This Performance Work Statement (PWS) details an herbicide treatment project for the U.S. Fish and Wildlife Service across two National Wildlife Refuges: Big Branch Marsh NWR and Bogue Chitto NWR. The contractor will apply herbicides to control Cogon grass and Chinese tallow trees across 486 total treatment acres, using foliar spraying for smaller plants and hack-n-squirt methods for larger trees. The treatment will be conducted using USFWS-provided chemicals, with specific requirements including 95% control of target vegetation while minimizing damage to native species, compliance with EPA standards, and completion by December 30, 2025.
The project involves six treatment units ranging from 38 to 187 acres: Barringer Unit (56 acres), Boy Scout Units West and East (66 and 38 acres), North Paquet Unit (187 acres), and Units A and D on Bogue Chitto NWR (50 and 89 acres). The contractor must supply all equipment, labor, and water, with the USFWS providing chemicals. Specific application guidelines include avoiding treatments during temperatures above 95°F or when precipitation is forecast within 6 hours, maintaining detailed GPS logs, and submitting bi-weekly documentation. The contractor will be required to have appropriately licensed personnel and equipment for chemical application in semi-remote conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_4-_Past_Performance_Data_Document.docx | DOCX document | |
| Sol_140FS325Q0140.pdf | ||
| Attachment_3-_SCA_Wage_Determination.pdf | ||
| Attachment_2-Quote_Schedule.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
© ESI 1
1.0 Introduction
Provide a brief description of what you are procuring.
The contractor will mix and apply the provided herbicide and adjuvant on up to 6 units comprising of 4 units at 347 acres on Big Branch Marsh National Wildlife Refuge (NWR) and 2 units at 139 acres on Bogue Chitto NWR for a total of 486 treatment acres across both refuges. Application will be by foliar spraying for Cogon grass and young Chinese tallow trees utilizing backpack sprayers or similar equipment, and by hack-n-squirt for larger Chinese tallow trees greater than 3 feet tall. Herbicide for each treatment type will be provided by the USFWS.
Each unit must be fully canvased, and all instances of Cogon grass and Chinese tallow trees must be sprayed. All Cogon grass patches must be sprayed up to 10 feet beyond the visible edge of the patch. Chinese tallow trees treated by hack-n-squirt may be fully cut and the stem sprayed. Larger Chinese tallow trees must be fully girdled and sprayed. Herbicides will be applied only in units that have been pre-defined and mapped within the USFWS geographic information system (GIS) database (see attached maps).
2.0 Background
Provide any historical information necessary to understand how and why the requirement evolved and where it is headed. Include appropriate information to help the reader understand the requirement.
The treatment units are under a prescribed fire burn rotation and most have been burned at least once within the last 2 years. Certain portions of units on Big Branch Marsh NWR have not been burned as frequently and Chinese tallow trees have become more prevalent as a result. Chinese tallow is mostly relegated to the understory in units that are burned more frequently. Cogon grass is a larger issue due to its proclivity to fire; prescribed burns do not control Cogon grass and instead can aid in its spread. These herbicide treatments will be conducted in conjunction with refuge prescribed burning to maximize the herbicide treatment’s effectiveness.
© ESI 2
3.0 Scope
Provide an overview of the performance work statement (PWS) emphasizing the most important aspects of your requirement and defining the boundaries of the contractor’s performance responsibilities.
1) The contractor will apply enough herbicide to kill and control 95% of all Cogon grass and Chinese tallow trees located throughout the units identfied, but damage or kill no more than 5% of any other desirable native species, excluding species sprayed within the 10 foot buffer zone around Cogon grass patches.
2) Treatment units (see attached maps): Barringer Unit: 56 acres, Boy Scout Unit West: 66 acres, Boyscout Unit East: 38 acres, North Paquet Unit: 187 acres, Unit A: 50 acres, Unit D: 89 acres. All units other than Units A and D are located on Big Branch Marsh NWR (347 acres) and Units A and D are located on Bogue Chitto NWR (139 acres) for a total of 486 acres across both refuges (see attached maps).
3) The contractor must comply 100% with the agreed-upon plan of work. The contractor must have work dates and a plan of work approved by the USFWS 48 hours prior to beginning work, preferably established during a face-to-face pre-work meeting. Chemical supplied by the USFWS may be given to the contractor during any pre-work meeting.
4) The USFWS will provide the chemical for these herbicide treatments. The mix for foliar spraying Cogon grass and smaller Chinese tallow trees will be a mix of 1% Roundup Custom (glyphosate), 1% Imazapyr 4 SL, and 0.5% surfactant in water. The mix for cut stump and hack-n-squirt treatments for larger Chinese tallow trees will be a mix of 25% Element 4 (triclopyr) and 0.5 % surfactant in water. The contractor will be required to mix all chemical provided. The USFSW assumes responsibility for the provided chemical’s effectivness.
5) The USFWS reserves the right to remove acres from the treatment areas due to unfavorable conditions that may hinder the completion of work in those areas such as environmental factors and/or lack of provided chemical.
6) All work must be completed according to this work statement, EPA standards, and herbicide label restrictions once awarded. Contract award through December 30, 2025.
