Attachment 1 Performance Work Statement.docx

DOCX document 16 KB Posted

Attached to
Fiberglass Ball Transfer Walkable Deck Federal contract opportunity
Solicitation number
N3220522Q2210
Issued by
Department of the Navy Military Sealift Command

View the file

Other files for this federal contract opportunity

Other files attached to Fiberglass Ball Transfer Walkable Deck, newest first.
File Type Posted
Redacted Use of Other than Full and Open for SAT.pdf PDF
Combined_Synopsis_Solicitation_.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Title: Fiberglass Ball Transfer Walkable Deck Introduction: MSC has a requirement for a Fiberglass Ball Transfer Walkable Deck System that will allow efficient movement of material as part of a optimization plan at MSC Warehouse, Building W143, Norfolk Naval Base, Norfolk, VA.

Period of Performance: 20 September 2022 – 20 October 20222 Location: Naval Station Norfolk, Norfolk, VA Bldg W143 Scope: Military Sealift Command has an immediate requirement for the procurement and installation for a Fiberglass Ball Transfer Walkable Deck in support of “First in First Out” (FIFO) Warehouse optimization plan.

Background: MSC has limited warehouse floor space for quality assurance requirements and FIFO deck will increase productivity and lessen impact on Material Handling Equipment (MHE) and personnel support for material movement within a very small foot print.

Site Conditions: Site will be available Monday through Friday 0800 - 1700 (except for Federal Holidays). The Contractor is responsible for obtaining base access and following building security requirements.

Requirements.

General: The Contractor shall provide, and erect upon delivery, walkable transfer deck that will be used for material FIFO process to MSC Warehouse, Building W143, Norfolk Naval Base, Norfolk, VA 23511, 4th floor Cell C.

Specifications for the Transfer Walkable Deck:

1 - 38- 2” Fiberglass Panel ~144” x 96” x 2” 440 FT- Sideguide – 6” x 4” x .38” – length varies 228 - Fiberglass Clips 3 - Forklift Fiberglass Tineway Bumpers 4104 Steel transfer balls 120- 48” x 48” Transfer Pallet Board

Installation. Cell C, Bldg. W143. Roller deck access will be from Cell C Aisle way, moving towards the back and rotating left to create 3 lanes for material movement.