Attachment 1 - Items List.pdf

PDF 80 KB Posted

Attached to
801 RHS Simulator Federal contract opportunity
Solicitation number
F4ATD14225A001
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a Request for Quote (RFQ) for a federal contract opportunity to acquire a construction equipment simulator and associated conversion kits and accessories.

The solicitation number is F4ATD14225A001 for the "801 RHS Simulator" requirement. It is a total small business set-aside with a North American Industry Classification System (NAICS) code of 333310 (Small Business Size Standard of 1,000 employees). The anticipated contract type is Firm Fixed Price (FFP). The key details include a list of required equipment and accessories outlined in Attachment 1, a 90-day delivery requirement to Nellis AFB, Nevada, and a quote due date of 04 September 2024 at 12:00 PM PDT. Quotes will be evaluated on a lowest-priced, technically acceptable (LPTA) basis. The contracting agency is the Department of the Air Force Air Combat Command.

View the file

Other files for this federal contract opportunity

Other files attached to 801 RHS Simulator, newest first.
File Type Posted
Combo Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F4ATD14225A001 - 801 RHS Simulator

Attachment 1 – Items List

**THIS IS A BRAND NAME OR EQUAL REQUIREMENT**

CLIN Description Part Number MFR QTY UOM 0001 Simulator Base Unit on 120v Motion -

2 ext tube option-sold with conv kits, G4-CBU-M-2 or Equal Simformotion LLC 1 Each

0002 Simulator Mobility Kit- for Motion W/ Rear TV, G4-MBL-KIT-M-2 or Equal Simformotion LLC 1 Each

0003 Backhoe Loader Conversion Kit (Rear Monitor & Stand)

G4-BHL-CONV1 or Equal Simformotion LLC 1 Each

0005 Next Gen Dozer Conversion Kit, G4-NGD-CONV3-NS or Equal

Simformotion LLC 1 Each

0006 Excavator Conversion Kit Level 1 Training, G4-EXC-CONV3-NS or Equal

Simformotion LLC 1 Each

0007 Articulated Truck Conversion Kit, G4-AT-CONV3-NS or Equal Simformotion LLC 1 Each 0008 Small Wheel Loader Conversion Kit

Level 1 Training, G4-SWL-CONV3-NS or

Equal Simformotion LLC 1 Each

0009 Technical Support 3 Yr. Subscription, SPPT36 or Equal Simformotion LLC 1 Each 0010 Delivery & Installation N/A N/A 1 Each

***PLEASE SEE BELOW FOR REQUIRED SPECIFICATIONS***

Equipment Simulator Controls:

1. Equipment Simulator Mobile Unit

a. Motion base for enhanced realism

b. Steering wheel with FNR controls

c. Required software and licenses

d. Interchangeable track or traffic pedals

e. Three screens set up to monitor all plant functions (24” screen minimum)

i. Touch screen

f. Driver seat with seatbelts.

g. Plant graphics color display with user friendly animation

h. Joysticks with quick-swap

i. Spoken alarms announced in English with comprehensive alarm logging

j. Control stem for signals, horns, and lights

k. Able to walkthrough controls and settings for start-up, operating, and shut down

l. Provides learning programs per piece of equipment

i. Benchmarks

ii. Has lesson plans, guides, and assessments

m. Provides performance measurements

i. Tasks completed and time

ii. Collisions

iii. Rough loading and operating

iv. Idle and cycle time

v. Fuel consumption

vi. Safety violations

2. Equipment

a. Crane

i. LMI configuration and alarms

ii. Hook and load management

iii. Changing parts of lines with pulley block

iv. 30-ton crane

v. 50-ton crane

b. Excavator

i. Wheel

ii. Tracked

c. Loader

d. Dozer

e. Grader

f. Mobile Crane

g. Semi-Truck with Trailer

h. Forklift

i. Telescopic Handler

j. Articulated Hauler

k. Dozer

l. Asphalt Paver

m. Backhoe

n. Compact Track Loader

3. Installment

a. Installation and successful testing require for acceptance

b. Equipment Power Requirement must be able to be met by US standard 120V

Calibration & Maintenance:

1. Step by step calibration for all metering parameters

2. Diagnostic Trouble Shooting Screens

3. Required software licenses for equipment types

4. Annual maintenance schedule for quarterly preventive maintenance (dates will be scheduled with customer upon award) for a total of three (3) years

Warranty:

1. Standard Commercial Warranty

a. Software Updates

b. Remote Diagnostic Support

Training:

1. Conduct initial set-up and operations training.

File details come from the government source that posted it. Updated .