About this file

This is a Statement of Objectives for a procurement by the U.S. Fish and Wildlife Service to supply 24 aluminum water control structures for Merritt Island National Wildlife Refuge in Titusville, Florida.

The water control structures are 30-foot-long aluminum culverts with 30-inch or 36-inch diameter options, featuring a custom 48-inch-wide by 4-foot-high riser face to accommodate wooden boards that control water flow. The upgraded structures include bars on both ends to prevent manatees and people from becoming trapped inside. Deliverables consist of 11 units for Project BIOLAB (Line Item 0010), 7 units for Project T-10-L (Line Item 0020), 2 units for Project 24D (Line Item 0030), and 4 units for Project 15C (Line Item 0040), for a total of 24 structures. Delivery only is required; installation is not included. Specifications detail aluminum construction including a 14-gauge aluminum cap, 2" x 2" x ¼" aluminum angle bracing, and 2.25" x 3.0" x ¼" aluminum channel with 5 bars spaced 8 inches apart at each end. The period of performance requires final deliveries within 20 weeks of receipt of order. All units must be delivered to Merritt Island National Wildlife Refuge Complex, 1963 Refuge Headquarters Road, Titusville, FL 32780. Stanley Howarter serves as the point of contact for deliveries and specifications at (321) 861-8165 or stanley_howarter@fws.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Water Control Structures, Merrit Island, FL, newest first.
File Type Posted
Sol_140FS326Q0025.pdf PDF
Attachment_2_Past_Performance_Survey.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Merritt Island National Wildlife Refuge 24 Aluminum Water Control Structures

This project will provide the goods needed to replace storm damaged water control structures with upgraded water control structures (WCS) that will prevent manatees from entering the water control structure.

Water control structures are 30 foot long, 36 inch diameter aluminum culverts with custom 48 inch, four foot high riser face that will hold wooden board that control the level of the water that can flow through the culvert. The new upgraded structures have bars on either end to prevent manatees and people from getting stuck inside the structure.

This is for delivery of the WSC’s only installation is not required.

See Attached Drawing/Specifications Photo’s provided for assessment of scope (example of materials/constructed structure to be delivered) only

Point of Contact for Deliveries and Specifications: Stanley Howarter

Phone: (321) 861-8165 or email stanley_howarter@fws.gov

Delivery Location: Merritt Island National Wildlife Refuge Complex

1963 Refuge Headquarters Road

Titusville, FL 32780

Line Item 0010 Quantity 11 Mark for: Project BIOLAB

Line Item 0020 Quantity 7 Mark for: Project T-10-L

Line Item 0030 Quantity 2 Mark for: Project 24D

Line Item 0040 Quantity 4 Mark for: Project 15C

Period of Performance: Final Deliveries by 20 Weeks of Receipt of Order mailto:stanley_howarter@fws.gov