Attachment 1 HRMC-014-21.pdf
PDF 20 MB Posted
- Attached to
- Rigid Inflatable Boats Federal contract opportunity
- Solicitation number
- N32253-21-Q-0045
About this file
This solicitation requests proposals for servicing Rigid Hull Inflatable Boats. Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility seeks a qualified contractor to service RHIBs in accordance with HRMC-014-21 at the contractor's Oahu, Hawaii facility. This small business set-aside solicitation was issued as RFQ N32253-21-Q-0045 with a delivery date of 30 September 2021. The solicitation closes on 17 May 2021 and submissions must be emailed to the points of contact listed. A ship check will be conducted on 12 May 2021 for interested parties with base access to Pearl Harbor. Proposals must follow the CLIN structure in the solicitation and include pricing for CLIN 0001. Sections 52.204-24, 52.204-26, and 52.212-3 must also be completed by offerors. Proposals will be evaluated based on the addendum to FAR 52.212-2 factors. The soliciting agency is the Department of the Navy Naval Sea Systems Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 LSI 099-1 thru 07 and 099-40 (FOUO removed).pdf | ||
| N32253-21-Q-0045.pdf | ||
| Attachment 4 099-010PH RMMCO Check-In v01 2014 updates.pdf | ||
| Attachment 6 Environmental Guide for Ktr on Ship Projects.pdf | ||
| Attachment 2 SECREQS FOR CIA CNIA NWA REV AUG2013 (2).pdf | ||
| Attachment 5 OSHContractor MOA 27May2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HRMC-014-21
INDEX
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT .
CATEGORY I. FY-22 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM NO. T IT LE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 10/01/2019 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original
009-03 Toxic and Hazardous Substance; control 10/01/2019 Original
009-04 Quality Management System; provide 10/01/2019 Original
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; 03/06/2020 Original accomplish
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; 02/21/2021 CH-1 accomplish
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 02/21/2021 CH-1
009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original
009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original
009-19 Provisioning Technical Documentation (PTO); provide 10/01/2018 Original
009-20 Government Property; control 10/01/2017 Original
009-21 Logistics and Technical Data; provide 10/01/2018 Original
009-23 Interference; remove and install 10/01/2018 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; 10/01/2019 Original accomplish
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual 10/01/2018 Original for Commercial EquipmenUComponent; accomplish
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at 10/01/2019 Original a Naval Facility; provide
009-60 Schedule and Associated Reports for CNO Availabilities; provide and manage 02/21/2021 CH-1
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original
009-67 Integrated Total Ship Testing; manage 04/30/2018 Original
009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and 10/01/2019 Original
Housekeeping for Unmanned Vessels; accomplish
009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, 10/01/2018 Original and repair
009-74 Occupational, Safety and Health Plan; accomplish 02/21/2021 CH-1
009-80 Ship Facilities; maintain 11/18/2016 Original
009-81 Compartment Closeout; accomplish 10/01/2019 Original
009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original
009-84 Threaded Fastener Requirements; accomplish 03/06/2020 Original
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution 03/06/2018 Original
Prevention Act (PPA) Information; provide
009-99 Ship Departure Report; provide 07/18/2014 Original
009-100 Ship's Stability; maintain 03/06/2018 Original
009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original
File details come from the government source that posted it. Updated .