Attachment 1 - Project Location Map 2022 South Mineral.pdf

PDF 2 MB Posted

Attached to
GAOA South Mineral Creek Road Resurfacing
Solicitation number
1240LT22R0057
Issued by

About this file

This document provides details for a federal solicitation seeking proposals for resurfacing 4.4 miles of the South Mineral Road in the San Juan National Forest. The USDA Forest Service is soliciting proposals to reshape the roadbed, reestablish ditches, pull the road to a 22-foot width, and add a 4-inch layer of CDOT class 6 1-inch minus roadbase material across the 22-foot width. The work also includes cleaning lead-out ditches, cutting washboards, filling potholes, and covering large rocks. The road will remain open to traffic during the contract work, and traffic control will be required. Proposals are due by August 15, 2022. The contract is estimated between $500,000 to $1,000,000. Interested parties must register with the System for Award Management and monitor the site for any amendments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US-550816

.F

585.C

585.E

Copyright:© 2013 National Geographic Society, i-cubed

SAN JUAN NATIONAL FOREST - COLUMBINE RANGER DISTRICT

PROJECT LOCATION MAP - SOUTH MINERAL ROAD RESURFACING

³

LA PLATA

DOLORES

SAN MIGUEL

HINSDALE

MONTEZUMA

SAN JUAN

OURAY

ARCHULETA

Rico

MancosCortez

Dolores

Silverton

Telluride

GENERAL PROJECT LOCATION MAP

³

DETAILED PROJECT LOCATION MAP

LEGEND

ROADS

1 - BASIC CUSTODIAL CARE (CLOSED)

2 - HIGH CLEARANCE VEHICLES

3 - SUITABLE FOR PASSENGER CARS

4 - MODERATE DEGREE OF USER COMFORT

5 - HIGH DEGREE OF USER COMFORT

CL 1 - PRIMARY HIGHWAY

CL 2 - SECONDARY HIGHWAY

CL 3A - LIGHT DUTY PAVED ROAD

Do cu me nt

Pa th:

T:

\FS

\N

FS

\S an

Ju an

\Pr og ram \71

En gin ee rin g\G

IS\

cjo ne s\S ou th

Mi ne ral .m xd

0 0.6 1.20.3 Miles

Date: 1/26/2022

Disclaimer:

The USDA Forest Service makes no warenty, expressed or implied regarding the data displayed on this map and reserves the right to correct, update, modify or replace this information without notification.

Begin resurfacing at 0.00 at the US-550 Intersection

End resurfacing at 4.4 at the campground intersection

File details come from the government source that posted it. Updated .