This is a Performance Work Statement (PWS) for Building 4607 Exhaust System Troubleshooting at Cannon Air Force Base, New Mexico, dated 16 December 2025.

The contractor shall provide all labor, personnel, equipment, tools, materials, transportation, supervision, and qualifications necessary to troubleshoot the building 4607 exhaust system. Primary deliverables include testing and troubleshooting the communications control bus to all controllers and terminal equipment, verifying sequence of operations, creating a deficiency list of non-working controllers and equipment, and compiling a final report for 27 SOCES detailing items requiring repair or replacement. The scope encompasses communications BUS wiring minor repairs such as re-terminating controllers and devices; major repairs including high bay/ceiling wire replacement (over 10 feet in height) and long runs exceeding 25 feet are excluded. The contractor must test network and field controller I/O control and monitoring points across multiple systems including paint booth air handler units, exhaust fans, breathing air systems, chilled water systems, heating water systems, machine shop air handlers and terminal units, and office air handlers with variable air volumes. The contractor will coordinate with a remote software engineer to verify system points and equipment in graphic utility interface systems and to verify sequence of operation. All work must comply with federal, state, and local laws, regulations, and industry standards.

Work is performed at Cannon Air Force Base (CAFB) with standard hours of 0700–1600, Monday through Friday, excluding U.S. Federal holidays. The contractor must provide and maintain all necessary vehicles with company identification displayed prominently; equipment failure does not relieve contract performance requirements. Contractor personnel must present a neat appearance, be easily recognizable as contractor employees, and possess clear English language proficiency. All contractor employees require base passes obtained through 27th Special Operations Security Forces Squadron Pass and Identification Section, with requests submitted to 27th Special Operations Contracting Squadron point of contact within three business days. Contractor employees are prohibited from possessing weapons, firearms, or ammunition on CAFB. The government will provide electricity and potable water subject to area availability. Safety compliance with OSHA requirements is mandatory, and the contractor must report all damage to government property or injuries within one hour to the Contracting Officer or Contracting Officer's Representative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

BUILDING 4607 EXHAUST SYSTEM

TROUBLESHOOTING

Cannon Air Force Base, New Mexico

Date: 16 Dec 2025

Contract: Pending Attachment 1 Date: 23 Oct 2025

1. DESCRIPTION OF SERVICES. The contractor shall provide all labor, personnel, equipment, tools, materials, transportation, supervision, qualifications and other items and services necessary to troubleshoot building 4607 exhaust system. The Contractor will troubleshoot communications control bus, verify sequence of operations, create deficiency list on non-working controllers and equipment. Once completed contractor will compile a report on the items needed to be repaired or replaced to 27 SOCES for review. The contractor shall perform the requirements of this PWS in compliance with all federal, state, and local laws, regulations and industry standards.

1.2 Requirements. Test and troubleshoot communications BUS to all controllers and terminal equipment. Communication BUS wiring minor repairs such as re-terminating controllers and devices is included. Major repairs such as high bay/ceiling (over 10’ in height) wire replacement & device terminations or long runs (over 25’) are not included. Test network and field controllers I/O control and monitoring points and equipment responses. Work with remote software engineer to verify points and equipment in graphic utility interface systems included – paint booth air handler unit's, exhaust fan's, breathing air system, chilled water system, heating water system, machine shop air handler and terminal units, and office air handler and variable air volume's. All pumps, valves and actuators. Remote software engineer to operate and monitor automation system to verify sequence of operation with on-site technician.

1.3. Utilities: The government will allow the use of electricity and potable water (subject to availability in the area) for accomplishment of service IAW this PWS.

2. GENERAL INFORMATION.

2.1. Personnel: Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. Employees must be clearly able to read, write, speak and understand English.

2.2. CAFB Access: The contractor shall ensure the pass and identification items required for contract performance are obtained for employees. The Pass and Identification Section of 27th Special Operations Security Forces Squadron (27 SOSFS) will provide base entry authorizations/passes to each authorized contractor employee. In addition, contractor personnel wishing to operate a privately-owned vehicle on CAFB must comply with all applicable state and base requirements. Entry authorizations must be renewed as required by the 27 SOSFS Pass and Identification Section. All contractor base pass requests must be sent to the point of contact on the contract from 27th Special Operations Contracting Squadron (27 SOCONS) within three business days of the time needed for the pass.

2.3. Retrieving Identification Media: The contractor shall retrieve all identification media, including vehicle passes, from employees who depart for any reason before the contract expires (e.g., terminated for cause, retirement, etc.).

Contract: Pending Attachment 1 Date: 23 Oct 2025

2.4. Vehicles: The contractor shall provide and maintain all vehicles necessary to perform the requirements of this contract. Contractor vehicles shall have the company name prominently displayed on both sides of the vehicles. Vehicles shall be clean and always have a neat, professional appearance. All vehicles shall be in operable condition. Vehicle repairs, other than emergency repairs, shall not be accomplished on CAFB. Equipment failure shall not alleviate the contractor from performing any requirement contained in this contract.

2.4.1. Only qualified operators shall be permitted to operate the vehicles or equipment for work required under this contract. Vehicle/equipment operators shall possess a valid driver’s license.

2.4.2. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicles or privately-owned vehicle while on CAFB.

2.4.3. Traffic Laws. Contractor employees shall comply with all base traffic regulations. The contractor is not permitted to use cell phones on CAFB while operating a moving vehicle, unless the device is hands-free.

2.5. Work Hours: The work hours and work days for the period of performance are 0700 - 1600, Monday through Friday, with the exception of U.S. Federal holidays (listed below).

Additionally, if the contractor needs to work outside of the normal work hours, a request must be submitted to the Contracting Officer (CO) for approval.

New Year’s Day Labor Day Juneteenth Martin Luther King Day Columbus Day Washington’s Birthday Veterans Day Memorial Day Thanksgiving Day Independence Day Christmas Day

2.6. Security Forces and Fire Protection Services: On CAFB; Contact the appropriate agency in case of emergency by dialing 911. If dialing 911 from a cell phone, the call may be automatically routed to an off-base agency, such as the city of Clovis, NM. Be clear about whom you are communicating with and what your situation requires.

2.7. Safety Requirements: In performing work under this contract, the contractor shall conform to the safety requirements as required by OSHA. The contractor shall provide protection to Government property to prevent damage during the period of time the property is occupied by or in possession of the contractor. The contractor shall record and report promptly (within one hour) to the CO or COR, all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.