MRG SFD 60 TON TRANSPORT TRAILER
Solicitation number
140R4025Q0057
Issued by

About this file

This document is a Statement of Work (SOW) for the Bureau of Reclamation's Upper Colorado Region Albuquerque Area Office Socorro Field Division, detailing the procurement of a new 60-ton transport trailer for 2025. The trailer specifications require a 4-axle configuration with a drop-down fourth axle, an extendable deck ranging from 20 to 30 feet, and adjustable outriggers extending from 8.5 to 10 feet. Key requirements include DOT compliance, structural integrity to support 60-ton payloads, multi-position ride height, LED lighting, minimum of 18 D-rings for tie-downs, and air ride suspension with ABS brakes.

The solicitation (No. 140R4025Q0057) mandates specific submittal requirements, including English-language documents compliant with Section 508, and U.S. customary measurements. Vendors must submit manufacturer's trailer details, product data, dealer information, and warranty information within 28 days of contract award. Delivery will be to the Socorro Field Division in Socorro, NM, with setup and orientation included. The trailer must be warranted for a minimum of 12 months, and delivery can be scheduled Monday through Thursday between 7:00 AM and 5:30 PM, with potential Friday arrangements with 24-hour notice.

View the file

Other files

File Type Posted
Sol_140R4025Q0057_Amd_0001.pdf PDF
Attachment_3_-_Amd_0001_Qs_As_0001.docx DOCX document
Sol_140R4025Q0057.pdf PDF
Attachment_2_-_Price_Schedule_-_MRG_SFD_Boom_Mower.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Header for this page Header

Description/Specifications Bureau of Reclamation- Upper Colorado Region- Albuquerque Area Office Socorro Field Division- Purchase of one 2025 Transport Trailer.

NAIC 336212 – Truck Trailer Manufacturing

Abbreviations, Definitions, and Acronyms The Bureau of Reclamation commonly used definitions are listed below:

AAOAlbuquerque Area Office
BORBureau of Reclamation (Reclamation)
COContracting Officer
COTRContracting Officer Technical Representative
FARFederal Acquisition Regulation
GPMGallons per Minute
HPHorsepower
LBPounds (lb or lbs)
PSIPounds per Square Inch
RPMRevolutions Per Minute
MPHMiles Per Hour
PTOPower take-off
BTUBritish Thermal Unit
UCUpper Colorado Region
SFD Socorro Field Division

Foreword The Bureau of Reclamation, Upper Colorado Region, Albuquerque Area Office, Socorro Field Division (Reclamation) has determined a need for the purchase of One New 60-ton transport trailer to support the transportation of heavy machinery, construction equipment, and oversized loads. To meet operational demands, the trailer must feature a 4-axle configuration with the last axle being a drop-down axle, an extendable deck ranging from 20 to 30 feet, and adjustable outriggers extending from 8.5 to 10 feet to ensure load stability. Acquiring this trailer is essential to maintaining efficiency in ongoing and future projects, as it will allow for safe and reliable transport of critical equipment.

2025 60-Ton Transport Trailer Salient Characteristics

The selected contractor shall supply one new, 2025 60 Ton Transport Trailer that is safe and fully operational. The unit should be equivalent to or exceed the performance of the Cozad 60 Ton Transport Trailer. The required features include:

1. 60 Ton Trailer Minimum Specifications

· 4-Axle Configuration

· The 4th Axle being a drop-down Axle (Not a drop flip axle)

· Extendable Trailer Deck

· Minimum Retractable of 20’

· Minimum Extended of 30’

· Outriggers

· Extending from 8 ½’ to 10’

· Trailer Compliance

· To meet or exceed DOT Compliance

· Structural Integrity

· Support a payload of up to 60 Tons, considering both static and dynamic loading conditions

· Multi-Position Ride Height

· Successful vendor shall provide a Multi Position Ride Hight Option

1. Easily adjusting for various 5th wheel heights and allows for larger ground clearance or lower deck height.

The picture below shows an example of a multi-position ride Hight.

· Deck Extension or Axle Lowering

· Air, Electrical, or hydraulic System (If necessary for deck extension or axle lowering.

· Clearance & deck height

· Minimum 8 inches (maximum 10 inches) of ground clearance when loaded.

· Minimum of 22 inches (maximum 24 inches) deck height when loaded.

· Clearance & deck height

i. Minimum 8 inches (maximum 10 inches) of ground clearance when loaded.

ii. Minimum of 22 inches (maximum 24 inches) deck height when loaded.

· Wet-ready Construction for Hydraulic operation

· Successful vendor shall be compliant with SFD hydraulic Systems, Product code 2FF134-34SAE-M, ¾ flush face plug X ¾” Female boss and 2FF134-1NPT-F, ¾ flat face coupler X 1” FNPT

· Lighting

· LED lighting installed, including rear lighting.

