Attachment 1_List of Salient Features-Pavement Marking Machine.pdf

PDF 252 KB Posted

Attached to
Pavement Marking Machine Federal contract opportunity
Solicitation number
W911KF23Q0051
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This document provides the specifications for a pavement marking machine and ride-on attachment required by the Anniston Army Depot. The specifications call for a Graco Linelazer V 200MMA 1:1 pavement marking machine with two high pressure reflective series dual fusion guns compatible with Roadzilla MMA paint. The ride-on attachment must be a Graco LineDriver HD with an LED light system, dual foot pedal system, and Honda engine. The contractor must provide operator and maintenance manuals, spare parts lists, a 12-month warranty, and training within two weeks of delivery to Anniston, Alabama. The related federal contract opportunity is solicitation number W911KF23Q0051 from the Department of the Army Materiel Command Contracting Command Detroit Arsenal to provide the specified pavement marking machine and ride-on attachment.

View the file

Other files for this federal contract opportunity

Other files attached to Pavement Marking Machine, newest first.
File Type Posted
W911KF23Q0051 Amendment 01 approved.pdf PDF
Attachment 2_Request for Technical Literature-Pavement Marking Machine.pdf PDF
W911KF23Q0051 approved.pdf PDF
Attachment 3_Evidence of Authority to Sign Offers.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

List of Salient Features

Pavement Marking Machine with Ride‐On A achment

1. Scope: The Anniston Army Depot currently u lizes Graco products. The specifica ons found in this document are for a Graco Linelazer V 200MMA 1:1 with a Graco LineDriver

HD Ride‐On A achment. An “equal to” this product is acceptable if it meets the requirements set forth in this document and in manufactures product literature. Sprayer must be compa ble with MMA (Methyl Methacrylate) two‐component traffic paint.

2. Requirements: Pavement Marking Machine (Graco Linelazer V 200MMA 1:1) (Part

Number: 17Y512)

HP (high pressure) Reflec ve Series Dual Fusion Guns (2 guns)

MMA 1:1 mixing.

Automa c gun se ngs

Fusion air‐purge gun to prevent MMA hardening in gun hose.

LiveLook™ Display with SmartControl™

Pressurized Bead System

On‐board compressor

Pressurized bead tank

Bead gun ac vates automa cally with spray gun

Bead gun with gun‐delay ability

Adjustable nozzle for bead dispensing width adjustment

Interchangeable nozzles to allow for different size beads or grain

3. Requirements: LineDriver HD Ride‐On A achment (Part Number: 262005)

LED (light emi ng diode) Light System

Dual Foot Pedal System

Honda® GX Engine

Cool‐Comfort Seat

Gray color

High‐back seat

4. Important note: Pavement marking machine MUST be compa ble with Roadzilla Yellow

1:1 Spray MMA Part A and B: NSN 8010AD0000239 SDS 1007644 and 1007645 and other Roadzilla MMA colors. Roadzilla is the only MMA paint approved for use on

Anniston Army Depot. Compa bility with Roadzilla MMA paint is a major requirement of this specifica on.

5. Operator Manuals: An Operator Manual shall be furnished to include opera ng instruc ons explaining preven ve maintenance procedures, methods of checking the Equipment for normal safe opera on and procedures for safely star ng and stopping the system manually. The Operator Manual shall include the step‐by‐step procedures required for Equipment startup, opera on, and shutdown.

6. Maintenance Manuals: Maintenance manuals shall include electrical, hydraulic, and pneuma c schema cs, as applicable, detailed lockout/tag out procedures, parts lists, troubleshoo ng procedures, preven ve maintenance requirements, lubrica on schedule and any other maintenance procedures normally provided by the Contractor. Schema cs shall show and iden fy all parts. Schema c diagrams showing equipment u lized, including motor horsepower and voltage; starter; isolators; manual bypasses; tubing sizes; drain piping and drain traps; reducing valves; and data on manufacturer's names and model numbers, moun ng, access, and clearance requirements. Data shall include calcula ons of all u lity consump on.

7. Spare Parts List: Spare Parts Lists shall be furnished complete with OEM part numbers, Na onal Stock Numbers (if applicable), part descrip ons, required quan es, prices, and normal delivery me for the items.

8. Warranty: The Equipment shall be covered by a warranty. The warranty shall be for a period of no less than 12 months or 2,000 hours, whichever comes first. The warranty shall begin on the date of delivery.

9. Delivery: The Contractor shall be responsible for delivering the Equipment to Building 4 at Anniston Army Depot, 7 Frankford Avenue, Anniston, Alabama, 36201. Due to a modified work schedule the Anniston Army Depot will NOT receive shipments/deliveries on Fridays.

10. Shipping: (As equipment applicates) The Contractor shall be responsible for cra ng and shipping the Equipment and all associated material and components. The cra ng shall protect the Equipment from damage and weather during handling, shipping, and storage of the Equipment.

11. Training: The Contractor shall provide a training class for up‐to 10 people no later than 2 weeks a er delivery. Scheduling of training shall be discussed prior to or at the me of delivery.

File details come from the government source that posted it. Updated .