Attachment_1_Price_Book.xls
XLS spreadsheet 56 KB Posted
- Solicitation number
- W912CM-20-Q-0008
About this file
This document contains a price book and attachments for a solicitation seeking maintenance and repair services for emergency power systems and uninterruptible power systems at United States Army Garrison Wiesbaden in Germany. The hybrid firm-fixed-price and time-and-materials non-personal services contract has a five-year ordering period including a phase-in period beginning 30 September 2020. The price book contains unit pricing templates for offerors to complete for preventative maintenance and on-call labor and material costs for repairs over the five one-year ordering periods. The related solicitation provides additional details on the requirements, including the performance work statement, deliverables schedule, and performance standards. The Regional Contracting Office Wiesbaden is seeking competitive quotes that are due in response to solicitation number W912CM-20-Q-0008.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CM-20-Q-0008 RFQ of Amendment 0003.pdf | ||
| Amendment 0003 01Sep20.pdf | ||
| (27Aug20) Amendment 0002.pdf | ||
| WE912CM-20-Q-0008 Conformed RFQ Amendment 0002 27Aug20.pdf | ||
| W912CM20Q0008_Conformed_RFQ_Amendment0001_20Aug20.pdf | ||
| Attachment_1_Price_Book_AMENDMENT0001_20Aug20.xls | XLS spreadsheet | |
| W912CM20Q0008_Amendment0001_20Aug20.pdf | ||
| Attachment 2 Energy Security Plan AECOM.pdf | ||
| Attachment 5 Inventory List UPS.xlsx | XLSX spreadsheet | |
| Attachment 4 Inventory List EPS.xlsx | XLSX spreadsheet | |
| Attachment 3 Sample labeling.jpg | JPG image | |
| W912CM20Q0008.pdf | ||
| Attachment 6 Individual Reference Information Sheet.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ordering Period 1 Instructions: Fill in the yellow "Unit Price Euro" column for each CLIN, all other amounts will be automatically calculated.
For On-Call Labor (T&M), fill in the proposed labor rate and it will be automatically multiplied by the estimated number of On-Call Labor Hours, which has been pre-filled by the Government.
Offerors are not required to propose an amount for On-Call Material/Spares (T&M), the estimated amount has been pre-filled by the Government.
| ORDERING PERIOD 1 | ||||||
| CLIN | SLIN | DESCRIPTION | Unit | Unit Price Euro | Units Each | Total Cost Euro |
| 0001 | Phase -In Period (FFP) | Job | € - 0 | 1 | € - 0 | |
| 1001 | Preventantive Maintenance on EPS/UPS (FFP) | Months | € - 0 | 12 | € - 0 | |
| 1002 | On-Call Repairs - Labor and Materials (T&M) | |||||
| 01 | Labor | Hours | € - 0 | 900 | € - 0 | |
| 02 | Material/Spares | Lot | N/A | € 140,000.00 | € 140,000.00 | |
| TOTAL CLIN 1002 | € 140,000.00 | |||||
| Total Base Period | € 140,000.00 | |||||
| Summary of Base and All Option Years (Automatically Calculates) | ||||||
| Total 1st Ordering Period (includes Phase-In) | € 140,000.00 | |||||
| Total 2nd Ordering Period | € 140,000.00 | |||||
| Total 3rd Ordering Period | € 148,400.00 | |||||
| Total 4th Ordering Period | € 152,600.00 | |||||
| Total 5th Ordering Period | € 156,860.00 | |||||
| GRAND TOTAL (All Ordering Periods) | € 737,860.00 |
&C&"Arial,Bold"W912CM-20-Q-0008&R&"Arial,Bold"Attachment 1 - Pricebook
Ordering Period 2 Instructions: Fill in the yellow "Unit Price Euro" column for each CLIN, all other amounts will be automatically calculated.
For On-Call Labor (T&M), fill in the proposed labor rate and it will be automatically multiplied by the estimated number of On-Call Labor Hours, which has been pre-filled by the Government.
