/RIOF) and Contracting Office (AFRL/RIKO). The request will contain the full name of each individual, to include a middle initial, date of birth, state of driver’s license issuance and city and state of birth. If the individual is not a US citizen they will not be allowed within the complex or facilities. If the individual is not a US citizen but has a Green Card, Form I-551 or has the I-551 stamp on their passport, the Security Office will need to see either one. No foreign national workers are allowed on the Rome Research Site.
2.7.3. CONTRACTOR POINT OF CONTACT (POC)
The contractor’s phone number and a Project Leader or Supervisor/Foreman contact number is necessary for use by the Law Enforcement Desk Sergeant. The 24 hour Desk Sergeant can be reached at 330-2961.
https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page mailto:afrl.riofsp.vcc@us.af.mil
2.7.4. BUILDING ACCESS
All facilities are entered using a proximity entry badge. Any personnel such as
Supervisor/Foreman or Project Leaders who may need building access for meetings etc., during the contract period, can acquire a DBIDS Badge from the Security Office located in the lobby of Building 3, West Wing with a valid visit request. This badge will be worn at all times and will be returned to the Contracting Officer’s Representative upon completion of the final inspection and acceptance of work. Any badges lost during the period of work will be reported to the Security Office as soon as possible.
2.7.5. ROME RESEARCH SITE (RRS) COMPLEX ACCESS CONTROL
Access to the RRS Complex is controlled by a main gate at 304 Brooks Rd, Rome, NY 13441, located just east of the March St. & Brooks Rd. intersection. Identification for the contractor to enter with a vehicle will be on an access list supported by the magnetic media entry badge issued.
2.7.6. NEWPORT AND STOCKBRIDGE SITES ACCESS CONTROL
Access to either site will follow the same visit request requirements and site access will be coordinated through RIO Facility Managers.
2.7.7. COMMERCIAL VEHICLES
All commercial vehicles are searched prior to entry into the RRS Complex. Vehicle operators will be aware of the vehicle search pull-off area prior to approaching the main gate. A search of the vehicle will be conducted prior to its entry. All vehicles not needed for delivery of equipment or tools will be parked in the visitor parking area unless cleared through the Security Office. No vehicles (other than mowers) are allowed within 25 meters (80 ft.) of the RRS facilities. One-time deliveries can be escorted from the gate to delivery point by project personnel.
2.7.8. POSTED SIGNAGE
All contractor personnel will be aware that the Rome Research Site is property of the United States
Air Force and they will follow all posted signage
2.7.9. EMERGENCIES REQUIRING EVACUATION
Contractor personnel will be notified by RRS Police of any emergencies which would require an evacuation or work stoppage, such as an increase in the Force Protection Condition.
2.7.10. PHOTOGRAPHY AND VIDEOGRAPHY
Photography and videography of RRS facilities and surroundings is strictly prohibited.
2.7.11. CONTRACTOR/EMPLOYEE SITE PASS AND IDENTIFICATION
The contractor shall comply with all requirements and procedures IAW AFFARS 5352.242-9000, contractor Access to Air Force Installations. All required documentation shall be submitted at the pre-performance conference.
2.8. TRAFFIC LAWS
The contractor and its employees shall comply with all site traffic regulations.
2.9. WEAPONS, FIREARMS, AND AMMUNITION
Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned or privately owned vehicle while on the AFRL/Rome Research Site.
2.10. PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY
Services requirements under this PWS are not essential to be performed during a declared crisis.
2.11. GOVERNMENT INTERFACE
Do not unduly interfere with regularly scheduled Government operational activities in the performance of contract requirements. In the event a Government supervisor so requests, temporarily cease work in the area and report the instructions, to include name of the Government person involved, to the CO immediately by the most expedient means. Notify the CO verbally of disputes with customers or other base contractors and follow-up in writing.
2.12. SAFETY
The contractor shall comply with all applicable Occupational Safety and Health Administration (OSHA) standards, federal, state, and local laws, regulations, and requirements regarding worker safety while performing on the Air Force Research Laboratory, Rome Research Site. Compliance shall also include following industry standards concerning worker safety and personal protective equipment. The contractor shall comply with all safety and health requirements necessary for the protection of personnel, facilities and equipment
2.12.1. SPECIFIC SITE REQUIREMENTS
2.12.1.1. Written Safety Program
Maintain a written Safety Program, as required by OSHA and make said plan available for review by the Government upon request by the contracting officer.
