This Performance Work Statement (PWS) details a hazard fuel reduction and invasive species control project for the US Fish and Wildlife Service at Harris Neck National Wildlife Refuge in McIntosh County, Georgia. The project involves treating 304 acres with herbicide to reduce root and stump sprouts following mechanical fuel reduction, with the objective of controlling at least 95% of tree regeneration and promoting an understory of at least 75% native warm-season grasses. The treatment will use ground crews with backpack sprayers applying herbicides containing imazapyr and/or triclopyr, with extreme caution to protect desirable trees and shrubs.
The project is scheduled for completion between August 15 and September 30, 2025, with potential extension due to weather or other variables. The contract is a 100% small business set-aside under NAICS code 115310 with a size standard of $34 million. Contractors must have an active SAM registration and register with the Treasury's Invoice Processing Platform. Quotes are due by June 17, 2024, at 2:00 PM EDT, with submissions required to include a proposal, quote schedule, and past performance references. The award will be made using a tradeoff method considering price, technical approach, and past experience, with the government reserving the right to select a non-lowest priced offer if deemed to provide better overall value.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2-Quote_Schedule.docx | DOCX document | |
| Sol_140FS325Q0085.pdf | ||
| Attachment_3-_SCA_Wage_Determination.pdf | ||
| Attachment_4-_Past_Performance_Data_Document.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
US Fish and Wildlife Service
Savannah Coastal Refuges Complex 694 Beech Hill Lane
Hardeeville, SC 29927
Scope of Work and Performance Work Statement
Hazard Fuel Reduction and Invasive Species Control Project (2025)
Primary POC: Shaw Davis, Deputy Project Leader shaw_davis@fws.gov
843-784-9911 (office) 912-312-5227 (mobile)
Alternate POC: Wayne Harris, Wildlife Biologist billy_harris@fws.gov
912-660-0779 (mobile)
Chuck Hayes, Supervisory Wildlife Biologist chuck_hayes@fws.gov
912-210-7366 (mobile)
Project summary: Project Summary
The project is located on Harris Neck National Wildlife Refuge (NWR) (McIntosh County, GA) (Map 1). A total of 304 acres will be treated with herbicide for fuel reduction, invasive species control, and habitat improvement (Map 2). The treatment will focus on root and stump sprouts following mechanical treatments and invasive, trees that may be encountered. Completion of this project will result in everlasting improvements in hazard fuel reduction, invasive species control, and habitat management.
Scope of Work
Overview:
This treatment is needed to reduce root sprouts, stump sprouts, and other regeneration of invasive trees following completion of mechanical fuel reduction. The objective of this treatment is to control at least 95% of all tree root and stump sprouts. Meeting this objective will promote an understory dominated by at least 75% coverage of native warm-season grasses and improve the efficacy of prescribed burns that minimize catastrophic wildfire hazard.
Once completed, the resulting native forest communities should be protected from catastrophic wildfires and conducive to frequent, low intensity prescribed burns. This schedule should maintain biological diversity and resiliency into perpetuity.
Stand specific treatment (2025)
Herbicide applications will be completed on suitable sites located throughout the treatment area.
At least 95% of all regeneration stump and root sprouts within the project area are to be treated.
Root and stump sprouts and other low growing, woody regeneration will be treated using ground crews employing backpack sprayers. Herbicides with the active ingredients imazapyr and/or triclopyr, depending on proximity to remaining, desirable trees, will be applied at the maximum rate allowed by label. Extreme care must be taken to insure no imazapyr herbicide is applied within a distance of two drip lines of any remaining, desirable hardwood trees and shrubs, including live oak, laurel oak, southern red oak, cherrybark oak, sugarberry, tough bully, and Chickasaw plum. All herbicide is to be applied at the maximum rate allowed by label.
Use of soil active herbicides will require extreme caution in areas of remaining, desirable trees and shrubs
Herbicides with triclopyr and imazapyr as active ingredients are approved for use.
Contractor is responsible for transport of all equipment, herbicides, adjuvants, and water to and from the project site.
Contractor will ensure that all applicators have labeled Personal Protective
Equipment.
Refuge Biologists will provide a shapefile defining the boundaries of the project.
Herbicide applicators will ensure that all contracted areas are treated.
All contracted personnel will pay close attention to avoid harm to curious Refuge visitors that may wander into the area of operations. Contractor should place orange cones adjacent to daily operation areas along established trails.
Operations will be suspended if weather conditions are such to cause damage to access roads and trails and/or reduce herbicide efficacy.
Refuge Biologists and Refuge Managers have the authority to halt operations anytime for unfavorable weather, damage to non-target vegetation, or non-cooperative operators.
Contractor shall be responsible for repairing any damage done by field crews to gates, fences, access roads, signs, structures, and any other infrastructure.
Refuge Biologists and Refuge Managers shall monitor all operations with frequent, on-site inspections.
No littering will be tolerated and all garbage, including empty herbicide and adjuvant containers, food waste, and other materials must be removed daily.
All operations should follow Georgia’s Best Management Practices for Forestry as minimum standards for environmental protection (BMP-Manual-2019-Web.pdf (gatrees.org)).
All bids should be based on treatment price per acre, as there will be a not to exceed amount of funding for the total project.
Period of Performance:
All ground applied herbicide treatments should be completed during the period of August 15, 2025 through September 30, 2025. This period may be extended due to unforeseen circumstances related to weather and other variables, as approved by the Refuge Managers or Wildlife Biologists and contracting officer.