Attachment 1 PWS.pdf

PDF 1 MB Posted

Attached to
Track Frame Repair for John Deere Dozer
Solicitation number
FA500425I3002
Issued by

About this file

This Performance Work Statement (PWS) details a non-personnel service contract for line boring track frame repairs for a John Deere 950J Dozer (serial No. 1LU950JXEZTO11877) located at Eielson AFB, Alaska. The contractor is required to weld, rebore pivot shaft and bores, and install bushings on 2 track frame swing arms, with the government providing all replacement parts prior to service.

The specific parts to be used include 2 each of LW9813528 and LW9813540 bushings, LW9743435 rings, LW9743343 seals, 4 each of LW9743420 washers, and 2 each of LW9743421 plates. The contractor must coordinate drop-off and pick-up locations with the government, notify and obtain approval for any additional maintenance requirements, and perform work during Eielson AFB operation hours (07:00 – 16:00 Monday through Friday), excluding federal holidays and facility closures.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11D00219 LINE BORING TRACK FRAMES REPAIRS

PERFORMANCE WORK STATEMENT (PWS)

10 MARCH 2025

1. GENERAL SCOPE: This is a non-personnel service contract to provide a non-routine service to 2 track frames from a John Deere 950J Dozer serial No. 1LU950JXEZTO11877.

The contractor shall provide all personnel, equipment, supplies, facilities, tools, materials, supervision and all non-personal services necessary to perform the requirement as defined in this PWS. The contractor shall also perform to the standards within the contract.

1.2 OBJECTIVES: The contractor at minimum shall repair the aforementioned track frames by providing the below services and routine maintenance checks. The contractor is required to furnish and provide all necessary tools and materials required to complete the service. The government is required to provide all replacement parts to the contractor prior to starting service. Parts Breakdown attached to PWS.

1.2.1 SERVICES:

• Weld, rebore pivot shaft and bores and install bushings on 2 track frame swing arms.

1.2.2 PARTS:

2 EA LW9813528 BUSHING

2 EA LW9813540 BUSHING

2 EA LW9743435 RING

2 EA LW9743343 SEAL

4 EA LW9743420 WASHER

2 EA LW9743421 PLATE

1.3 PLACE OF PERFORMANCE: The contractor is responsible for communicating to the government the area in which the services will be executed. The track frames are currently unserviceable and located on Eielson AFB, AK.

1.4 CONTRACTOR’S RESPONSIBILITIES: The contractor at minimum is responsible for:

• Adhering to all items in line 1.2.1 Services.

• Coordinating with the government a location for dropping off and picking up the track frames.

• Notifying the government of any additional maintenance requirements and garnering approval before performing any work not captured in the scope of this PWS.

1.5 HOURS OF OPERATION: Eielson AFB operation hours are 07:00 – 16:00 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

7. PWS(Vehicle).pdf
950 Track Frame Parts Breakdown.pdf

File details come from the government source that posted it. Updated .