2.12.1.2. Mishaps
In the event of a mishap during the performance of this contract on AFRL/RRS premises, the contractor shall notify the CO in an expeditious manner.
2.12.1.3. Mishap Documentation Requirement
a. Contract, Contract number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (events leading to accident/incident)
d. Cause of accident/incident (if known)
e. Estimated cost of accident/incident (material and labor to replace/repair)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective Actions (taken or proposed)
h. Other pertinent information
2.13. EQUIPMENT OPERATORS
Equipment operators must possess current and appropriate operator license or certificate for the equipment utilized.
2.14. WORKMANSHIP
All work shall be performed by qualified, experienced contractor personnel.
2.15. TOOLS
All tools shall be furnished by the contractor.
2.16. CONTRACT MANAGER
The contractor shall establish and maintain an office through which the contract manager or alternate(s) can be contacted during work hours. The contract manager or alternate shall be available (within 1 hour) during normal duty hours to meet on the site with the government personnel designated by the CO to discuss problem areas. The contractor shall provide the CO with telephone number(s) where validation results and complaints can be reported.
The contractor shall also provide to the CO the names and phone numbers of contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept updated by the contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.
2.17. PERSONNEL
Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract.
The government is authorized to restrict the employment under the contract of any contractor employee or prospective contractor employee, who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
3. LIST OF APPENDICES:
APPENDIX A - FEDERAL STOCK CLASSES REQUIRING CONTRACTOR REPORTING
Federal Stock Class Description 2640 Tire rebuilding and tire and tube repair materials 3439 Miscellaneous Welding, Soldering, and Brazing Supplies and Accessories 5610 Mineral Construction Materials, Bulk 5640 Wallboard Building and Thermal Insulation
6130/40 Batteries 6550 In Vitro Diagnostic Substances, Reagents, Test Kits and Sets 6750 Photographic Supplies 6810 Chemicals 6820 Dyes 6830 Gases: Compressed and Liquefied 6840 Pest Control Agents and Disinfectants 6850 Miscellaneous Chemical Specialties 7930 Cleaning and Polishing Compounds and Preparations 8010 Paints, Dopes, Varnishes, and Related Products 8030 Preservative and Sealing Compounds 8040 Adhesives 8720 Fertilizers 9110 Fuels, Solid 9130 Liquid propellants and fuels, petroleum case 9135 Liquid propellant fuels and oxidizers, chemical base 9140 Fuel Oils 9150 Oils and Greases: Cutting, Lubricating, and Hydraulic 9160 Miscellaneous Waxes, Oils and Fats
Products Containing Chemicals in the following Stock Classes are required to be reviewed and reported, additional stock classes may exist. If unsure, please submit for review. All non-commodity batteries must be submitted for review.
APPENDIX B – PRODUCT REQUEST FORM
APPENDIX C – PRODUCT USAGE FORM
| 1. OBJECTIVE |
| 1.1. DESCRIPTION OF SERVICES |
| 1.2. SCHEDULE OF FUEL PRODUCTS |
| 1.3. SCHEDULE OF TANKS TO BE SERVICED |
| 1.4. UNLOADING PROCEDURES |
| 1.5. SPILLS |
| 1.6. SUPPLIES |
| 2. GENERAL INFORMATION |
| 2.1. DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT OR VEGETATION |
| 2.2. ENVIRONMENTAL REQUIREMENTS |
| 2.3. PERMITS, LICENSES AND CERTIFICATIONS (RESERVED) |
| 2.4. HOURS OF OPERATION |
| 2.5. RECOGNIZED HOLIDAYS |
| 2.6. SITE CLOSURES |
| 2.7. SECURITY |
| 2.8. TRAFFIC LAWS |
| 2.9. WEAPONS, FIREARMS, AND AMMUNITION |
| 2.10. PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY |
| 2.11. GOVERNMENT INTERFACE |
| 2.12. SAFETY |
| 2.13. EQUIPMENT OPERATORS |
| 2.14. WORKMANSHIP |
| 2.15. TOOLS |
| 2.16. CONTRACT MANAGER |
| 2.17. PERSONNEL |
| 3. LIST OF APPENDICES: |
| APPENDIX A - FEDERAL STOCK CLASSES REQUIRING CONTRACTOR REPORTING |
| APPENDIX B – PRODUCT REQUEST FORM |
| APPENDIX C – PRODUCT USAGE FORM |
File details come from the government source that posted it. Updated .