Attachment 1 Pricebook Tanks.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- W912CM-21-Q-0014
About this file
This document contains a contractor price book and related federal contract opportunity for maintenance and repair of liquid storage tanks in Germany. The solicitation is for a non-personal services contract to provide maintenance, repair, TUEV technical inspections and certification for aboveground and underground liquid storage tanks and fuel pumps at locations within the USAG Wiesbaden area. The price book outlines recurring and non-recurring pricing for scheduled preventative maintenance and on-call repairs for various tank types and capacities, fuel pumps, and filling areas. Option years and locations for additional required work are also included. The contracting agency is the Department of the Army Materiel Command Army Contracting Command. The response deadline and award date are not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 QASP Tanks.doc | DOC document | |
| Attachment 4 - Reference Information Sheet.pdf | ||
| W912CM21Q0014.docx | DOCX document | |
| Attachment 2 Inventory List Tanks.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary INSTRUCTIONS: Offerors must fill in the yellow-highlighted cells on each worksheet. All other cells will be automatically calculated. See paragraph 5.5.1 of "ADDENDUM TO FAR 52.212-1" for full instructions.
| Maintenance and Repair Aboveground and Underground Tanks and Fuel Pumps | ||
| Fiscal | ||
| Year | Option | Period |
of Performance Total price per year (12 month) € Total price per year (12 month)
| $ | 0.8978 | ||||
| FY 21 | Base Year | 12 Months | € 11,025.00 | $ 12,280.02 | |
| FY 22 | OY 1 | Base Plus 12 Months | € 11,575.00 | $ 12,892.63 | |
| FY 23 | OY 2 | Option 1 Plus 12 Months | € 12,155.00 | $ 13,538.65 |
| Total | € 34,755.00 | $ 38,711.29 |
| Please note that if the option for an additional 6 months, as outlined FAR 52.217-8 is exercised, the Government may require continued performance of any services within the limits and at the rates specified in the contract. |
PB_SUM_Cranes_FY21 to FY25 Contractor Price Book Cranes 9/23/2020
Price Book A Base Year
| W912CM-21-X-XXXX | |
| Location: USAG Wiesbaden | Contractor |
| Base Period | Price Book |
| 0.8978 | |||||||
| CLIN | Unit of | Unit Price | Amount Euro | Amount $ | |||
| CLIN | ELIN | Description | Qty | Issue | Euro | ||
| 0001 | Scheduled Preventive Maintenance |
FFP
| The contractor shall provide non-personal scheduled maintenance and repair services, including technical inspections (TUEV), to underground (UST), aboveground (AST) liquid storage tanks, fuel pumps and filling areas within the USAG Wiesbaden Area as listed in Technical Exhibit (TE) A. The contractor shall perform services in accordance with (IAW) the Performance Work Statement (PWS). | 1 | Job | € - 0 | € - 0 | $0.00 |
| 0002 | On-Call Repairs |
T&M The contractor shall provide non-personal on-call repair services for
| underground and above-ground tanks IAW the PWS. | 1 | Job | € 11,025.00 | € 11,025.00 | $12,280.02 |
| E0001 | On-Call Repairs Tanks (Regular Labor Hours/Rate ) |
T&M The contractor shall provide non-personal on-call repair services for
| underground and above-ground tanks IAW the PWS. | 280 | Hours | € - 0 | € - 0 |
| E0002 | On-Call Repairs Fuel Pumps (Regular Labor Hours/Rate ) |
T&M The contractor shall provide non-personal on-call repair services for
| underground and above-ground tanks IAW the PWS. | 120 | Hours | € - 0 | € - 0 | ||
| E0003 | Materials | |||||