· Tie downs & Flagging:

· Minimum of 10 D-rings on each side of the outer frame spaced out evenly.

· Minimum of 8 D-rings on the inner frame (each side) spaced out evenly.

· Flag holders on all four corners of the trailer.

· Miscellaneous

· Strobe lights installed, exceeding minimum requirements.

· Hydraulic removable gooseneck, with an 8-foot narrow design.

· Trailer shall have a boom and bucket well.

· Trailer Axles, Wheels, Tires, Suspension

· Axles

1. 4 Axles Including a drop Axle as the 4th Axle.

· Wheels & Tires

1. 16 tire stretch trailer configurations

2. Steel Wheels with industry-standard tires

· Suspension & Breaks

1. Air Ride Suspension

2. Brakes equipped with self-adjusting slack adjusters and ABS.

2. Submittal Requirements

· Language: All documents must be prepared in English.

· Accessibility: Submitted documents must comply with Section 508 requirements.

· Labeling: Each submittal must include the contract number, title, and the Required Submittal Number (RSN).

· Measurement Units: Use U.S. Customary Units.

· Tracking: Assign a unique transmittal tracking number to each submittal.

· Certifications:

· Required certifications must be conducted by a registered professional.

· Manufacturer’s certifications must be signed by an authorized representative.

3. Government Review Process

· Review Time: The Government requires a minimum of 14 days to review and/or approve each submittal or resubmittal unless otherwise specified.

· Additional Time: If extra review time is needed, the Contracting Officer may extend the contract completion date accordingly.

4. Submittal Categories

· A – Action: Requires Government approval.

· I – Informational: Requires Government review and written receipt.

5. Submission Process

· Submit electronic copies for review and approval to Johnny Jaramillo at jjaramillo@usbr.gov.

Submittal Table A

RSN
Required Submittal and Description
Due Date or Delivery Time
Type
S1
Manufacturer’s 60 Ton Transport Trailer as listed in the SOW.
Within 28 days after contract award
A
S2
Manufacturers or Supplier’s Product Data and General Information for all new equipment and accessories
Within 28 days after contract award
A
S3
Manufacturer’s recommended dealers list for repairs, maintenance, and warranty work for within 180 miles of Socorro, New Mexico.
Within 28 days after contract award
I
S4
Manufacturer’s Product Warranty Information
Within 28 days after contract award
I
S5
Project Schedule shall include the proposed date and time for delivery and employee orientation.
Within 28 days after contract award
I

Warranty Equipment supplied under these contract specifications shall be under warranty where applicable to be free of such defects in workmanship as appears under normal use, service, operation, and when owned by the original purchaser. Warranty option should be supplied for the maximum extent beneficial for the Government but cannot be less than 12 months/one year.

Delivery of Equipment The awarded contractor shall provide the Government with a proposed delivery date and time within 28 calendar days of award for scheduling and coordinating purposes.

Site Visit, Delivery, and Setup A. It shall be the responsibility of the contractor to arrange delivery to Bureau of Reclamation, Socorro Field Division, Socorro, NM 87801. Socorro Field Division will accommodate delivery needs during normal business hours of Monday thru Thursday 7:00am – 5:30pm. (Special arrangements can be made on Fridays if given 24hrs notice) Include all costs for shipping, setup, and orientation for SFD/Reclamation’s personnel. Please contact the following:

Tomas Rosales, “Acting” Facility Manager Bureau of Reclamation Socorro Field Division 2401 State Road 1, P.O. Box VV, Socorro, NM 87801-2170 Phone No: (575) 835-1202 Cell No: (575) 517-0518 Email: TRosales@usbr.gov

Brian Skornia, Construction Control Representative Bureau of Reclamation Socorro Field Division 2401 State Road 1, P.O. Box VV, Socorro, NM 87801-2170 Phone No: (575) 838-1202 Cell No: (505) 388-8324 Email: bskornia@usbr.gov

Johnny Jaramillo, “Acting” Construction Control Representative Bureau Of Reclamation Socorro Field Division 2401 State Road 1, P.O. Box VV, Socorro, NM 87801-2170 Phone No: (575) 838-1202 Cell No: (575) 517-5602 Email: jjaramillo@usbr.gov

Waylon Billie, “Acting” Construction Control Representative Bureau Of Reclamation Socorro Field Division 2401 State Road 1, P.O Box VV, Socorro NM878001-2170 Phone No: (575) 838-1202 Cell No: (575) 517-0614 Email: wbillie@usbr.gov

B. Successful contractor shall protect all parts/equipment from corrosion, deformation, dents, dings, scratches, breaks, punctures, abrasions, cuts, and other types of damage during storage, handling, transport, and delivery.