Attachment 1 - PWS for HRD Toilet Vault Pumping.pdf

PDF 298 KB Posted

Attached to
HRD Toilet Vault Pumping Services
Solicitation number
1240BF24Q0047
Issued by

About this file

This document is a Performance Work Statement (PWS) for a Firm-Fixed Price (FFP) service contract to provide toilet vault pumping services to the Hoonah Ranger District (HRD) of the Tongass National Forest. The contractor will be required to furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items necessary to provide pumping services to 4 toilet vaults located along the Chichagof Island road system in Alaska. The contract has a 1-year base period and up to four 12-month option periods. Pumping services are required 1-2 times per year, with the ability for the Government to add, remove, or change the items and quantities as needed. The contractor must develop and maintain a Quality Control Plan and provide a work schedule for the services. Payment will be made only for work performed and authorized under the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS for HRD Toilet Vault Pumping (Version 2024.08.06) Page 1

Performance Work Statement HRD Toilet Vault Pumping Services

General Information

1.0 General

This is a non-personal services contract to provide toilet vault pumping services to the Hoonah Ranger District (HRD), Tongass National Forest (TNF). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the Government.

2.0 Purpose

The purpose of this contract is to provide pumping services to toilet vaults located along the Chichagof Island road system to control waste levels and avoid waste flooding during the Alaska Summer Season (May to September).

3.0 Description of Services

The contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide pumping services to 4 toilet vaults located along the Chichagof Island road system on the Hoonah Ranger District. The contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.

4.0 Place of Performance

The work shall be performed at Chichagof Island, Alaska.

5.0 Period of Performance

The period of performance shall be as indicated below.

Period POP Start Date POP End Date Base Period Date Of Award 14 September 2025 Option Period 1 (12-Month Option Period) 15 September 2025 14 September 2026 Option Period 2 (12-Month Option Period) 15 September 2026 14 September 2027 Option Period 3 (12-Month Option Period) 15 September 2027 14 September 2028 Option Period 4 (12-Month Option Period) 15 September 2028 14 September 2029

6.0 Contract Type

The Government will award a Firm-Fixed Price (FFP), Requirements, Service Contract with up to a 5-Year Ordering Period. Performance shall be made only as authorized by Task Orders issued IAW the Ordering Clause. Subject to any limitations in the Order Limitations Clause or elsewhere in this contract, the contractor shall furnish to the Government all services specified in the Schedule of Items and called for by orders issued IAW the Ordering Clause.

Note: Task Orders will be issued at the rates specified in the Schedule of Items. The quantities specified in the Schedule of Items are estimates only and are not guaranteed quantities.

7.0 Government Regular Working Hours

The Government's regular working hours are Monday through Friday from 0700 to 1700, except federal holidays or when the government installation is closed due to local or national emergencies, administrative closings, or similar government directed closings.

8.0 Contractor Hours of Operations

PWS for HRD Toilet Vault Pumping (Version 2024.08.06) Page 2

The contractor is responsible for conducting business during or after government regular working hours, and to maintain at all times an adequate workforce for the uninterrupted performance of all tasks defined within this PWS.

9.0 Federal Observed Holidays

When a federal holiday occurs on a Saturday, federal employees are normally granted the previous Friday as the holiday observance. When a federal holiday occurs on a Sunday, federal employees are normally granted the following Monday as the holiday observance. Below is the list of recognized federal holidays:

Federal Holidays New Year’s Day (January) Labor Day (September) Martin Luther King Jr’s Birthday (January) Columbus Day (October) President’s Day (February) Veteran’s Day (November) Memorial Day (May) Thanksgiving Day (November) Juneteenth Day (June) Christmas Day (December) Independence Day (July)

10.0 Contractor Key Personnel

Contract Manager: The contractor shall provide a Contract Manager and designated alternate, as applicable, who has full authority to act for the contractor on all contract matters relating to this contract. The Contract Manager or alternate shall be available during the Government's regular working hours.

Quality Control Representative: The contractor shall provide a Quality Control Representative who shall be responsible for the contractor’s Quality Control Plan (QCP) to ensure services are performed IAW the PWS. The Quality Control Representative shall implement and maintain full compliance of the QCP throughout the contract period.

