Attachment 1 - Performance Work Statement (PWS) PAFB Fire Alarm System Maintenance dated 23 July 2020.docx

DOCX document 40 KB Posted

Attached to
Request for Quote (RFQ) Fire Alarm Maintenance and Repairs, Peterson AFB
Solicitation number
FA251720Q0059
Issued by

About this file

This performance work statement outlines requirements for fire alarm system maintenance services at Peterson Air Force Base. The contractor shall provide 288 hours per year of on-site technical support and repairs to the EST and Fireworks alarm platforms, including hardware, software, and firmware maintenance. The contractor must have NICET Level III technicians and five years of experience with these systems. Monthly reporting and a one-year parts and labor warranty are required. The government will provide utilities and emergency response on base. Work hours are 7am-3:30pm Monday through Friday, excluding federal holidays. The contractor must comply with all security and safety policies while on base.

This related solicitation, FA251720Q0059, requests quotes for the fire alarm maintenance and repair services described in the attached performance work statement for Peterson Air Force Base. Offerors shall follow the instructions in the RFQ. The Department of the Air Force Space Command is the contracting agency.

View the file

Other files

File Type Posted
Attachment 2 - Contractor Submittal Form.docx DOCX document
Request for Quote (RFQ) PAFB Fire Alarm Systems Maintenance.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Peterson AFB Performance Work Statement (PWS) Fire Alarm Systems Maintenance 23 Jul 2020

SECTION 1

1. DESCRIPTION OF SERVICES: The contractor shall furnish labor and material necessary to perform technical support, testing, repairs, troubleshooting, upgrades, and training in support of Edwards Fireworks fire alarm systems platform and EST building control panels including system hardware, firmware and software in accordance with (IAW) this Performance Work Statement (PWS) at Peterson Air Force Base (AFB). Peterson AFB Fire Alarms System is a standalone system network.

1.1 SCOPE OF WORK:

1.1.1. On-Site service and Technical support: Contract shall include, at a minimum 288 hours per year (24 hours per month) of scheduled visits of a Fire Alarm Technician. The COR (Contracting Officer Representative) will provide tasks for technician to be accomplished on a schedule. System parts and software costs shall be identified and itemized separately by contractor. Technical Support can include a variety of work described in the following paragraphs.

1.1.1.1 Hardware Support Tasks: Contractor shall troubleshoot and repair identified hardware problems. Items suspected of being faulty may be repaired or replaced at the customer’s option to restore system integrity.

1.1.1.2 Software Support Tasks: During monthly site visits or on-site service calls, the contractor may be tasked with a variety of programming or software maintenance tasks. Typical activities include troubleshooting, user issues, programming adjustments and other routine maintenance tasks. No USB Devices are allowed. CDs will be scanned by prior to uploading on government computer. No wireless, remote monitoring or Infrared IR is authorized within Peterson AFB.

1.1.1.3. Software/Firmware Updates: Contractor will inform the COR of all applicable software/firmware updates to the systems within its functional capabilities. Software/firmware upgrades to the system will be installed and tested, if approved by the COR. New versions of software shall be offered at preferred discount rates.

1.1.1.4. Operator Training: As part of this agreement, contractor may provide on-site and informal training.

1.1.1.5. System Performance Reviews: In addition to performing the Technical Support tasks described herein, contractor will be available for system consultation, troubleshooting, graphics modification, programming changes, etc.

1.1.1.6 Required Government Approval: Total costs of parts per service call SHALL NOT EXCEED $1000.00 PER SERVICE CALL WITHOUT PRIOR GOVERNMENT APPROVAL. If additional time is needed to complete a job when nearing the $1000, call the COR for written approval. When parts for any service call is expected to exceed $1000, the contractor shall provide to the COR, via e-mail, a proposal to complete the entire call; including all parts and labor within (2) workdays after the initial service call for routine service call. For any individual material item exceeding $2,500 in cost, the contractor shall provide a quote to the COR and Contracting Officer (CO) for written approval. To ensure the Government receives the most cost effective price on materials over $2,500, the contractor shall provide documentation that the contractor has selected the best price for the item(s). This documentation may be 3 quotes of same or similar item(s), and any discounts given the Government. If only one manufacturer provides the material, the contractor shall provide a copy of the actual invoice for the material or any documentation supporting a reasonable price from published or catalog prices. Material over $2,500 will need to be determined fair and reasonable by the CO prior to completing the work. Upon government approval and notification, the contractor shall commence repair work. Invoices will state repair work performed with itemized listing of labor and parts by facility and service call number.

1.1.2. On-Site Documentation: Contractor will document each on-site service call and furnish the COR with a copy showing time, date, technician, and a brief description of the activity along with recommendations (if any).

1.1.3. Contract Service and Logistical Support: Contractor will submit to the COR electronically a monthly report detailing all activity charged to the contract during the month including labor hours, parts, technician and date of service by the fifth day of each month. Contractor shall submit one invoice for materials per month in Wide Area Work Flow (WAWF) to include all work completed during that month.

1.1.4 Standard Equipment Requirements: All hardware and software of the approved type supplied for the installation should be compatible with the existing system.

SECTION II

2. SERVICE SUMMARY: The Service Summary is a list of performance objectives and performance thresholds that represents the minimum acceptable level of performance. The performance objectives and thresholds will be regularly verified by the COR and the Fire Emergency Personnel. Each performance objective represents a significant task as identified by the Government at the time of contract award. These performance objectives and performance thresholds represent only the significant task of this contract and do not excuse the Contractor from performance of other responsibilities identified in this PWS. Additionally, performance objectives may be added or deleted and performance thresholds raised or lowered during the course of the contract.

Item #
Performance Objective
PWS Para
Performance Threshold
1
Satisfactory completion of scheduled on-site work.
1.1.1
1 defect
2
Completion and submittal of report upon completion of work.
1.1.2
2 defects
3
Monthly Report submitted to COR by 5th day of each month.
1.1.3

1 defect

Defect – A service that does not meet the requirements of the PWS.

SECTION III

3. GOVERNMENT-FURNISHED PROPERTY AND SERVICES. The government will provide utilities (water and electricity) and emergency fire and security police response.

SECTION IV

4. GENERAL INFORMATION

4.1. Hours of Operation: Services will be delivered during the hours of 7:00 A.M. – 3:30 P.M., Monday through Friday. Services that require after hours work and/or urgent call services or inspections will be pre-coordinated and scheduled with the Contracting Officer’s Representative (COR).

The contractor is not required to provide service on the following days:

New Year’s Day (January)Labor Day (September)
Martin Luther King Day (January)Columbus Day (October)
President’s Day (February)Veteran’s Day (November)
Memorial Day (May)Thanksgiving Day (November)
Independence Day (July)Christmas Day (December)

4.2. Green Procurement: Peterson AFB promotes and prefers to acquire U.S. Environmental Protection Agency (EPA) list of EPA-design products at www.epa.gov/ Comprehensive Procurement Guideline (CPG) program is part of the U.S. Environmental Protection Agency (EPA) continuing effort to promote the use of materials recovered from solid waste. Buying recycled-content products ensures that the materials collected in recycling programs will be used again for the manufacture of new products. Peterson AFB prefers to acquire products that contain recycled-content, bio-based, energy efficient and low volatile organic compounds. Contractor is responsible for compliance with federal and state environmental laws and regulations applicable to work (CFR 40).

4.3. Contractor Qualification/Experience: Contractor shall provide employees with five (5) years of experience installing and maintaining EST/Fireworks systems. Contractor shall have a NICET Level III technician providing onsite oversight to work. Contractor will provide a list of all employees’ training, certifications and experience as part of proposal.

4.3.1. Contractor Employees: Do not employ persons for work on this contract if such employee is identified to the Contractor, by the contracting officer, as a potential threat to the health, safety, security or operational mission of the installation and its population. Contractor is responsible for meeting safety and occupational health regulations required by federal and state law.

4.3.2. Contractor Appearance: Present a neat appearance and be easily recognized as Contractor employees. Identification of all employees may be accomplished by wearing a company badge or by Contractor-provided distinctive clothing bearing the name of the Contractor. A Government-issued identification badge will be worn visibly at all times.

4.4. Quality Assurance: The government will evaluate the contractor’s performance under this contract through on-site inspections and customer complaints. Fire inspectors will routinely perform quality checks during their scheduled and unscheduled building inspections.

4.5. Security Requirements:

4.5.1. Security Policies and Procedures: Comply with all Peterson AFB security requirements imposed by the local installation commander at all times while on the premises to include not using cell phones while operating a vehicle on Base. Obtain necessary badges(s) required for access to Peterson AFB.

4.5.2. Badge Request: Send a letter to the Contracting Office on company stationery, which will include address, telephone number, and contract number, listing full names of employee(s), with their social security number, date of birth and place of birth, who require access to Peterson AFB. After approval by Security Forces, this letter will be on file for 30 days and then discarded. Thereafter, anytime a badge is requested for a new employee, an updated employee list will accompany a request letter by the Contractor to the contracting office.

4.6. Safety on Air Force Installations: In accordance with (IAW) Air Force Instruction (AFI) 91-207 “USAF Traffic Safety Program”, Chapter 3, the following are mandatory policies for each individual, while on all Air Force (AF) Installations.

4.6.1. Vehicle operators on an AF installation and operators of Government owned, leased, or rented vehicles, on or off an AF installation, shall not use cell phones while the vehicle is in operation, except when using a hands-free device or hands-free operating mode. When possible, vehicle operators should pull over and place the vehicle in park before using any cell phone.

4.6.2. Land Mobile Radios (LMR) are primarily listening devices and are not restricted. Cell phones and other devices, used only in push-to-talk (walkie-talkie, direct connection) mode are considered LMR if required and issued for the performance of official duties.

4.7. WARRANTY: Contractor shall warranty new work completed for a standard one year for parts and labor.

4.8. Performance of Services During Crisis Declared by the National Command Authority or Overseas Combatant Commander: According to Department of Defense Instruction (DODI) 3020.37, it is determined that all services to be performed under this contract are essential for performance during crisis unless otherwise directed by an authorized government representative.

SECTION V

5. APPENDICES:

5.1. APPENDIX A - Estimated Workload

APPENDIX A

ESTIMATED WORKLOAD

Line Item 1, On-Site Service and Technical Support: Technician shall include, at a minimum, 288 hours per year or 24 hours per month of scheduled visits on a routine basis.

Normal working hours are defined as 7:00 A.M. to 3:30 P.M. Monday through Friday inclusive, excluding Holidays.

Line Item 2, Parts: Contractor will provide parts breakdown of scheduled work.

Line Item 3, Fire Alarm System upgrade: Upgrades will be negotiated separately and contingent on availability of funds.