Attachment-1 Pricing Schedule for ORCAS DD .xls

XLS spreadsheet 60 KB Posted

Attached to
DRY-DOCK USCGC ORCAS Federal contract opportunity
Solicitation number
70Z080-21-Q-P4503200
Issued by
Department of Homeland Security US Coast Guard

About this file

This document contains an attachment with a pricing schedule for the dry-docking of the USCGC ORCAS under Solicitation Number 70Z080-21-Q-P4503200 issued by the Department of Homeland Security US Coast Guard. The pricing schedule lists over 50 line items for work on the hull, tanks, appendages, propulsion system, electrical systems, and other areas of the cutter, though no unit prices are included. The opportunity description indicates the solicitation is for the combined dry-docking availability of the USCGC ORCAS scheduled for FY2021, with the pricing schedule outlining the various work items to be completed during the availability.

View the file

Other files for this federal contract opportunity

Other files attached to DRY-DOCK USCGC ORCAS, newest first.
File Type Posted
SF30 AMEND A00001 70Z080-21-Q-P4503200 USCGC ORCAS DD 30Sep20.pdf PDF
Attachment-2 Specification REV1 30Sep2020 CGC ORCAS DD.pdf PDF
Attachment-2 Specification Rev0 30Jun2020 ORCAS DD.pdf PDF
Solicitation for USCGC ORCAS Dry-dock FY21.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment-1 Pricing Schedule

ATTACHMENT-1 PRICING SCHEDULE FOR:
USCGC ORCAS (WPB-110B) DRYDOCK AVAILABILITY FY2021
AFCITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
45D-001Hull Plating (Side Scan), Ultrasonic TestingJOB1$0.00
45D-002Hull Plating (U/W Body), InspectJOB1$0.00
30D-003Hull Plating Freeboard, Preserve “100%”JOB1$0.00
45D-004Appendages (U/W), Leak TestJOB1$0.00
45O-005Appendages (U/W) - Internal, PreserveJOB1$0.00
45D-006Tanks (Mp Fuel Stowage And Overflow), Clean And InspectJOB1$0.00
45D-007Voids (Non-Accessible), Leak TestJOB1$0.00
45O-008Voids (Non-Accessible), Internal Surfaces, PreserveJOB1$0.00
45D-009Tanks (Mp Fuel Service), Clean And InspectJOB1$0.00
45D-010Tanks (Potable Water), Clean and InspectJOB1$0.00
45D-011Tanks (Dirty Oil and Waste), Clean and InspectJOB1$0.00
45O-012Forward Void, PreserveJOB1$0.00
45O-013Tanks (Dirty Oil), Preserve “100%”JOB1$0.00
45O-014Tank (Oily Water), Preserve “100%”JOB1$0.00
30D-015Main Mast, Preserve, 100%JOB1$0.00
45D-016Propulsion Shafting, Remove, Inspect, And ReinstallJOB1$0.00
45D-017Alignment Survey, ConductJOB1$0.00
45D-018Mechanical Shaft Seal Assemblies, OverhaulJOB1$0.00
45O-019Propulsion Shaft Bearings (External), RenewJOB1$0.00
45O-020Propulsion Shaft, Stern Tube Forward Bearing, RenewJOB1$0.00
45O-021Stern Tube Interior Surfaces, Preserve 100%JOB1$0.00
45D-022Propellers; Remove, Inspect, and ReinstallJOB1$0.00
45D-023Exhaust Piping System, InspectJOB1$0.00
45D-024Sw Heat Exchangers; Clean, Inspect And HydroJOB1$0.00
45D-025Fathometer Transducer, RenewJOB1$0.00
45D-026Speed Doppler, Remove, Inspect, and Reinstall - Doppler Valve, OverhaulJOB1$0.00
45D-027Sea Valves, Overhaul or RenewJOB1$0.00
45D-028Sea Strainers - (All Sizes), OverhaulJOB1$0.00
45D-029Steering Gear (General), OverhaulJOB1$0.00
45D-030Rudder Assembly, Remove, Inspect and ReinstallJOB1$0.00
45D-031Fin Stabilizers (General), OverhaulJOB1$0.00
45D-032Grey Water Holding Tank(s), Clean and InspectJOB1$0.00
45D-033Grey Water Piping, Clean And FlushJOB1$0.00
45D-034Sewage Piping, Clean And FlushJOB1$0.00
45O-035Tanks (Sewage Holding), Preserve “100%”JOB1$0.00
45O-036Tanks (Grey Water Holding), Preserve “100%”JOB1$0.00
45O-037Tanks (Potable Water), Preserve “100%”JOB1$0.00
30D-038Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System)JOB1$0.00
45D-039U/W Body, Preserve (“100%”) Used with Side Scan)JOB1$0.00
30D-040Superstructure, Preserve “100%”JOB1$0.00
45D-041Cathodic Protection System (Bilge and Sea Chest), RenewJOB1$0.00
45D-042Impressed Current Cathodic Protection System, Inspect and MaintainJOB1$0.00
45D-043DrydockJOB1$0.00
45D-044Temporary Services, Provide - CutterJOB1$0.00
45D-045Sea Trial Performance, Support, ProvideJOB1$0.00
45O-046Hull Plating (U/W Body), Ultrasonic TestingJOB1$0.00
45D-047Tanks, (Sewage Holding) Clean and InspectJOB1$0.00
45D-048Deck Covering, (Interior Wet/Dry), RenewJOB1$0.00
45D-049Fuel Oil Service Return Piping, Clean and InspectJOB1$0.00
D-00BGFP ReportNSPEA1NSP
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
45O-00AComposite Labor RateHour1
45O-00ZLaydaysDay1

&C(7/12/2019) Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate