ATTACHMENT 1_Itemized_Pricing.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- N5523623Q0055
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23Q0055_SOW.docx | DOCX document | |
| N5523623Q0055_SF18_Solicitation.pdf | ||
| 23Q0055_ATTACHMENT 2_RFC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ITEMIZED PRICING SHEET | |||||
| CONTRACT: | PUMP AND MOTOR CONTINGENCY | ||||
| CONTRACTOR: | |||||
| DELIVERY ORDER: | |||||
| SHIP: | USS JOHN P MURTHA (LPD-26) | ||||
| LOCATION: | NAVY REGION SOUTHWEST | ||||
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE | |
| ER01-1698 | PLUMBING WASTE DRAIN PUMP AND MOTOR UNIT ASSEMBLY | 1 | |||
| ELIN 0001 | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (OFFLOAD AND ONLOAD), CRANE SUPPORT AND TRANSPORTATION OF THE PLUMBING WASTE DRAIN PUMP AND MOTOR UNIT ASSEMBLY FROM THE DIRT LOT TO THE SHOP FOR REPAIRS AND DELIVER REPAIRED PLUMBING WASTE DRAIN PUMP AND MOTOR UNIT ASSEMBLY BACK TO THE DIRT LOT IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK (SEE NOTE 4) | 1 | $0.00 | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| ER01-1698 | PLUMBING WASTE DRAIN PUMP AND MOTOR UNIT ASSEMBLY | 1 | ||
| ELIN 0002 |
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE PLUMBING WASTE DRAIN PUMP IN ACCORDANCE WITH TECH MANUAL S6226-SS-MMC-010 TO INCLUDE REPLACEMENT OF THE SHAFT SLEEVES, BEARINGS, LUBRICATION FITTINGS, O-RINGS, GASKETS, SLINGERS, MECHANICAL SEAL, CASE AND WEARING RINGS.
ACCOMPLISH THE OVERHAUL OF THE PLUMBING WASTE DRAIN MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-113 TO INCLUDE THE INSTALLATION OF NEW BEARINGS, THERMISTORS, SEALS, O-RINGS, GASKETS, FITTINGS, LOCK WASHERS, LOCKNUTS, FLEXIBLE CONNECTORS, FLEXIBLE CONDUIT AND GROUND STRAPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTES 1 AND 2) 1 $0.00 $0.00
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE | |
| ER01-1698 | PLUMBING WASTE DRAIN PUMP AND MOTOR UNIT ASSEMBLY | 1 | |||
| ELIN 0003 | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP OPERATIONAL TEST THE OVERHAULED PLUMBING WASTE DRAING PUMP AND MOTOR UNIT ASSEMBLY | 1 | $0.00 | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE | |
| ER01-1698 | PLUMBING WASTE DRAIN PUMP AND MOTOR UNIT ASSEMBLY | 1 | |||
| ELIN 0004 | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF THE PLUMBING WASTE DRAIN PUMP MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-32 | 1 | $0.00 | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| ER01-1698 | PLUMBING WASTE DRAIN PUMP AND MOTOR UNIT ASSEMBLY | 1 | ||
| ELIN 0005 |
PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTE 3) 1 $0.00 $0.00
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| ER01-1698 | PLUMBING WASTE DRAIN PUMP AND MOTOR UNIT ASSEMBLY | 1 | ||
| ELIN 0006 |
PROVIDE LABOR, MATERIAL SERVICES AND EQUIPMENT TO FABRICATE (WOOD) AND FULLY CRATE OVERHAULED PLUMBING WASTE DRAIN PUMP AND MOTOR IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTE 5) 1 $0.00 $0.00
TOTAL $0.00
| OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of a modification to the purchase order. | ESTIMATED AMOUNT | UNIT OF ISSUE | FBLR for ELIN 0009. MATERIAL HANDLING RATE FOR ELIN 0010 | TOTAL | |
| ELIN 0009 | ADDITIONAL WORK - LABOR Estimated Straight Time (ST) Man-hours - 100 HRS |
ST Fully Burdened Labor Hour Rate $________
| NOTE: The offeror’s proposed fully burdened labor rate (FBLR) is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 100 | HR | $0.00 |
| ELIN 0010 | ADDITIONAL WORK - MATERIALS | ||
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a purchase order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. | 60,000.00 | DOLLARS, US | 0% |
| MILESTONE EVENT | DATE |
| 1. Delivery Order Start Date | 9-Feb-22 |
| 2. Remove and transport to shop | 9-10-Feb-2023 |
| 3. Overhaul, Shop Test and delivery to Dirt Lot | 09 Feb to 9 Mar- 2023 |
| 4. Delivery Order End Date | 9-Mar-2023 |
| NOTES: | |
| 1. In the event the requirements stated in the SOW has changed from NAVSEA Standard Item 009-113 to 009-17 as a result of the disassembly inspection, the Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR listing the recommendations of repair requirements to the SBS. The change in scope will require the Contractor to submit a revised estimated cost towards the performance of the new repair recommendation. | |
| 2. Refer to Technical Manual S6226-SS-MMC-010, Technical Manual 1A Plumbing Waste Drain Pump for detailed procedures overhaul of the Plumbing Waste drain Pump and Motor Unit Assembly to include shop operational testing. | |
| 3. If machining hours is required, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S6226-SS-MMC-010, Technical Manual 1A Plumbing Waste Drain Pump. | |
| 4. Pick up existing Plumbing Waste Drain Pump and Motor Unit Assembly from NAVBASE dirt lot across Floating Crane Pier and North of Pier-9 and deliver repaired Pump and Motor back to the dirt lot. | |
| 5. The Contractor shall fully crate overhauled Plumbing Waste Drain Pump and Motor Unit Assembly to protect from the elements. The Contractor shall also secure crate on to a pallet and delivery to the dirt lot for pick-up and tranportation by the Maintenance Team. |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .