Attachment 1 N6660422R0081 Performance Based Milestones.pdf
PDF 118 KB Posted
- Attached to
- Hull Sensor Systems for DT-705A First Article and Production Sensor Assemblies Federal contract opportunity
- Solicitation number
- N66604-22-R-0081
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation N6660422R0081 Amendment 0001.pdf | ||
| Solicitation N6660422R0081.pdf | ||
| Exhibit B N6660422R0081_CDRLs_Redacted.pdf | ||
| Exhibit A N6660422R0081 CDRLs_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 Milestones (First Article Sensor Assemblies)
Severable/Cumulative Percent
CLIN 0001
Price
Milestone Completion Verification Method
1. Preliminary Configuration Review (PCR) Completion Severable 20%
PCR is conducted IAW the SOW. TPOC receives, reviews, and accepts contractor-submitted PCR presentation package and supporting technical documentation.
2. Final Configuration Review (FCR) Completion Cumulative - based on milestone #1
20%
FCR is conducted IAW the SOW. TPOC receives, reviews, and accepts contractor-submitted FCR presentation package and supporting technical documentation.
3. First Article material received Cumulative - based on milestones #1 and #2.
20% Contractor provides internal report to TPOC which provides proof of purchased material receipt (receipt report and date received).
4. Delivery of First Article sensor assemblies Cumulative - based on milestones #1, #2, and #3.
20% Contractor delivers First Article sensor assemblies and the Government receives them.
TOTAL: 80%
CLIN 0002 Milestones (Drawing Package)
Severable/Cumulative Percent
CLIN 0002
Price
Milestone Completion Verification Method
1. Final Configuration Review (FCR) completion Severable 50%
IAW CDRL A005, contractor submits draft copy of complete drawing package prior to FCR.
TPOC reviews and accepts noting any discrepancies identified during the FCR.
2. First Article-Physical Configuration Audit (FA-PCA) completion
Cumulative - based on milestone #1
10%
IAW CDRL A005, contractor submits complete drawing package prior to FA-PCA. TPOC reviews and accepts noting any discrepancies identified during the FA-PCA.
3. Functional Configuration Audit/Physical Configuration Audit (FCA/PCA) completion
Cumulative - based on milestones #1 and #2
20%
IAW CDRL A005, contractor submits complete drawing package prior to FCA/PCA. TPOC reviews and accepts noting any discrepancies identified during the FCA/PCA.
TOTAL: 80%
CLIN 0003 Milestones (Production) Severable/Cumulative Percent
CLIN 0003
Price
Milestone Completion Verification Method
1. Drawings and Production Documentation released. Severable 15%
DCMA representative receives, reviews, and accepts contractor-submitted Product Baseline Drawing listing and supporting technical documentation. Contractor provides internal report to DCMA representative which provides proof of release of production documentation.
2. Material Ordered Cumulative - based on milestone #1
15%
Contractor provides internal report to DCMA representative which provides proof that the material was ordered (PO number and date issued).
3. 90% of material line items received.
Cumulative - based on milestones #1 and #2
20%
Contractor provides internal report to DCMA representative which provides proof that the material was received against the purchase orders (PO) which were placed.
TOTAL: 50%
Solicitation N66604-22-R-0081 Attachment #1 DT-705A Sensor Assemblies
Performance Based Milestone Payments