Spencer Whistle Stop Road Maintenance Performance Work Statement (PWS)
Contents Project Title General Information
1.0 Purpose and Location
Contractor Requirements
2.0 Technical Requirements / Tasks
3.0 Applicable Laws, Regulations, Specifications, and Guidance……………………………………….3
4.0 Performance Requirement Measures
5.0 Definitions………………………………………………………………………………………………….5
Attachments
General Information
1.0 Purpose and Location
Purpose:
This is a non-personal services contract for road maintenance services at Spencer Whistle Stop.
Performance for this requirement includes road-side vegetation removal and road blading of gravel roads at the Spencer Whistle Stop.
The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
Background:
The Spencer Whistle Stop Road system is an isolated road system that is only accessible via the Alaska Railroad. The site has seen historic use as a gravel pit and shield rock source but is currently used as a recreation area for the public as well as outfitting and guiding operations.
1.1 Outline of Services: The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS).
1.2 Project Location: The project area is located along the Alaska Railroad approximately 9 miles south of the Portage Whistle Stop, adjacent to the Seward highway at Portage, Alaska.
1.3 Period of Performance:
a. Base and Option Items: 15 May 2022 through 15 October 2022 with a no work period between 16 June 2022 and 06 September 2022.
Contractor Requirements
2.0 Technical Requirements / Tasks
The Contractor shall coordinate activities with the CO and/or COR.
The Contractor shall provide 7 working days’ notice to the CO and COR prior to starting performance.
All equipment will need to be transported to the site via railroad. The Contractor is responsible for arranging transportation and paying fees associated with transportation to and from the site on the Alaska Railroad. Equipment and personnel can be loaded at the Portage Train Depot, located at milepost 80 of the Seward Highway.
Road blading will require scarification and processing of existing roadway materials to recover aggregate from shoulders and ditch lines. Optional work includes Spot Surfacing of road surface in locations designated by the CO and construction of several small portions of new road. Spot Surfacing will be done using material from an aggregate stockpile located approximately in the middle of the Spencer Whistle Stop Road system. New construction will require clearing and grubbing, excavation and embankment and aggregate surfacing from the local stockpile. See the attached Linear Grading Typical Section and FP-14 Section 212 for details on new construction requirements. Exact locations of new road construction will be marked on the ground by the CO. See attached site map for locations of different sections of road requiring maintenance and general locations of new construction.
2.1 Tasks:
Schedule of Items Base Requirements:
2.1.1 Mobilization (15101): (refer to FP-14 for performance requirements)
i. The movement of personnel, equipment, material, and incidentals to and from the project site.
ii. Performing work necessary before beginning work at the project site.
iii. Obtaining any permits, insurance, and bonds.
iv. Show compliance with invasive free requirements
v. Demobilizing from the site. Contractor shall NOT de-mobilize until after final inspection and acceptance from the CO/COR.
2.1.2 Blading Roads with Compaction B (81101B): (refer to attached Special Project Specifications for performance requirements)
i. Grade 2.46 miles of existing roadways
2.1.3 Remove Roadway Vegetation (84201): (refer to attached Special Project
i. Brush existing 2.46 miles of roadway
2.1.4 Traffic Control Plan
i. Install traffic control devices and signs as shown on contractor supplied traffic control plan
Schedule of Items Optional Requirements:
2.1.5 Mobilization (15102): (for additional equipment and personnel needed to perform optional work)
i. The movement of personnel, equipment, material, and incidentals to and from the project site.
ii. Performing work necessary before beginning work at the project site.
iii. Obtaining any permits, insurance, and bonds.
iv. Demobilizing from the site. Contractor shall NOT de-mobilize until after final inspection and acceptance from the CO/COR.
2.1.6 Linear Grading (21201): (refer to FP-14 for performance requirements)
i. Construct 0.24 miles of roadbed within the staked alignments and in accordance with the
Linear Grading Typical Section (attached).
2.1.7 Spot Surfacing, Contractor-Furnished (81301A): (refer to attached Special Project
i. 300 cubic yards (CY) of material for spot surface
ii. 4-inch Thickness
iii. Government-Furnished Material
iv. Compaction B
v. Measurement A
vi. Placed on roads in locations as designated by the COR or government technical monitor.
Contractor Requirements
3.0 Applicable Laws, Regulations, Specifications and Guidance
1) Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) which can be downloaded here: https://highways.dot.gov/federal-lands/specs
2) Attached are Special Project Specifications that shall be followed for performance of this Task Order.
3) BEST MANAGEMENT PRACTICES BMP’S Soil and Water Conservation Handbook FSH
2509.22 The BMP Soil and Water Conservation Handbook, FSH 2509.22 can be found at:
http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April2012.pdf
4) The above is a list of major specifications applicable to this requirement. Other specifications referred to within these specifications (even though not specifically listed here) are also fully applicable.
4.0 Deliverable/Schedule
The Contractor shall submit all deliverables for this Performance Work Statement in accordance with timelines listed above. Below is a list of all deliverables outlining each objective and due date.
Key Deliverables
Item No. Deliverable Objective Due
2.1.1 & 2.1.5
Work Schedule To notify the government of when the contractor shall be on site performing work.
7 business days prior to commencement of work
2.1.1 & 2.1.5
Equipment List For government situational awareness and to ensure all equipment is inspected IAW with paragraph 2.1.1
7 business days prior to start of performance.
2.1.4 Traffic Control Plan To ensure trails and roadways remain open and that all personnel have reduced risk of traffic related injuries
7 business day prior to work in affected area.
https://highways.dot.gov/federal-lands/specs http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April2012.pdf
5.0 Performance Requirement Measures
Performance Objective
PWS
Paragraph
Measurement Method Allowable Performance Deviation
Remedy or Corrective Action
Blading Roads with Compaction B
2.1.2 Periodic surveillance by COR -
Visual Inspection
Zero (0)% deviation
Contractor shall rework prior to payment for performance.
Remove Roadway Vegetation
2.1.3 Periodic surveillance by the COR
– Cubic Yard measured in its final position as “In Place Quantity”
One (1)% deviation along 2.46 miles
Contractor shall rework prior to payment for performance.
Linear Grading
2.1.6 Visual inspection One (1)%
deviation along 0.24 miles
Contractor shall rework prior to payment for performance.
Spot Surfacing, Contractor- Furnished
2.1.7 Periodic surveillance by COR –
Cubic Yard measured in its final position as “In Place Quantity”
One (1)% deviation along 2.46 miles
Contractor shall rework prior to payment for performance.
Trail accessible to pedestrian traffic at all times.
2.1.2, 2.1.3, 2.1.4, 2.1.6, 2.1.7
COR shall spot check areas 2 closures without ad-vanced noti-fication
Re-open areas within 1 hour of notification from COR of deficiency. COR shall be notified as soon as possible of any closures.
Road safety 2.1.4 Plan submitted to the COR, warning signs appropriately placed
Zero (0)% deviation
Submit the plan prior to work start. If the work plan is not received prior to the start of performance a stop work and payment shall occur until plan is re-ceived. If signs are not posted, the contractor shall immediately correct the deficiency upon notification from COR.
Equipment listed is free of invasive species
2.1.1 COR shall inspect equipment for
100% compliance
Zero (0)% deviation
Contractor shall immedi-ately remove the invasive species from the work site.
A stop work shall be issued until violations are cor-rected.
Notes: Performance Standard: The Government will visually inspect the services for compliance prior to acceptance and issuing any payments. Inspections will consist of direct observations and measured in place quantities
5.0 Definitions, Acronyms, and Applicable Publications
Attachments
• Attachment #1: Special Project Specifications
• Attachment #2: Work Location Map
• Attachment #3: Linear Grading Typical Section