Offerors are not required to propose an amount for On-Call Material/Spares (T&M), the estimated amount has been pre-filled by the Government.
| ORDERING PERIOD 2 | ||||||
| CLIN | SLIN | DESCRIPTION | Unit | Unit Price Euro | Units Each | Total Cost Euro |
| 2001 | Preventantive Maintenance on EPS/UPS (FFP) | Months | € - 0 | 12 | € - 0 | |
| 2002 | On-Call Repairs - Labor and Materials (T&M) | |||||
| 01 | Labor | Hours | € - 0 | 900 | € - 0 | |
| 02 | Material/Spares | Lot | N/A | € 140,000.00 | € 140,000.00 | |
| TOTAL CLIN 2002 | € 140,000.00 | |||||
| Total 2nd Ordering Period | € 140,000.00 |
&L&"-,Bold"&12Contractor Price Book-Emergency-Generators-FY 18&C&"-,Bold"&20USAG Wiesbaden&"-,Regular"&11 &12Emergency Generators-Shali Center, #01000, Clay Kaserne&R&"-,Bold"&14Attachment 6
Ordering Period 3 Instructions: Fill in the yellow "Unit Price Euro" column for each CLIN, all other amounts will be automatically calculated.
For On-Call Labor (T&M), fill in the proposed labor rate and it will be automatically multiplied by the estimated number of On-Call Labor Hours, which has been pre-filled by the Government.
Offerors are not required to propose an amount for On-Call Material/Spares (T&M), the estimated amount has been pre-filled by the Government.
| ORDERING PERIOD 3 | ||||||
| CLIN | SLIN | DESCRIPTION | Unit | Unit Price Euro | Units Each | Total Cost Euro |
| 3001 | Preventantive Maintenance on EPS/UPS (FFP) | Months | € - 0 | 12 | € - 0 | |
| 3002 | On-Call Repairs - Labor and Materials (T&M) | |||||
| 01 | Labor | Hours | € - 0 | 900 | € - 0 | |
| 02 | Material/Spares | Lot | N/A | € 148,400.00 | € 148,400.00 | |
| TOTAL CLIN 3002 | € 148,400.00 | |||||
| Total 3rd Ordering Period | € 148,400.00 |
&L&"-,Bold"&12Contractor Price Book-Emergency-Generators-FY 18&C&"-,Bold"&20USAG Wiesbaden&"-,Regular"&11 &12Emergency Generators-Shali Center, #01000, Clay Kaserne&R&"-,Bold"&14Attachment 6
Ordering Period 4 Instructions: Fill in the yellow "Unit Price Euro" column for each CLIN, all other amounts will be automatically calculated.
For On-Call Labor (T&M), fill in the proposed labor rate and it will be automatically multiplied by the estimated number of On-Call Labor Hours, which has been pre-filled by the Government.
Offerors are not required to propose an amount for On-Call Material/Spares (T&M), the estimated amount has been pre-filled by the Government.
| ORDERING PERIOD 4 | ||||||
| CLIN | SLIN | DESCRIPTION | Unit | Unit Price Euro | Units Each | Total Cost Euro |
| 4001 | Preventantive Maintenance on EPS/UPS (FFP) | Months | € - 0 | 12 | € - 0 | |
| 4002 | On-Call Repairs - Labor and Materials (T&M) | |||||
| 01 | Labor | Hours | € - 0 | 900 | € - 0 | |
| 02 | Material/Spares | Lot | N/A | € 152,600.00 | € 152,600.00 | |
| TOTAL CLIN 4002 | € 152,600.00 | |||||
| Total 4th Ordering Period | € 152,600.00 |
&L&"-,Bold"&12Contractor Price Book-Emergency-Generators-FY 18&C&"-,Bold"&20USAG Wiesbaden&"-,Regular"&11 &12Emergency Generators-Shali Center, #01000, Clay Kaserne&R&"-,Bold"&14Attachment 6
Ordering Period 5 Instructions: Fill in the yellow "Unit Price Euro" column for each CLIN, all other amounts will be automatically calculated.
For On-Call Labor (T&M), fill in the proposed labor rate and it will be automatically multiplied by the estimated number of On-Call Labor Hours, which has been pre-filled by the Government.
Offerors are not required to propose an amount for On-Call Material/Spares (T&M), the estimated amount has been pre-filled by the Government.
| ORDERING PERIOD 5 | ||||||
| CLIN | SLIN | DESCRIPTION | Unit | Unit Price Euro | Units Each | Total Cost Euro |
| 5001 | Preventantive Maintenance on EPS/UPS (FFP) | Months | € - 0 | 12 | € - 0 | |
| 5002 | On-Call Repairs - Labor and Materials (T&M) | |||||
| 01 | Labor | Hours | € - 0 | 900 | € - 0 | |
| 02 | Material/Spares | Lot | N/A | € 156,860.00 | € 156,860.00 | |
| TOTAL CLIN 5002 | € 156,860.00 | |||||
| Total 5th Ordering Period | € 156,860.00 |