| Material and Repair Parts T&M Scheduled maintenance and routine service calls shall include material up to 50.00 Euro in the fixed price and will be not been compensated separately. | 1 | Job | € 11,025.00 | € 11,025.00 | ||
| Total Clin | 11,025.00 € | $12,280.02 |
PB_1_Cranes_FY21
| Base Year | Contractor Price Book |
| Cranes | 9/23/2020 |
Price Book Part B PM Base Year W912CM-21-Q-0014 - M/R and TUEV Inspections of AST/UST Liquid Storage Tanks
Maintenance & TUEV Inspection Price Book 1 - Base Year, FY 21 Sep. 2021 - Sep. 2022
| CLIN 0001 | Location | Bldg. # | Contents | Capacity | AST/ UST | as per Paragraph of the PWS | Unit | Unit Price EUR | |
| CLIN 0001 | Heating Oil | ||||||||
| Clay | 1507-1 | Heating Oil | 4,600 | AST | 5.2.1- 5.2.5 | EA | |||
| Clay | 1507-2 | Heating Oil | 5,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Clay | 3500-1 | Heating Oil | 5000 | UST | 5.2.1- 5.2.5 | EA | |||
| Clay | 3500-4 | Heating Oil | 3500 | UST | 5.2.1- 5.2.5 | EA | |||
| Kastel Storage | 4209-1 | Heating Oil | 32,400 | AST | 5.2.1- 5.2.5 | EA | |||
| Golf Course | 5119-1 | Heating Oil | 7000 | UST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 6291-3 | Heating Oil | 30,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 6264-01 | Heating Oil | 50,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 6264-02 | Heating Oil | 50,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Diesel | |||||||||
| Kastel Storage | 4009-2 | Diesel | 5,700 | AST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 6294-2 | Diesel | 100,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 6294-3 | Diesel | 100,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Hainerberg Shopping | 7850-1 | Diesel | 4,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Hainerberg Shopping | 7850-2 | Diesel | 2,000 | UST | 5.2.1- 5.2.5 | EA | |||
| HHA | 7883-4 | Diesel | 50,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Gasoline | |||||||||
| HHA | 7883-1 | Gasoline | 40,000 | UST | 5.2.1- 5.2.5 | EA | |||
| HHA | 7883-2 | Gasoline | 40,000 | UST | 5.2.1- 5.2.5 | EA | |||
| HHA | 7883-3 | Gasoline | 40,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Waste Oil | |||||||||
| Clay | 1218-1 | Waste Oil | 3,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Clay | 1223-1 | Waste Oil | 3,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Clay | 1224-1 | Waste Oil | 10,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Clay | 1224-2 | Waste Oil | 10,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Clay | 3500-2 | Waste Oil | 3,500 | UST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 6291-2 | Waste Oil | 3,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 6295-4 | Waste Oil | 3,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 6295-5 | Waste Oil | 5,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 7200-1 | Waste Oil | 10,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 7200-2 | Waste Oil | 5,000 | UST | 5.2.1- 5.2.5 | EA | |||
| KHA | 7539-2 | Waste Oil | 3,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Antifreeze | |||||||||
| Clay | 1223-3 | Antifreeze | 1,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Clay | 3500-3 | Antifreeze | 3500 | UST | 5.2.1- 5.2.5 | EA | |||
| Mc Cully | 6295-2 | Antifreeze | 5,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Kastel HA | 7539-1 | Antifreeze | 1,000 | UST | 5.2.1- 5.2.5 | EA | |||
| Deicing material | |||||||||
| Clay | 1364 | Deicing material | 40,000 | AST | 5.2.1- 5.2.5 | EA | |||
| Clay | 1365 | Deicing material | 40,000 | AST | 5.2.1- 5.2.5 | EA | |||
