Attachment 1 - Performance Work Statement Wifi BPA.docx
DOCX document 25 KB Posted
- Attached to
- Peterson SFB Wifi Services
- Solicitation number
- FA251724Q0093
About this file
This document is a Performance Work Statement (PWS) that establishes Blanket Purchase Agreements (BPAs) for commercial internet and WiFi services at Peterson SFB, CO. The key requirements include providing a range of commercial internet speeds from 1MB to 1GB, with tiered WiFi services. The contractor must respond within 4 hours to service outages, coordinate with the base's Civil Engineering Squadron for any installation requiring modifications, and adhere to security policies and safety standards. The related federal contract opportunity is a notice of intent to establish the BPAs, with potential vendors required to confirm their capabilities, provide pricing for each tier of service, and comply with the terms and conditions in the solicitation attachments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
REQUIREMENTS FOR PETERSON SFB, CO
COMMERCIAL INTERNET WIFI SERVICES,
Revised 5 August 2024
1. Summary The purpose of this Performance Work Statement (PWS) is to establish one or more Blanket Purchase Agreements (BPA) for commercial internet wifi services. Packages are to be based upon the user requirements.
1.1 Purpose
This document defines the requirement that the vendor must have the technical ability to provide commercial internet and wifi services, to include maintenance, troubleshooting, installation, responsiveness and proper clear understandable billing documentation and operation of services ordered.
1.2 Requirement/Description of Services
All available commercial internet network speed (e.g. 10MB, 100MB, 500MBG, 1GB) prices should be provided, no less than 1MB, with tiered services for wifi. Government Fiber could be leased to extend service to user location.
The contractor shall respond to commercial internet/wifi locate requests, cable cuts, or service outages when notified by 21 CS/SCOIB (Voice Network System) Peterson SFB. The contractor shall provide service desk contact information to 21 CS/SCOIB via email pete.tele.reqs@us.af.mil and the Contracting Officer. A signed Authorization to Operate (ATO) will need to be filed with 21 CS/(shop) prior to installation of new commercial internet. The contractor is required to respond within four (4) hours, Monday-Friday, once notified of an out-of-service condition and make the necessary repairs.
The contractor is required to coordinate with 21 Civil Engineering Squadron for any installation requiring modification to government property.
The customer shall coordinate with the facility manager to obtain an approved Base Civil Engineer Work Request (AF Form 332) if applicable. The awardee shall confirm an approved work request exists for the facility prior to installation.
2 GENERAL INFORMATION:
2.1 HOURS OF OPERATION: Commercial services shall be readily available 7 days a week. Contractor personnel are not required to be on-site on a daily basis.
2.2 Emergency Services: The contractor shall respond to all out-of-service conditions within 4 hours and make the necessary repair to maintain service.
2.3 Standards of Conduct: The contractor personnel must adhere to standards of conduct as established by the Installation Commander.
2.4 Security Requirements: The contractor shall adhere to current installation security policies.
2.5 Confined Space: The contractor and/or any sub-contractors entering confined spaces on Peterson SFB are responsible for the safety of their personnel and for their own permit space program as outlined in Air Force Instruction 91-203, Air Force Consolidated Occupational Safety Instruction and OSHA Occupational Safety and Health Administration.
2.6 Traffic Control: In the event base vehicular traffic is to be disrupted by contractor activities, notification shall be made to 21 SFS Duty Sergeant at 719-556-4805 no later than 72 hours in advance of planned disruptions.
2.7 Records: The contractor shall be responsible for creating and maintaining cable layout drawings (as-built) on any modifications to connectivity or real property.