7) The contractor will supply all material, equipment, labor, and water, other than chemical, to perform the herbicide treatments. Only chemical will be provided.
8) The contractor will supply all equipment to provide mixing and loading equipment.
9) Equipment and personnel must be able to work at a semi-remote and semi-primitive site (i.e., no electrical or water hookups, bathrooms, or other facilities available).
10) The contractor must be capable of calibrating equipment to the final application rate specifications.
11) The Government Representative (GR) must be notified at least 48 hours prior to any chemical application.
12) The contractor will provide adequate personnel for the purpose of loading and dispersing of the chemicals.
All personnel and equipment to be used will be appropriately licensed and certificated as appropriate for the work to be done. The contractor will be responsible for checking all work sites for hazards of any type which could affect their ability to accomplish the treatment project.
13) The contractor will be responsible for all unloading/loading operations. Movement of chemicals, water, and equipment in and around the treatment locations will be the sole responsibility of the contract applicators.
The contractor will be responsible for providing sufficient equipment, equipment fuel, safety items, spill response kit, personnel and their subsistence needs during the project period.
14) The contractor will provide USFWS with contact information for all ground personnel, and vehicle and equipment identification information (including make, model, and color) at least 24 hours before implementation of the project. All access methods and equipment needed are the responsibility of the contactor.
15) No chemical applications may be made when temperatures exceed 95 F, or when precipitation is forecast within 6 hours. Minimum standards must be maintained to prevent chemical absorption into/onto untargeted vegetation.
16) No heavy equipment will be allowed to operate within the treatment units sooner than 48 hours after a rain event of 2 inches or more. During periods of extended wet weather or in areas with saturated soils, equipment cannot cause ruts greater than 6 inches deep. If work is prohibited by the USFWS due to extended wet weather, negotiations may be made to lengthen the contract period.
© ESI 3
4.0 Applicable Directives
List all documents referenced in section 5.0, Performance Requirements, with which the contractor will have to comply in performance of the contract effort. If only portions of a given document apply, specifically identify the applicable portions.
- 52.237-02 Protection of Government Buildings, Equipment, and Non-target Vegetation
- 52.222-54 Employment Eligibility Verification
- 52.236-13 Accident Prevention
- 52.237-03 Continuity of Service
- 52.249-14 Excusable Delays
5.0 Performance Requirements
Identify what the contractor is required to do (major tasks and subtasks).
1. Apply herbicide according to desired outcomes as per label directions and quantities.
2. 100% coverage of the treatment area, 95% minimal control of target vegetation measured within one month after last application as measured by Refuge staff.
3. Minimal kill of 5% residual desirable native species, excluding 10 foot buffer zones around Cogon grass patches.
6.0 Deliverables
List all data required to manage or monitor contractor performance.
Contractor shall provide:
1) Daily logs to document work shall be submitted electronically bi-weekly. The contractor will supply GPS files of all application paths and of all application locations. The contractor will also supply shapefiles in Environmental Systems Research Institute (ESRI) format of all application paths and of all application locations at the conclusion of the application.
2) The GR will inspect all areas periodically during the contract period and will perform a final inspection of all areas 30 days following treatments to approve payment. Evaluation and acceptance will be determined by the Technical Coordinator(s) and/or Refuge Manager(s). Chemical applications will be evaluated for thoroughness and evenness of application using GPS files and shapefiles provided by the contractor, and by field-checking application areas for chemical effects (e.g., looking for skips or overlaps within the treatment areas).
3) Georeferenced PDF maps are included and can be used with Avenza. GIS shapefiles of the treatment areas will be provided by the USFWS upon request.
© ESI 4
7.0 Location map of all treatment units on Big Branch Marsh NWR.
© ESI 5
7.1 Location map of all treatment units on Bogue Chitto NWR:
© ESI 6
7.2 Barringer treatment unit map
© ESI 7
7.3 Boy Scout treatment units map:
© ESI 8
7.4 North Paquet treatment unit map:
© ESI 9
7.5 Unit A treatment map:
© ESI 10
7.6 Unit D treatment map:
© ESI 11
8.0 Technical Coordinators
End of Performance Work Statement
TECHNICAL COORDINATORS:
Matthew Sieja (Administrative Forester) U.S. Fish and Wildlife Service Southeast Louisiana Refuge Complex 61389 Hwy 434 Lacombe LA, 70445 Phone: (985) 517-9333 Email: matthew_sieja@fws.gov
Steven Henry (Project Leader) U.S. Fish and Wildlife Service Southeast Louisiana Refuge Complex 61389 Hwy 434 Lacombe LA, 70445 Phone: (985) 285-3335 Email: steven_s_henry@fws.gov
Jimmy Laurent (Deputy Project Leader) U.S. Fish and Wildlife Service Southeast Louisiana Refuge Complex 61389 Hwy 434 Lacombe LA, 70445 Phone: (985) 882-2031 Email: jimmy_laurent@fws.gov mailto:matthew_sieja@fws.gov mailto:steven_s_henry@fws.gov mailto:jimmy_laurent@fws.gov