| Clay | 1366 | Salt | 80m2 | AST | 5.2.1- 5.2.5 | EA | |||
| Propan | |||||||||
| Rheinblick Golf Course | 5136-3 | Propan | 6,400 | AST | 5.2.1- 5.2.5 | EA | |||
| Filling Areas | |||||||||
| Hainerberg Housing Area PX (DOL) | 7883 | Filling Area | 200m2 | 5.2.4 | EA | ||||
| Golf Course | 5136 | Filling Area | 48m2 | 5.2.4 | EA | ||||
| McCully | 6294 | Filling Area | 180m2 | 5.2.4 | EA | ||||
| Clay | 1000 | Filling Area | 22m2 | 5.2.4 | EA | ||||
| Fuel Pumps | |||||||||
| Rheinblick Golf | |||||||||
| Course | 5135 | Fuel Pump (Fuel Dispenser) | |||||||
| 'MOGAS' | 2 MOGAS | Tokheim | 5.2.6 | EA | |||||
| Rheinblick Golf | |||||||||
| Course | 5135 | Fuel Pump (Fuel Dispenser) 'Diesel' | 2 Diesel | Salzkotten GmbH | 5.2.6 | EA | |||
| McCully |
Wackernheim
| 6294 | Fuel Pump (Fuel Dispenser) 'Diesel' | 3 Diesel LKW 1 Diesel PKW | Tokheim | 5.2.6 | EA | |||
| McCully | ||||||||
| Wackernheim | 6294 | Fuel Pump (Fuel Dispenser) 'Diese'l | 3 Diesel LKW 2 Diesel PKW | Tokheim | 5.2.6 | EA | ||
| Total | 0.00 € |
Price Book A Opt Year 1
| W912CM-21-X-XXXX | |
| Location: USAG Wiesbaden | Contractor |
| Base Period | Price Book |
| 0.8978 | |||||||
| CLIN | Unit of | Unit Price | Amount Euro | Amount $ | |||
| CLIN | ELIN | Description | Qty | Issue | Euro | ||
| 1001 | Scheduled Preventive Maintenance |
FFP
| The contractor shall provide non-personal scheduled maintenance and repair services, including technical inspections (TUEV), to underground (UST), aboveground (AST) liquid storage tanks, fuel pumps and filling areas within the USAG Wiesbaden Area as listed in Technical Exhibit (TE) A. The contractor shall perform services in accordance with (IAW) the Performance Work Statement (PWS). | 1 | Job | € - 0 | € - 0 | $0.00 |
| 1002 | On-Call Repairs |
T&M The contractor shall provide non-personal on-call repair services for
| underground and above-ground tanks IAW the PWS. | 1 | Job | € 11,575.00 | € 11,575.00 | $12,892.63 |
| E1001 | On-Call Repairs Tanks (Regular Labor Hours/Rate ) |
T&M The contractor shall provide non-personal on-call repair services for
| underground and above-ground tanks IAW the PWS. | 280 | Hours | € - 0 | € - 0 |
| E1002 | On-Call Repairs Fuel Pumps (Regular Labor Hours/Rate ) |
T&M The contractor shall provide non-personal on-call repair services for
| underground and above-ground tanks IAW the PWS. | 120 | Hours | € - 0 | € - 0 | ||
| E1003 | Materials | |||||
| Material and Repair Parts T&M Scheduled maintenance and routine service calls shall include material up to 50.00 Euro in the fixed price and will be not been compensated separately. | 1 | Job | € 11,575.00 | € 11,575.00 | ||
| Total Clin | 11,575.00 € | $12,892.63 |
PB_1_Cranes_FY21
| Base Year | Contractor Price Book |
| Cranes | 9/23/2020 |
Price Book Part B PM Opt Year 1 W912CM-21-Q-0014 - M/R and TUEV Inspections of AST/UST Liquid Storage Tanks
Maintenance & TUEV Inspection Price Book 1 - 1st Option Year, FY 22 Sep. 2022 - Sep. 2023
| CLIN 1001 | Location | Bldg. # | Contents | Capacity | AST/ UST | as per Paragraph of the PWS | Unit | Unit Price EUR |
| CLIN 1001 | Heating Oil |
| Diesel | ||||||
| Clay | 1000-1 | Diesel | 25,000 | UST | 5.2.1- 5.2.5 | EA |
| Clay | 1000-2 | Diesel | 25,000 | UST | 5.2.1- 5.2.5 | EA |
| Clay | 1000-3 | Diesel | 1,950 | AST | 5.2.1- 5.2.5 | EA |
| Clay | 1000-4 | Diesel | 1,950 | AST | 5.2.1- 5.2.5 | EA |
| Clay | 1000-5 | Diesel | 1,950 | AST | 5.2.1- 5.2.5 | EA |
| Clay | 1086-1 | Diesel | 5,000 | UST | 5.2.1- 5.2.5 | EA |
| Golf Course | 5136-2 | Diesel | 10,000 | AST | 5.2.1- 5.2.5 | EA |
