Attachment 1 Performance Work Statement.pdf
PDF 745 KB Posted
- Solicitation number
- FA461324Q1031
About this file
This document is a Performance Work Statement (PWS) for cabinetry and millwork services at the Child Development Center (CDC) on F.E. Warren Air Force Base in Wyoming. The contractor shall replace, rebuild, and/or install new stairs, hinges, wall cabinets, plastic laminate, drawers, and other related components in various rooms of the CDC. The PWS provides detailed requirements for the specific work to be performed at 14 different positions throughout the facility.
The PWS is related to a pre-solicitation notice (FA461324Q1031) for the CDC Cabinets and Millwork contract opportunity. This is a sources sought/request for information notice to identify potential small business sources capable of meeting the requirements in the PWS. No solicitation is currently available, and no award will be made from this notice. The agency is conducting market research to determine the appropriate acquisition strategy, which may include a small business set-aside. Interested parties are invited to submit capability statements, provide comments on the PWS, and submit any questions by April 18, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Performance Work Statement Photos.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT FOR
Child Development Center Cabinet and Millwork
F.E. Warren Air Force Base, Wyoming
26 March 2024
DRAFT
Sources Sought FA461324Q031 Attachment 1 Performance Work Statement
Table of Contents
1. Description of Services
1.1. Basic Services
2. Services Summary
3. Government Furnished Property and/or Services
3.1. Government Furnished Property
3.2. Government Furnished Services
3.3. Government Property Incidental to the Place of Performance
4. General Information
4.1. Quality Control
4.2. Quality Assurance
4.3. Security Requirements
4.4. Physical Security
4.6. Location/Hours of Operation
4.7. Conservation of Utilities
4.8. Environmental Controls
4.9. Safety Requirements
4.11. Contractor Personnel
5. Appendices
1. Description of Services.
The contractor shall provide all management, tools, supplies, equipment, machinery, and labor necessary to perform cabinetry and millwork services at the Child Development Center, 5000 Ft. Russell Way, F.E. Warren Air Force Base, Wyoming, in accordance with the manufacturer’s listed procedures, and applicable federal, state, local laws and regulations and this performance work statement (PWS).
1.1. Basic Services. The contractor shall replace, rebuild, and/or install new stairs, hinges, wall cabinets, plastic laminate, end panels, slides on four drawer banks, recess pull, drawer fronts, drawer bank cabinet, and drawer boxes and slides in five drawer banks. The contractor shall inspect, clean, and remove all debris, and other related components/apparatuses. Each component of work shall be inspected and agreed upon by COR, Management of the Child Development Center, or other designee.
1.1.1. Position 1 (Room 115). Contractor shall replace and install stairs to diaper area. The new stairs shall be the same configuration, style, material, and colors as the existing stairs. See Attachment 2 – Photographs, position 1 (room 115) for image of stairs.
1.1.2. Position 2 (Room 114). Contractor shall replace and install stairs to diaper area. The new stairs shall be the same configuration, style, material, and colors as the existing stairs. See Attachment 2 – Photographs, position 2 (room 114) for image of stairs.
1.1.3. Position 3 (Room 113). Contractor shall replace and install stairs to diaper area. The new stairs shall be the same configuration, style, material, and colors as the existing stairs. Contractor shall replace hinges on cabinet doors (quantity 2 hinges) and the door will be able to open and close with no impediment after replacement of hinges. See Attachment 2 – Photographs, position 3 (room 113) for images.
1.1.4. Position 4 (Restroom North Wing). Contractor shall provide and install a new wall cabinet in the restroom. The cabinet shall be 36” W x 30 ½” H x 7 ¾” D. The cabinet shall be painted COLOR and will have X number of SHELVES. See Attachment 3 – Photographs, position 4 (Restroom North Wing) for image of location.
1.1.5. Position 5 (Room 141 – Toddler). Contractor shall replace and install stairs to diaper area. The new stairs shall be the same configuration, style, material, and colors as the existing stairs.
Contractor shall replace hinges on cabinet doors (quantity 2 hinges) and the door will be able to open and close with no impediment after replacement of hinges. Contractor shall replace drawer slides in four drawer bank. Contract shall replace red plastic laminate with red plastic laminate on the current set of stairs. See Attachment 2 – Photographs, position 5 (room 141) for images.
1.1.6. Position 6 (Room 142). Contractor shall replace and install stairs to diaper area. The new stairs shall be the same configuration, style, material, and colors as the existing stairs. Contractor shall replace hinges on cabinet doors (quantity 10 hinges) and the door will be able to open and close with no impediment after replacement of hinges. Contractor shall replace the top drawer and the drawer shall be the same configuration, style, material, and colors as the existing drawers. Contract shall replace red plastic laminate with red plastic laminate on the current set of stairs. See Attachment 2 – Photographs, position 6 (room 142) for images.
1.1.7. Position 7 (Room 143). Contractor shall replace and install stairs to diaper area. The new stairs shall be the same configuration, style, material, and colors as the existing stairs. Contractor shall replace hinges on cabinet doors (quantity 8 hinges) and the door will be able to open and close with no impediment after replacement of hinges. Contractor shall replace slides on four drawer bank.
Contract shall replace red plastic laminate with red plastic laminate on the current set of stairs.
Contractor shall reattach the end panel. See Attachment 2 – Photographs, position 7 (room 143) for images.
1.1.8. Position 8 (Room 144). Contractor shall replace hinges on cabinet doors (quantity 4 hinges) and the door will be able to open and close with no impediment after replacement of hinges.
Contractor shall replace slides on four drawer bank. Contract shall replace 1 recess pull. See Attachment 2 – Photographs, position 8 (room 144) for images.
1.1.9. Position 9 (Room 116). Contractor shall replace and install stairs to diaper area. The new stairs shall be the same configuration, style, material, and colors as the existing stairs. Contract shall replace missing drawer front. The drawer front shall be the same configuration, style, material, and colors as the existing drawer front (Navy laminate/3mm white banding, dimensions 17.8125” x 6”).
Contract shall replace navy plastic laminate with navy plastic laminate on the current set of stairs.
See Attachment 2 – Photographs, position 9 (room 116) for images.
1.1.10. Position 10 (Room 126). Contractor shall replace hinges on cabinet doors (quantity 4 hinges) and the door will be able to open and close with no impediment after replacement of hinges. See Attachment 2 – Photographs, position 10 (room 126) for images.
1.1.11. Position 11 (Room 127). Contractor shall replace the 5‐drawer cabinet. Contractor shall provide all hardware to install for the new cabinet. The new cabinet shall be the same configuration, style, material, and colors as the existing drawers. See Attachment 2 – Photographs, position 11 (room 127) for images. (Room 127), Replace five drawer bank cabinet, Installation of new cabinet, replace drawer boxes and slides in five drawer bank
1.1.12. Position 12 (Room 128). (Room 128), Contractor shall replace the 5 drawers in the cabinet.
Contractor shall provide new hardware for the new drawers for the cabinet. The new drawers shall be the same configuration, style, material, and colors as the existing drawers. See Attachment 2 – Photographs, position 12 (room 128) for images.
1.1.13. Position 13 (Room 132). Contractor shall replace hinges on cabinet doors (quantity 4 hinges)
Contractor shall adjust hinges on the sink base so the door closes properly. See Attachment 2 – Photographs, position 12 (room 128) for images.
1.1.14. Position 14 (Room 133). Contractor shall replace hinges on cabinet doors (quantity 4 hinges)
Contractor shall replace the 5‐drawer cabinet. Contractor shall provide all hardware to install for the new cabinet. The new cabinet shall be the same configuration, style, material, and colors as the existing drawers. Replace hinges on cabinet doors above sink‐ QTY 2 doors, replace five drawer bank at food service‐Yellow plastic laminate, replace and installation of new cabinet.
File details come from the government source that posted it. Updated .