OVERHAUL OF 140’ WTGB PROPULSION GENERATOR STATOR
Solicitation number
70Z08524QIBCT0025
Issued by

About this file

This document appears to be an attachment for a federal contract opportunity solicitation. It contains a price schedule for the overhaul of a 140' WTGB propulsion generator stator.

The solicitation, numbered 70Z08524QIBCT0025, is for the overhaul of a 140' WTGB U.S. Coast Guard vessel main propulsion generator stator. The contractor will be required to furnish all necessary labor, materials, services, equipment, supplies, power, accessories, and special tools to perform the factory overhaul. The price schedule includes cost information for various contract line items (CLINs) such as incoming mechanical/electrical inspection, rewiring of the main field poles and interpoles, and shipping. The total cost for the repair materials, labor, and other costs is $0.00.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGCE SAP

TITLEWTGB-140 Stator Overhaul
ITEMSTATOR ASSY MAIN MOTOR
NSN6105-01-309-3793
MATERIALSQNTYU/ICOST/UNITTOTAL
1CLIN 0002 MAIN FIELD POLE REWIRE1EA
2CLIN 0003 INTERPOLE REWIRE1EA
TOTAL MATERIALS COST$0.00
LABOR COSTHRSCOST/HRTOTAL
1CLIN 0001 INCOMING MECH/ELEC$0.00
2INSPECTION. ENGINEERING INPECTION$0.00
3REPORT. WASH, BAKE VARNISH STATOR$0.00
4QC INSPECTION.$0.00
5PACKAGE AND PREP FOR SHIPMENT$0.00
6$0.00
7CLIN 0002 MAIN FIELD POLE REWIRE (DEF)$0.00
8$0.00
9CLIN 0003 INTERPOLE REWIRE (OPT)$0.00
10$0.00
11CLIN 0004 SHIPPING COST$0.00
12$0.00
TOTAL LABOR COST$0.00

TOTAL COST OF REPAIR MATERIALS + LABOR $0.00

COST OPEN & INSPECTION, PACK AND PREP FOR SHIPMENT, & TRANSPORTATION $0.00

TOTAL COST $0.00