This Performance Work Statement (PWS) details a comprehensive interior design and renovation project for the Naval Air Station North Island (NASNI) Galley in Coronado, CA. The contractor will provide custom mixed-media mural installations with high-definition photography, integrated LED lighting, floating walls, and decorative elements across multiple areas including Orange Dry Wall, Café Area, CPO Wall, Front Desk, Café Hall, Main Area, and Galley spaces. The project requires a professional visual artist to design and implement a cohesive aesthetic that incorporates custom wallpaper, vinyl, hand-painted accents, wood elements, and 11 custom metal signs.
The project has a 90-day completion timeline, with the first 30 days dedicated to design phase, drafting, and final design approval, followed by 30-60 days for installation. Work is to be performed in Building 678 at Naval Air Station North Island OPS Side, with contractors permitted to work Monday through Friday from 0730-1700, avoiding meal hours. The contractor is responsible for obtaining base access, providing dust containment, daily cleanup, and coordinating work with the Food Service Officer. The primary point of contact is CSC Ulises Gutierrez, with CWO3 Pearl Amoako as the alternate contact.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4.02 N00244-25-Q-S110 Combined Synopsis Galley Upgrades 1.pdf | ||
| N00244-25-Q-S110 Combined Synopsis Galley Upgrades.pdf | ||
| 1.02 WD 2015-5635 (Rev.28) San Diego.pdf | ||
| 04 NASNI TECHNICAL EXHIBITS.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
Naval Air Station North Island NASNI Galley
BLGD 794 South R Ave.
Coronado, CA 92118
1. GENERAL: This requirement is for contractor to provide dining facility furniture, lighting fixtures, decorative signage, and modification of interior of facility to include window, doors, walls identified at Naval Base Coronado in Naval Amphibious (NAB) & Naval Air Station North Island (NASNI) galleys.
2. SCOPE OF WORK: The contractor will provide materials, labor, supervision, installation and delivery of all items listed, unless noted otherwise in strict accordance with these specifications. The contractor will provide both custom design services as well as fabrication of custom mixed-media mural(s) with integrated lighting and floating walls.
3. Tasks 1: Naval Air Station North Island Galley. Contractor will provide digital prints from selected pictures on walls to be identified by the customer as outlined below:
3.1 Orange Dry Wall custom mixed or installation with high-definition, photography
3.1.1 Orange Area (drywall)
3.1.2 Approximate measurements 9’ x 2: 47 wide 12.5” round
3.2 Café Area- Orange Tile Section custom high-definition, photography with high definition, photography integration.
3.2 Approximate 68 x 108”
3.3 CPO Wall area custom design art installation with high-definition photography.
3.3.1 Print: IJ 35C matte laminate Finish: Trim to size
3.3.2 Approximate 47 W x 126” T
3.4 Front Desk custom art installation with backlight high-definition photography integration.
3.4.2. Approximate size 54” W (2 sides) x 8’ W (front) x 33” T
3.5 Café Hall short side custom art installation with high definition, photography integration.
3.5.1 Approximate 30’W x 126” T / 56’ W x 126” T
3.6 Main Area art installation with high definition, photography integration.
3.6.1 Approximate 103” tall x 44’ long/ 2 additional sections 8’ x 24”
3.7 Galley mix media art installation with high definition, photography
3.7.1 Entire upper galley 350’ long by 45” tall.
3.8 Custom Signs mixed media art installation with high definition, photography
3.8.1 11 custom metal signs size 2’W x 6”H.
4. ADDITIONAL REQUIREMENTS
a. The contractor shall provide consultation services to gain an understanding of specific visual references to incorporate into the mural work that are expressive of the location, culture, interest, or desired aesthetic of the client.
b. The contractor shall use a professional visual artist, design a mixed-media mural wall(s) that incorporates custom, commercial-grade wallpaper or high tach commercial grade vinyl, hand painted accents, high definition photography integration, LED lighting, wood, floating walls to create a 3 dimensional effect, and any other materials needed to enhance the overall look and feel of the space. (Consideration to the use of props, such as hanging décor, should be included and provided to further established the desired look and feel of the space.) The design should be artistic in nature and employ the use of stylization, fonts, negative and positive space, color, and texture to create a final look.
c. The contractor shall provide a visual artist’s draft using photo specific references of the space to show the full layout of elements, colors, textures, lighting, etc.
d. The contractor shall asses and prepare all affected areas to ensure proper installation of mixed media mural wall(s). Preparation may include but not be limited to, removal of molding, preexisting fixtures, repairing of holes or uneven textures, application of necessary primer, etc.
e. The contractor shall fabricate floating walls that create a three dimensional effect and layered aesthetic while simultaneously integrating walls into an overall cohesive design.
f. The contractor shall install LED lighting (backlighting) integrated into floating walls that create visual interest and align with the overall look and feel of the space. The contractor shall ensure the proper wiring and wire management of all electronic elements.
g. The contractor shall fabricate and install all visual aspects of mixed-media walls, including but not limited to, custom wallpaper or vinyl, hand-done painting, wood accents, veneers, stains or other specialty finishes. The contractor shall ensure the full design extends throughout floating walls while maintaining one cohesive look.
5. CONTRACTOR RESPONSIBILITIES
a. Contractor is responsible for verifying all dimensions prior to bidding and installation.
b. The contractor will provide personnel who are certified to perform required tasks.
c. Contractor will be permitted to work inside of the Dining Facility during the following hours: Monday through Friday - 0730-1700 except during meal hours and holidays.
Meal hours are: Breakfast: 0600-0730; Lunch: 1100-1230; Dinner 1600-1730. Night or weekend shift may be coordinated with Food Service Officer with no additional cost in pricing. Night shift is preferred if project involves loud noise and heavy dust to not interfere with patrons during meal hours and must be coordinated with the FSO. Exact days of work will be coordinated before commencement to ensure space availability.
Coordinate with LCPO /FSO before commencing work to ensure serving line or each section is secured for work while utilizing different serving lines to serve the patrons.
Immediate work area will be properly secured by the contractor and will not conflict with meals being served or dining area being utilized.
d. Contractor will provide plastic barriers to contain dust or paint.
e. Contractor is responsible for daily clean up and disposal of all generated debris/materials to proper disposal or recycle containers at the back dock.
f. Contractor is responsible to obtain necessary security pass for base access. The government will not provide escorts to and from the gate.
6. COMPLETION: This project must be fully completed within 90 days after contract award. First 30 days will be allotted for design phase, drafting, editing, and final approval of design. Once design has been approved, 30-60 days will be allotted for installation.
7. Place of performance.
Naval Air Station North Island OPS Side (NASNI), Building 678.
8. Point of contact:
Primary: CSC Ulises Gutierrez, 619-791-9879, Ulises.Gutierrez2.mil@us.navy.mil.
Alternate: CWO3 Pearl Amoako, 619-888-4261, pearl.amoako.mil@us.navy.mil