11.0 Government Key Personnel

Contracting Officer (CO): The CO is the only person with the authority to enter into, administer, and or terminate contracts;

make related determinations and findings on behalf of the government; and legally bind the government. The CO shall ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO shall determine and document the final assessment of the contractor's performance in the government’s past performance tracking system.

Contracting Officer’s Representative (COR): A COR may be assigned to this contract to monitor all technical aspects and assist in contract administration. The COR may be authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communication with the contractor concerning technical aspects of the contract;

issue written interpretations of technical requirements (without increasing or decreasing contract scope), including Government drawings designs, and specifications; monitor contractor's performance and notify both the CO and contractor of deficiencies; and provide site entry of contractor personnel. The COR is not authorized to change any of the terms and conditions of the contract or any resulting task order.

12.0 Post-Award Conference and Periodic Progress Meetings

The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The CO and/or COR shall meet periodically with the contractor to review the contractor's performance. At these meetings the CO will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

13.0 Changes

The quantities specified in the Schedule of Items are estimates only and are not guaranteed quantities. The government reserves the right to add, remove, or change the items and quantities to be serviced under this contract, as required. Price adjustments for these changes shall be based on the rates specified in the Schedule of Items for identical or similar items.

Changes will only be authorized by a warranted CO.

PWS for HRD Toilet Vault Pumping (Version 2024.08.06) Page 3

14.0 Inspection and Acceptance

Any inspection and acceptance will be at the location specified in the contract. The designated COR will act as the representative of the CO for purposes of inspection and acceptance of services to ensure compliance with the terms, conditions, and specifications of the subject contract. The COR has no authority to make any changes to the terms and conditions of the contract.

15.0 Invoicing and Payment

All contractor invoices shall be submitted via the Invoice Processing Platform (IPP) using contract line item numbers (CLINs). The contractor shall be required to establish account(s), access method(s), log-in(s), and necessary training in order to submit invoices through IPP. Invoices not submitted via IPP shall not be accepted or paid.

Note: The contractor shall only invoice for work performed and as authorized by the contract and any resulting task orders issued IAW the Ordering Clause. Payment will be made only for those items listed on the Schedule of Items.

16.0 Travel

Work performance under this contract requires access to Hoonah via marine or air travel. The contractor shall be responsible for all travel to and from the work site locations.

Security and Safety Requirements

17.0 Security

The contractor shall be responsible for safeguarding all government property provided to the contractor for contractor use under this contract. At the close of each work period, all government property shall be secured.

18.0 Access to Government Facilities

The contractor shall coordinate all contractor personnel access to government facilities with the COR at least 5 business days prior to any scheduled service or visit. Only contractor personnel performing work under this contract shall have access to government facilities. If no coordination is made, access will be denied. Contractor personnel entering government facilities shall abide by all security regulations.

19.0 Key Control

No keys or key cards shall be issued to the contractor under this contract.

20.0 Identification of Contractor Employees

All contract personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves by wearing clearly written and visible nametags at all times, as such to avoid creating an impression in the minds of members of the public that they are Government officials.

21.0 Conduct of Contractor Personnel

The CO may require the contractor to remove from the work site any employee working under this contract for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor employee shall be subject to dismissal from the premises upon determination by the CO that such action is in the best interests of the government. Such removal from the work site or dismissal from the premises shall not relieve the contractor of the requirement to provide sufficient personnel to perform the services as required by this PWS.

22.0 Safety

Contractor activities shall be conducted in a safe manner that minimizes accidents as well as any impacts on Government operations and members of the public. Contractor shall comply with applicable federal, state, and local codes and standards, including safety and occupational health requirements, as well as any additional specific requirement contained in this PWS.

PWS for HRD Toilet Vault Pumping (Version 2024.08.06) Page 4

Technical Requirements

23.0 Specific Tasks

The contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide pumping services to 4 toilet vaults located along the Chichagof Island road system on the Hoonah Ranger District. The contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.

The following establishes the required tasks and the minimum acceptable levels of service:

Task 1 - Pumping of Toilet Vaults: The duties on this task include the pumping of four 500-gallon toilets vaults located along the Chichagof Island road system. The vaults shall be fully pumped (with no remaining matter) at each service interval (1 to 2 times a year). Services shall be performed IAW the terms of each task order. Access to the vaults shall be coordinated with the COR.

The contractor shall take extreme care to prevent any spillage of waste from vaults contents. In the event a spillage does occur, the contractor shall thoroughly clean the entire area contaminated by the spill, IAW the Occupational Safety and Health Administration (OSHA), USDA Health and Safety, and all applicable federal, state, and local laws and regulations. The contractor shall remove all contamination at their expense, prior to leaving the area.

24.0 Toilet Vaults List

Below is a list of the toilet vaults covered under this contract.

Item

Unit Location Quantity Vault Capacity

Frequency of Services (Anticipated)

1 Lower Suntaheen Located 15 miles East of the HRD Office off of Forest Road 8530.

1 500 Gallon Up to Twice a Year

2 Suntaheen Nature Watch

Located 15 miles East of the HRD Office off of Forest Road 8530.

1 500 Gallon Up to Twice a Year

3 Kennel Creek Cabin Located 27 miles Southeast of the HRD Office.

1 500 Gallon Up to Twice a Year

4 Kennel Creek Day Use Site

Located 27 miles Southeast of the HRD Office.

1 500 Gallon Up to Twice a Year

NOTE: The government does not guarantee the number of orders that will be made for each location. It is estimated that the government will request services at least once a year, some locations may require services twice a year. The expected summer season in Alaska opens in May and closes in September of each year. Additional services may be requested on an as needed basis for all locations.

Additional Requirements

25.0 Work Schedule

The COR may request the contractor a work schedule for work to be performed at the contract or task order level. The contractor shall develop a work schedule and submit it to the COR NLT 5 business days from the date the contractor receives notification from the COR. An updated copy shall be provided to the COR as changes occur. All services shall be coordinated with the COR at least 72 hours prior to performing services.

26.0 Quality Control Plan (QCP)

The contractor shall develop and maintain an effective QCP to ensure services are performed IAW this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

The contractor’s QCP is the means by which the contractor assures that their work complies with the requirements of the contract. The contractor’s QCP shall be provided to the COR NLT 10 business days after contract award. The COR will review the contractor’s QCP. The contractor shall receive in writing the COR’s acceptance and/or any proposed changes to the QCP.

PWS for HRD Toilet Vault Pumping (Version 2024.08.06) Page 5

27.0 Special Qualifications

The contractor shall, at no additional cost to the government, obtain all licenses and permits required for performance of work and for complying with all applicable local, state, and federal laws and regulations.

28.0 Service Interruptions

If any services must be interrupted (even temporarily) due to maintenance of contract work, the contractor shall notify the CO and COR at least 3 business days in advance. If the service is due to an emergency breakdown, the contractor shall notify the CO and COR as soon as practicable.

Deliverables Schedule

29.0 Key Deliverables

The contractor shall submit an electronic copy of all deliverables to the CO and COR in PDF format and phrased in layperson language. Below is a list of all deliverables outlining each objective and due date.

Item # Deliverable Objective Due 1 Work Schedule Provide a timeline of the services to be provided under this contract and/or task order IAW this PWS and as requested by the COR.

NLT 5 business days from the date the contractor receives notification from the

COR.

2 Quality Control Plan

Provide a QCP that implements procedures to identify, prevent and ensure non-recurrence of defective services.

NLT 10 business days after contract award.

3 List of Contractor Personnel

Provide a list of all contractor personnel assigned to this contract and their point of contacts.

NLT 5 business days after contract award. An updated copy shall be provided to the CO and COR as changes occur.

4 Invoices Invoices shall be submitted via IPP. NLT 10 business days after work performance.

Performance Requirements Measures

30.0 Contractor’s Performance

The government expects the contractor to work at an acceptable performance level throughout the life of the contract, and the contractor’s performance shall be given significant consideration when evaluating recommendations for future government contracts and/or awards.

31.0 Acceptable Performance

Acceptable performance is achieved if 95% of the requirement is successfully satisfied. The contractor’s acceptable performance will be rated in COR reports and in the Contractor Performance Assessment Reporting System (CPARS) as Satisfactory, Very Good, or Exceptional.

32.0 Unacceptable Performance

Unacceptable performance is achieved if less than 95% of the requirement is satisfied (e.g., work specified by contract is incomplete or work is not IAW the PWS, task order, and manufacturer’s specifications). If the performance is deemed unacceptable for any objective (required task), the COR will determine the possible cause of this unacceptable performance. Unacceptable performance caused by actions of the contractor shall be reported to the contractor’s on-site representative and request its signature on documentation acknowledging notification. Unacceptable performance caused by actions of the Government shall not be held against the contractor. If the contractor disputes the results of surveillance, the COR must refer the contractor to the CO for resolution. The contractor’s unacceptable performance will be rated in COR reports and in CPARS as Marginal or Unsatisfactory.

PWS for HRD Toilet Vault Pumping (Version 2024.08.06) Page 6

33.0 Performance Requirements Summary

Item

Performance Objective

Performance Standard Performance Threshold

Surveillance Method Remedy

1 Pumping of Toilet Vaults

Work shall be performed IAW this PWS, the terms of each task order, and all applicable federal, state, and local laws and regulations.

No variances allowed. 100% services performed as required by the contract.

100% inspections by the COR at time of service.

The government has the right to change or modify inspection methods at its discretion.

Rework within 7 days at no cost to Government for defective services.

Full invoice payment upon successful completion and acceptance.

Government-Furnished Property and Utilities

34.0 Government-Furnished Property

The Government will not provide Government-Furnished Property for the performance of this contract.

35.0 Government-Furnished Utilities

The Government will not provide Government-Furnished Utilities for the performance of this contract.

Definitions, Acronyms, and Applicable Laws, Regulations and Guidance

36.0 Definitions

Acceptance: The act of an authorized representative of the Government by which the Government, for itself or as agent of another, assumes ownership of existing identified supplies tendered or approves specific services rendered as partial or complete performance of the contract.

Business Day: Refers to any day in which government normal business operations are conducted. For this contract, a business day will be IAW PWS Paragraph 6.0, Government Regular Working Hours.

Calendar Day: Refers to the period of elapse time, using Coordinated Universal Time or local time that begins at midnight and ends 24 hours later at the next midnight.

Contracting Officer (CO): A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer. "Administrative Contracting Officer (ACO)" refers to a Contracting Officer who is administering contracts. "Termination Contracting Officer (TCO)" refers to a Contracting Officer who is settling terminated contracts. A single Contracting Officer may be responsible for duties in any or all of these areas.

Contracting Officer’s Representative (COR): An individual, including a Contracting Officer’s Technical Representative (COTR), designated, and authorized in writing by the Contracting Officer to perform specific technical or administrative functions.

Contractor: A supplier or service provider that enters into a contract with the Government to provide specific supplies or services to the Government. The term in this contract refers to the prime.

Day: Unless otherwise specified, it means a calendar day.

Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

PWS for HRD Toilet Vault Pumping (Version 2024.08.06) Page 7

Equipment: A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.

Facility: An establishment, structure, or assembly of equipment designated for a specific function; something designed, built, installed, etc., to serve a specific function affording a convenience or service.

Government-Furnished Property (GFP): Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Government Property: All property owned or leased by the Government. Government property includes both government-furnished property and contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Inspection: Examining and testing supplies or services (including, when appropriate, raw materials, components, and intermediates assemblies) to determine whether they conform to contract requirements.

Invoice: A contractor’s bill or written request for payment under the contract for supplies delivered or services performed.

Line Item: the basic structural element in a procurement instrument that describes and organizes the required product or service for pricing, delivery, inspection, acceptance, invoicing, and payment. The use of the term "line item" includes "subline item," as applicable.

Line Item Number (LIN): Either a numeric or alphanumeric format to identify a line item.

Non-Personal Services Contract: A contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government IAW FAR 37.012, under general contracting authority, and do not require specific statutory authorization.

