Attachment 1 Pricimg Schedule for BISCAYNE BAY.xls
XLS spreadsheet 47 KB Posted
- Attached to
- CGC BISCAYNE BAY DOCKSIDE REPAIRS
- Solicitation number
- 70Z08526QIBCT0038
About this file
This is a pricing schedule template for dockside repair and maintenance services for the USCGC Biscayne Bay (WTGB-140) during FY2026. The schedule outlines 26 definite work items and associated labor categories with the Coast Guard's assumed factors for cost estimation. Work items include fire prevention requirements, tank cleaning and inspection (water mist, potable water, lube oil, ballast, dirty oil and waste), accessible void spaces cleaning, exhaust piping commercial cleaning for the main diesel engine and auxiliary equipment, vent duct cleaning for engine room and galley areas, compressed air system maintenance, deck equipment service and inspection (anchor windlass, capstans, davits, hull fittings), wastewater system cleaning and flushing, safety rail renewal, lube oil storage tank fabrication and installation, officer stateroom modifications, and composite labor services. The pricing template includes a 5-day laydays provision and accounts for travel and per diem costs.
The cost estimation breakdown assumes a composite labor rate of $55 per hour with a 15 percent G&A factor and 10 percent profit factor, with labor rate variations by geographic location ranging from $45 to $67 per hour across multiple U.S. port areas including Baltimore, Biloxi, Boston, Charleston, Corpus Christi, Hampton Roads, Honolulu, Houston, Los Angeles, Miami, and other coastal cities. The template accommodates multiple labor disciplines including engineering technicians, machinists/pipe fitters, electricians, shipfitters, welders, firewatchers, insulators/laggers, painters, and general laborers, as well as material and subcontract cost entries. Currently, all individual line item prices are listed at $0.00, indicating this is a blank pricing template requiring contractor completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Specification Biscayne Bay.pdf | ||
| S USCGC BISCAYNE BAY (DS) COMBNED SYNOPSIS SOLICITATION .docx | DOCX document | |
| Attachment 3 Past Performancefor Biscayne Bay - Copy.docx | DOCX document | |
| Attachment 4 Request for clarification.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BISCAYNE BAY (WTGB-140) DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements «TYPE» | NSP | NSP | 1 | NSP |
| D-002 | Tank (Water Mist), Clean And Inspect | JOB | 1 | $0.00 | |
| D-003 | Tanks, Potable Water, Clean and Inspect | JOB | 1 | $0.00 | |
| D-004 | Tanks, Lube Oil, Clean and Inspect | JOB | 1 | $0.00 | |
| D-005 | Tanks, Ballast, Clean and Inspect | JOB | 1 | $0.00 | |
| D-006 | Voids, Accessible, Clean and Inspect | JOB | 1 | $0.00 | |
| D-007 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | 1 | $0.00 | |
| D-008 | Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-009 | Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-010 | Boiler Exhaust Stack Uptakes, Commercial Clean | JOB | 1 | $0.00 | |
| D-011 | Bubbler Diesel Engine Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-012 | Vent Ducts, Engine And Motor Room, All, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-013 | Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-014 | Vent Ducts, All Other, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-015 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift | JOB | 1 | $0.00 | |
| D-016 | Anchor Windlass, Inspect and Service | JOB | 1 | $0.00 | |
| D-017 | Vertical Capstan, Inspect and Service | JOB | 1 | $0.00 | |
| D-018 | Hull Fittings (Mooring and Towing), Inspect and Test - Tender | JOB | 1 | $0.00 | |
| D-019 | Single Point Davit, Inspect and Service | JOB | 1 | $0.00 | |
| D-020 | Grey Water Holding Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-021 | Sewage Holding Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-022 | Grey Water Piping, Clean and Flush | JOB | 1 | $0.00 | |
| D-023 | Sewage Piping, Clean and Flush | JOB | 1 | $0.00 | |
| D-024 | Safety Rail Stanchion Renew | JOB | 1 | $0.00 | |
| D-025 | Lube Oil Storage Tank, Fabricate and Install | JOB | 1 | $0.00 | |
| D-026 | Officer Stateroom, Modifications | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 150 | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | 1 | ||
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(11/28/2025) Rev-1 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .