Summary: JLG Boom Lift Maintenance and Repair Services Performance Work Statement

This is a Performance Work Statement dated 25 June 2026 for the maintenance and repair of one JLG Boom Lift (Field Number JLG3) assigned to the Aerospace Ground Equipment Flight for aircraft maintenance operations. The equipment is currently non-operational, and service and major repair are critical to mission success. The contractor must provide all labor, tools, and materials necessary to complete comprehensive servicing and repair of the hydraulic system, including flushing the system, changing filters and seals, inspecting hoses for damage, removing and replacing seals in lift cylinders and steering cylinders, and removing and replacing the hydraulic main swivel motor. The contractor is responsible for lawful disposal of all removed fluids, filters, hoses, hydraulic motors, and seals, as well as for pickup and delivery of the equipment. The quote must include parts, labor, shop supplies, hazardous waste disposal, and freight fees.

The contractor must obtain approval from the designated Government Point of Contact prior to performing any work and must coordinate all pickup and drop-off times with the Aerospace Ground Equipment POC. Working hours are normally 7:30 AM to 4:30 PM, excluding weekends and holidays. All equipment, supplies, and materials provided must be new and not refurbished. Upon completion, the JLG must meet functional specifications including lifting boom capability with or without operator, full 360-degree swivel operation, forward and reverse drive capability, left-to-right steering, and continuous runtime as needed for aircraft maintenance operations. The contractor must maintain all applicable certifications and insurance and is responsible for all costs to repair any government equipment damage resulting from contractor negligence. No warranty is required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JLG Boom Lift Maintenance and Repair Services

Performance Work Statement, Dated 25 June 2026

I. Introduction:

This Performance Work Statement (PWS) covers the following equipment:

Field Number Equipment Type

JLG3 JLG Lift

II. Background:

This PWS outlines the requirements for service and repair of the hydraulic system of the JLG lift.

Currently the JLG is non-operational and the need for service and major repair is critical to mission success. This JLG unit is one of three assigned to the Aerospace Ground Equipment Flight and is utilized in aircraft maintenance operations. The hydraulic system requires servicing, lift cylinders require new seal kits, hydraulic motor requires removal and replacement, service, pickup, and delivery of the JLG unit.

Image 1: Example of JLG Unit Image 2: Example of Seal Kit Image 3: Example of Hydraulic Motor

III. Pickup, Delivery, and Repair of JLG Unit:

1. The contractor shall provide all labor, tools, and materials/parts necessary for the complete servicing and repair of the JLG unit.

a. The servicing of the JLG unit will include flushing the hydraulic system, changing filters, seals, and checking for any damage to existing hoses before and after any major repairs are to be performed on the JLG unit.

b. The repair of the JLG unit will include removal and replacement of seals in the lift cylinders and steering cylinders, and lastly the removal and replacement of the hydraulic main swivel motor.

c. The contractor is responsible for the lawful disposal of any and all fluids removed, any and all filters removed, any and all hoses removed, hydraulic motors removed, and any and all seals removed.

2. To maintain operational readiness and accommodate equipment availability, the Government requires that the repair shop to obtain approval from the designated Government representative prior to performing any work on the equipment.

3. The contractor’s quote shall include parts, labor, shop supplies, hazardous waste, and freight fees.

4. All equipment, supplies and materials provided / installed shall be new and not refurbished.

FA460826QS043

Attachment 1

5. The contractor will be responsible for and incur all labor and material costs required to repair any damage to government owned equipment that may occur due to negligence during this contract.

6. The contractor must have all applicable certifications to perform the quoted work as well as be insured.

IV. Scheduling

1. The contractor shall coordinate with the Aerospace Ground Equipment Point of Contact (POC) for equipment pickup and drop off times.

2. Working hours for the contractor will normally be between 7:30 AM. and 4:30 PM, excluding

Saturdays, Sundays, and applicable holidays.

V. Requirements

The performed service and repair of the JLG must meet the following specifications:

• Lift boom with or without operator in basket.

• Swivel a full 360 degrees without issues.

• Drive forward and reverse.

• Steer from left to right.

• Runtime:

o As long as the aircraft maintenance operations personnel need the JLG to perform tasks.

• Warranty: N/A

*****End of Performance Work Statement*****