| Amelia Earhart | 5301-4 | Diesel | 12,500 | AST | 5.2.1- 5.2.5 | EA |
| Gasoline | ||||||
| Kastel Storage | 4505-1 | Gasoline | 10,000 | UST | 5.2.1- 5.2.5 | EA |
| Kastel Storage | 4505-2 | Gasoline | 20,000 | UST | 5.2.1- 5.2.5 | EA |
| Kastel Storage | 4505-3 | Gasoline | 50,000 | UST | 5.2.1- 5.2.5 | EA |
| Golf Course | 5136-1 | Gasoline | 5,000 | UST | 5.2.1- 5.2.5 | EA |
| Waste Oil | ||||||
| Clay | 1066-1 | Waste Oil | 5,000 | UST | 5.2.1- 5.2.5 | EA |
| Antifreeze | ||||||
| Mc Cully | 6291-1 | Antifreeze | 1,000 | UST | 5.2.1- 5.2.5 | EA |
| Deicing material |
Propan
| Filling Areas | |||||
| Kastel Storage Station (AAFES) | 4505 | Filling Area | 150m2 | 5.2.4 | EA |
| Fuel Pumps |
Total 0.00 €
Price Book A Opt Year 2
| W912CM-21-X-XXXX | |
| Location: USAG Wiesbaden | Contractor |
| Base Period | Price Book |
| 0.8978 | |||||||
| CLIN | Unit of | Unit Price | Amount Euro | Amount $ | |||
| CLIN | ELIN | Description | Qty | Issue | Euro | ||
| 0001 | Scheduled Preventive Maintenance |
FFP
| The contractor shall provide non-personal scheduled maintenance and repair services, including technical inspections (TUEV), to underground (UST), aboveground (AST) liquid storage tanks, fuel pumps and filling areas within the USAG Wiesbaden Area as listed in Technical Exhibit (TE) A. The contractor shall perform services in accordance with (IAW) the Performance Work Statement (PWS). | 1 | Job | € - 0 | € - 0 | $0.00 |
| 2002 | On-Call Repairs |
T&M The contractor shall provide non-personal on-call repair services for
| underground and above-ground tanks IAW the PWS. | 1 | Job | € 12,155.00 | € 12,155.00 | $13,538.65 |
| E2001 | On-Call Repairs Tanks (Regular Labor Hours/Rate ) |
T&M The contractor shall provide non-personal on-call repair services for
| underground and above-ground tanks IAW the PWS. | 280 | Hours | € - 0 | € - 0 |
| E2002 | On-Call Repairs Fuel Pumps (Regular Labor Hours/Rate ) |
T&M The contractor shall provide non-personal on-call repair services for
| underground and above-ground tanks IAW the PWS. | 120 | Hours | € - 0 | € - 0 | ||
| E2003 | Materials | |||||
| Material and Repair Parts T&M Scheduled maintenance and routine service calls shall include material up to 50.00 Euro in the fixed price and will be not been compensated separately. | 1 | Job | € 12,155.00 | € 12,155.00 | ||
| Total Clin | 12,155.00 € | $13,538.65 |
PB_1_Cranes_FY21
| Base Year | Contractor Price Book |
| Cranes | 9/23/2020 |
Price Book Part B PM Opt Year 2 W912CM-21-Q-0014 - M/R and TUEV Inspections of AST/UST Liquid Storage Tanks
Maintenance & TUEV Inspection Price Book 1 - 2nd Option Year, FY 23 Sep. 2023 - Sep. 2024
| CLIN 2001 | Location | Bldg. # | Contents | Capacity | AST/ UST | as per Paragraph of the PWS | Unit | Unit Price EUR |
| CLIN 2001 | Heating Oil | |||||||
| Clay | 1072-1 | Heating Oil | 5,000 | UST | 5.2.1- 5.2.5 | EA | ||
| Clay | 1500-2 | Heating Oil | 30,000 | UST | 5.2.1- 5.2.5 | EA | ||
| Kastel Storage | 4506-1 | Heating Oil | 50,000 | AST | 5.2.1- 5.2.5 | EA | ||
| Kastel Storage | 4506-2 | Heating Oil | 50,000 | AST | 5.2.1- 5.2.5 | EA | ||
| Diesel | ||||||||
| Mc Cully | 6294-4 | Diesel | 100,000 | UST | 5.2.1- 5.2.5 | EA | ||
| Gasoline |
| Waste Oil | ||||||
| Clay | 1004-6 | Waste Oil | 5,000 | UST | 5.2.1- 5.2.5 | EA |
| Clay | 1211-4 | Waste Oil | 3,000 | UST | 5.2.1- 5.2.5 | EA |
| Antifreeze |
Deicing material
Propan
| Filling Areas | |||||
| Clay | 1219 | Filling Area | 170m2 | 5.2.4 | EA |
| Fuel Pumps |
Total 0.00 €
File details come from the government source that posted it. Updated .