Attachment 1 _Purchase Description_ MBITR BATS-D Radio Charger.pdf

PDF 209 KB Posted

Attached to
Multiband Inter/Intra Team Radio (MBITR) Desktop Charger for the Battlefield Awareness Tactical System – Dismounted (BATS-D) Handheld Radio
Solicitation number
FA820525QB003
Issued by

About this file

This Purchase Description (PD) details technical requirements for Multiband Inter/Intra Team Radio (MBITR) Desktop Chargers for the Battlefield Awareness Tactical System – Dismounted (BATS-D) Handheld Radio, supporting the F-22 Support Equipment Program Office. The government requires 19 desktop chargers capable of charging one or two AN/PRC-161 BATS-D handheld radios, with specific technical specifications including power input ranges (100-240V AC and 10-32V DC), dimensions, weight, and operating temperature ranges. The chargers must be currently manufactured and distributed to multiple Air Force Base locations: 6 units to Elmendorf AFB (AK), 6 to Langley AFB (VA), 3 to Hickam AFB (HI), 2 to Edwards AFB (CA), 1 to Nellis AFB (NV), and 1 to Hill AFB (UT), with an initial delivery requirement of 45 days or less from contract award.

View the file

Other files

File Type Posted
COMBO - FA820525QB003.pdf PDF
Attachment 2 - Quote Sheet FA820525QB003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

PURCHASE DESCRIPTION (PD)

Multiband Inter/Intra Team Radio (MBITR) Desktop Charger for the Battlefield Awareness Tactical System – Dismounted (BATS-D) Handheld Radio

For

F-22 Support Equipment Program Office (WAUS)

DATED

28 March 2025

1. DESCRIPTION OF SERVICES / SCOPE

The Multiband Inter/Intra Team Radio (MBITR) radio charger, AN/PRC-148 will allow for desktop charging of the AN/PRC-161 Battlefield Awareness Tactical System – Dismounted (BATS-D) Handheld Radio.

2. SPECIFICATIONS AND REQUIRMENTS

Table 1

1. MBITR Desktop charger that will charge one (1) or two (2) AN/PRC-161 BATS-D handheld radios

2. Must be currently manufactured

3. Able to provide a quantity of 19ea

4. Able to ship to various AFB locations

5. Powered from 100-240V ac, 50/60Hz, 60W max

6. Powered from 10-32V dc, 60W max

7. Includes NA AC Power Cord

8. Charger: L-3.8 in W-5.5 in H-2.6 in

9. Power Supply: L-4.0 in W-2.6 in H-1.4 in

10. Cable: 72 in

11. Weight: 1.4 lbs

12. Operating Temp: -20 Deg C to +50 Deg C

13. Storage Temp: -40 Deg C to +70 Deg C

14. Material Color: High impact ABS/Black/NATO Green

3. QUANTITY

The contractor will need to be able to supply 19ea MBITR AN/PRC-148 desktop radio chargers.

4. SHIPPING/DELIVERY

The contractor must be able to ship each AN/PRC-148 MBITR Desktop Radio charger to any US military installation as outlined in Table 2. Upon contract award, the initial order of MBITR radio chargers will be delivered no later than 45 days.

The locations and quantity supplied:

Table 2

Elmendorf AFB, AK

DoDAAC (FB5000)

673 LRS LGRM

5257 Finletter Ave Elmendorf AFB, AK 99506-4406

POC: TSgt Amanda McCormick AFETS: Mr.

Tyler Bowman (SSgt Scott Trainer/TSgt Wade

Qty 6ea

Parker – while Amanda is out on Maternity leave).

Langley AFB, VA

DoDAAC (FB4800)

633 LRS LGRDDC

23 Sweeney Blvd Bldg 330 Langley AFB, VA 23665-2107

POC: MSgt Joey Aronson, TSgt Maura Pagen, AFETS: Mr. Ed Pendleton/ Mr. Chris Akom

Qty 6ea

Hickam AFB, HI

DoDAAC (FB6530)

154 LRS

360 Mamala Bay Dr. Bldg 3415 Joint Base Pearl Harbor/Hickam, HI 96853-

POC: SMSgt Clarence Rivera / TSgt David Hancock

Qty 3ea

Edwards AFB, CA

DoDAAC (FB2805)

412 MSG LGR

120 North Rosamond Blvd Bldg 3735 Edwards CA 93524-8600

POC: TSgt Marcell Pemberton and TSgt Thomas Watt

Qty 2ea

Nellis AFB, NV

DoDAAC (FB4852)

99 LRS LGRDDC

6159 McGough Pkwy Bldg 811E Nellis AFB, NV 89191-7261

POC: Mr. Ryan Veith

Qty 1ea

Hill AFB, UT

DoDAAC (EB5116)

00-ALC, 574 AMXS, EB5116

5655 Foulois Rd., Bldg. 680 Hill AFB, UT 84056

Qty 1ea

POC: Randy Funk

5. BASIC DESIGN REQUIRMENTS

Contractor will provide a desktop charger that provide the forementioned requirements in Table 1

6. WARRANTY

If applicable, the contractor shall provide a standard manufacturer’s warranty which will be transferable to the government.

7. Inspect and Accept

Inspection and acceptance will be verified by the appointed official at the F-22 program office identified on the contract. The base receiving delivery will not be an official acceptor or inspector.

1. DESCRIPTION OF SERVICES / SCOPE
2. SPECIFICATIONS AND REQUIRMENTS
3. QUANTITY
4. SHIPPING/DELIVERY
5. BASIC DESIGN REQUIRMENTS
6. WARRANTY

File details come from the government source that posted it. Updated .