USS THEODORE ROOSEVELT (CVN-71) CIS Pipe Insulation and Lagging Services Package No. 2 Solicitation
Solicitation number
N5523623Q0129
Issued by

View the file

Other files

File Type Posted
AMEND 0001 Q0129.pdf PDF
SOLICITATION Q0129.pdf PDF
Attachment 2 - RFC.docx DOCX document
TechDocRequestForm.pdf PDF
SOLICITATION Q0129.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITEMIZED PRICING

CONTRACT:PIPE LAGGING SERVICES
CONTRACTOR:
PURCHASE ORDER:
SHIP:USS THEODORE ROOSEVELT (CVN-71)
LOCATION:NAVY REGION SOUTHWEST
ITEM NO CLINDESCRIPTIONQTYUNIT OF ISSUEUNIT PRICEEXTENDED AMOUNT
0001COMMERCIAL INDUSTRIAL SERVICES (CIS) PIPE LAGGING SERVICES CONTRACT FOR THE REMOVAL OF EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS AND/OR INSTALLATION OF NEW AND/OR EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS ONBOARD THE USS THEODORE ROOSEVELT (CVN-71) PACKAGE NO. 21LOT$0.00
REMOVAL, DISPOSAL AND INSTALLATION REQUIREMENTS:

The Contractor shall provide labor services, equipment, laboratory testing, and materials for the removal and disposal of all existing piping insulation, lagging and/or reusable covers for the locations and system identified in the Purchase Order. Removal and disposal requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

INSTALLATION REQUIREMENTS:

The Contractor shall provide labor services, equipment, laboratory testing, and materials for the installation of new pipe lagging, insulation, lagging pads, and/or reusable covers for the locations and system identified in the Purchase Order. The Contractor shall accomplish the cleaning and painting requirements for new piping insulation, lagging, and/or re-usable covers to match surrounding areas. The Installation and painting requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

CNAF-L0583-210-0-Q WATER HEATER # 7110 LFPipe size: Three and one-half (3 1/2) inch NPS and smaller TEMPERATURE OF 126 TO 400 DEGREES
CNAF-L0583-235-1-Q WATER HEATER # 852 LF
CNAF-L0583-235-1-Q WATER HEATER # 952 LF
CNAF-L0582-28-2-L WATER HEATER # 1015 LF
CNAF-L0582-44-3-L WATER HEATER # 1115 LF
CNAF-L0583-235-1-Q WATER HEATER # 826 LFPipe size: Four (4) inch NPS to nine (9) inch NPS TEMPERATURE OF 126 DEGREES AND HIGHER
CNAF-L0583-235-1-Q WATER HEATER # 926 LF
CNAF-L0583-210-0-Q WATER HEATER # 769 SFPipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc. TEMPERATURE OF 401 DEGREES
CNAF-L0583-235-1-Q WATER HEATER # 858 SF
`CNAF-L0583-235-1-Q WATER HEATER # 958 SF
CNAF-L0582-28-2-L WATER HEATER # 1024 SF
CNAF-L0582-44-3-L WATER HEATER # 1122 SF
NEW MILESTONE EVENTDATE
PURCHASE ORDER START DATE7-Jul-2023
PURCHASE ORDER END DATE21-Jul-2023
NOTES:
1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the Itemized Pricing listed in the scope of work.
2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aa), and the requirements of the Itemized Pricing listed in the scope of work.
3. Independent Government Estimate (IGE) of the Unit Price was based on comparable work requirements (Delivery Orders) executed under contract number N55236-2-19-D-0001