Option: Unilateral right in a contract by which, for a specified time, the Government may elect to purchase additional supplies or services called for by the contract, or may elect to extend the term of the contract.

Performance Objectives: Describe the work that is to take place.

Performance Requirements Summary (PRS): Identifies the key performance indicators of the contract that will be evaluated by the Government to ensure the contractor meets standards.

Performance Standard: Describe the desired results that are to be achieved. A measure of comparison; an acceptability criterion; a benchmark or yardstick against which a service will be measured.

Quality Assurance (QA): Refers to the various functions, including inspection, performed by the Government to determine whether a contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP): An organized written document used by the Government for quality assurance surveillance. A plan describing how the government will survey, observe, test, sample, evaluate and document the contractor’s performance in meeting critical performance standards identified in the contract.

Quality Control (QC): Refers to the various functions performed by the contractor to control and improve the quality of goods and services provided.

Quality Control Plan (QCP): An organized written document used by the contractor for quality control. A contractor’s internal quality assurance procedures for measuring, tracking, reporting, and analyzing contract performance. A contractor’s QCP is separate from the government’s QASP.

PWS for HRD Toilet Vault Pumping (Version 2024.08.06) Page 8

Random Sampling: A method of looking at a few individual items in a lot to determine the quality of that lot against a standard.

Service Contract: A contract that directly engages the time and effort of a contractor whose primary purpose is to perform an identifiable task rather than to furnish an end item of supply.

Serviceable Condition: Refers to items that are usable; ready for use; in proper operating condition; durable; clean and in good condition; usable for its intended purpose.

Sub-Contractor: One that enters into a contract with a prime contractor. The Government does not have privy of contract with the sub-contractor.

Task Order (TO): An order for services placed against an established contract or with Government sources.

37.0 Acronyms

Acronym ACOR Alternate Contracting Officer Representative ADA Americans with Disabilities Act

ADEC Alaska Department of Environmental Conservation AGAR Agriculture Acquisition Regulation BMP Best Management Practices CAP Contractor Acquired Property CFE Contractor Furnished Equipment CFM Contractor Furnished Material CFP Contractor Furnished Property CFR Code of Federal Regulations CLIN Contract Line Item Number CO Contracting Officer

COR Contracting Officer Representative COTS Commercial-Off-the-Shelf

CPARS Contractor Performance Assessment Reporting System DID Data Item Description EPA Environmental Protection Agency

FAPIIS Federal Awardee Performance and Integrity Information System FAR Federal Acquisition Regulation

FPDS Federal Procurement Data System FS Forest Service

FSH Forest Service Handbook FSM Forest Service Manual GFE Government-Furnished Equipment GFM Government-Furnished Material GFP Government-Furnished Property

HIPAA Health Insurance Portability and Accountability Act of 1996 IAW In Accordance With IAS Integrated Acquisition system IPP Invoice Processing Platform N/A Not Applicable

NEPA National Environmental Policy Act NLT No Later Than NTE Not to Exceed OCI Organizational Conflict of Interest ODC Other Direct Costs OMB Office of Management and Budget

OSHA Occupational Safety and Health Administration PA Property Administrator

PIPO Phase In/Phase Out POC Point of Contact

PWS for HRD Toilet Vault Pumping (Version 2024.08.06) Page 9

POP Period of Performance PRS Performance Requirements Summary PUB Publication PWS Performance Work Statement QA Quality Assurance

QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan

QC Quality Control QCP Quality Control Plan SAM System for Award Management SDS Safety Data Sheets SF Standard Form

TBN To Be Negotiated TE Technical Exhibit TO Task Order

USC United States Code USDA United States Department of Agriculture

WD Wage Determination

38.0 Applicable Laws, Regulations, and Guidance

The contractor shall perform the required services IAW the specifications in this PWS, and all applicable federal, state and local laws and regulations. Additional requirements and information may be found from the following sources:

EPA: Environmental Protection Agency (https://www.epa.gov)

NEPA: National Environmental Policy Act (https://www.epa.gov/nepa)

OSHA: Occupational Safety and Health Administration (https://www.osha.gov)

File details come from the government source that posted it. Updated .