This document is a Performance Work Statement (PWS) for a federal contract opportunity issued by the U.S. Fish and Wildlife Service (FWS) to plant 100,485 bottomland hardwood tree seedlings across 231 acres of the Bayou Sauvage Urban National Wildlife Refuge in New Orleans, Louisiana.
The PWS details the required scope of work, including species composition, planting density, and timing, as well as contractor qualifications and performance guarantees. It is part of a larger Request for Quotes (RFQ) Solicitation 140FS324Q0204, which is a 100% small business set-aside with a NAICS code of 115310 and a $11.5 million size standard. The period of performance is from December 15, 2024 to March 15, 2025. Award will be made as a firm-fixed-price contract using a tradeoff source selection method considering price, technical, and past experience factors. Key submission deadlines include a site visit on September 9, 2024, question submissions by September 11, 2024, and quote submissions by September 13, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1-_Performance_Work_Statement__rev1_0001.pdf | ||
| Sol_140FS324Q0204_Amd_0001.pdf | ||
| Sol_140FS324Q0204.pdf | ||
| Attachment_3-_SCA_Wage_Determination.pdf | ||
| Attachment_4-_Past_Performance_Data_Document.docx | DOCX document | |
| Attachment_2-Quote_Schedule.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bayou Sauvage Urban National Wildlife Refuge
Tree Planting Performance Work Statement for portions of Units 1, 2 and 3
Scope of Work
Tree seedling planting
This project is located on Bayou Sauvage Urban National Wildlife Refuge (Refuge) to improve forest habitat conditions. The project site is further defined as the Little Pine
Island Tract. Past management, prior to the establishment of the refuge, increased the prevalence of invasive exotic species and did not facilitate the development or maintenance of native bottomland hardwoods. In accordance with the Comprehensive
Conservation Plan (CCP) and Habitat Management Plan (HMP), Lower Mississippi
River Valley Inflation Reduction Act Nature-based Solutions Project funding, forest habitat management will concentrate on restoring and developing and maintaining a diverse bottomland forest structure. The prescribed management action is to plant native bottomland hardwood trees with a predominance of site-specific oaks and baldcypress to promote the development of the planted seedlings and provide a greater range of forest structure. The planting will occur after the area has been treated under a separate contract to kill invasive exotic Chinaberry and Chinese tallow trees.
Description and Location:
All areas are located within the city limits of New Orleans located in New Orleans East, within the boundaries of Bayou Sauvage Urban National Wildlife Refuge. All areas to be treated are located within the Hurricane Protection Levee System. Refer to the attached maps for specific stand locations and individual acreages. Each unit is accessible via state highways or city roads.
The contract areas consist of acreage to restore habitat following previously applied herbicide and/or mastication. This contract shall consist of planting bottomland hardwood trees described hereunder on a total of 231 acres of tree planting.
From December 15, 2024 through March 15, 2005, 231 acres will be hand-planted with
100,485 native bare root bottomland hardwood tree mix as described below.
Parameters
The Contractor must give the Government Representative (GR) notice three days before any day in which work will be done. The Contractor must meet with the GR on-site before any work is begun. Work will be allowed all days through the project time frame including Federal Holidays; however, work must be accomplished during favorable weather conditions.
The contractor shall require all personnel to practice proper sanitation procedures for all equipment (including personal protective gear) to avoid unnecessary spreading of invasive and exotic pest plant species within and from the treatment sites.
Contractor must successfully complete planting no less than 25 acres per day and no less than 75 acres per week. Allowances for wet or otherwise undesirable weather conditions may be granted by the Technical Point of Contact.
All tree seedlings planted must come from nursery stock from the same climate zone and be grown from States of Louisiana, Arkansas, Mississippi, or Alabama.
All trees planted will be bare root and either grown in the nursery for either one or two years, but no longer.
All tree seedlings will be protected from the dangerous climactic elements until planted and must either be planted on the site from within one week delivery from nursery harvest or be kept in a refrigerated enclosure at safe temperature and humidity conditions
(34-38° Fahrenheit and relative humidity of 85-95%), also called cold storage. Roots must also be kept moist to protect the tree’s roots from being damaged, dried, or from other factors that would prevent good growth after planting. Only trees allowed to be removed from cold storage may remain in the field for each day’s planting. All other seedlings ready for planting and all seedlings at the end of each day’s planting must be returned to cold storage until the next day’s planting.
Contractor will guarantee at least 80% survival of planted seedlings within one year of planting, barring an Act of God, or the contractor will be required to replant the area with like species of seedlings at no additional cost to the government.
No trash or debris shall be left or allowed to remain on government land.
Payment
Payment will be disbursed upon completion of work to the satisfaction of the GR per planting unit, per acre. Invoices for each unit may be submitted upon completion of the whole unit or on a per acre basis in the event that acres within a unit are unable to be planted due to environmental conditions (i.e.: water levels or soil type).
The GR may remove acres to be planted from a unit based on environmental conditions that will not allow for certain acres to be successfully planted.
The GR will make regular inspections and conduct random sampling to survey completed work according to the Quality Assurance Surveillance Plan (QASP). Areas not meeting the Acceptable Quality Levels (AQL) will be retreated by the Contractor to meet the
AQL. The Contractor will be paid according to the contracted amount for acres successfully treated for each planting unit.
Description of planting units and methods
Areas to be planted during the winter of 2024/2025 are on attached maps. All tree seedlings and cold storage equipment must be supplied by the contractor.
The supplies and services rendered to the government shall be:
1. Furnish all labor, materials, supervision, transportation, equipment, and supplies needed to perform all work necessary to complete planting of
100,485 bottomland hardwood tree seedlings in the below amounts on 231 acres as shown in Figure 1:
16,485 Nuttall oak (Quercus nuttallii/texana) 14,000 Water oak (Quercus nigra) 14,000 Overcup oak (Quercus lyrata) 12,000 Bitter pecan (Carya aquatica) 12,000 Bald cypress (Taxodium distichum) 12,000 American sycamore (Platanus occidentalis) 10,000 swamp red maple (Acer rubrum var. drummondii) 10,000 Sugarberry (Celtis laevigata)
The planting shall be executed from December 15, 2024 through March 15, 2025 and are in Units 1, 2, and 3 identified as in Figures 1-4. These three units are 28 (Figure 2), 95 (Figure 3), and 108 (Figure 4) acre planting units.
All trees planted in these three units at 10’ x 10” spacing and 435 trees per acre.
The GR has the option to approve the prescribed number and species of tree species seedlings with alternate tree species if the prescribed number of seedings above is unavailable. The vendor may substitute tree species and quantity if approved by GR, but the contractor shall supply a minimum of
75% of all tree species above.
Georeferenced PDFs and shapefiles of the unit maps will be provided to the awarded contractor.
Refuge staff will designate tracts and locations of each planting mix of species.
Lower site species such as baldcypress, bitter pecan, and overcup oaks will be planted at lower elevations, while Nuttall oaks, sycamore, and red maple are planted in mid elevations, and water oaks, willow oaks, and sugarberry must be planted at higher elevations. Lower site elevation species may be planted at higher elevations, but higher elevation designated tree species may not be planted at lower elevations unless specified otherwise by the GR.
Figure 1: Tree seedling planting units.
Figure 2: Tree planting Unit 1
Figure 3: Tree planting Unit 2
Figure 4: Tree planting Unit 3