ATTACHMENT 1 HMF HVAC Service and Repair PWS Draft.pdf

PDF 2 MB Posted

Attached to
Base Elizabeth City HVAC Maintenance and Repair Services
Solicitation number
70Z08423DOL930006
Issued by

About this file

This sources sought notice is seeking capable firms to provide preventative maintenance and repair services for HVAC equipment at the Heavy Maintenance Facility located at U.S. Coast Guard Base Elizabeth City, North Carolina. Interested parties must respond by April 13, 2023 with capability statements, past performance on similar contracts, business size, SAM registration, and teaming details if applicable. The requirement includes inspection, maintenance, and emergency repairs for various HVAC units and systems. The period of performance is one base year plus four option years. The NAICS code is 238220 and the size standard is $19 million. The notice requests information to determine acquisition strategy and whether a small business set-aside is appropriate.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR MAINTENANCE AND REPAIR OF HVAC EQUIPMENT AT THE HEAVY

MAINTENANCE FACILITY (HMF) AT USCG BASE ELIZABETH CITY, NC

GENERAL

BACKGROUND

This contract encompasses preventive maintenance and services (PMS) for all heating, ventilation, and air conditioning (HVAC) systems for the Heavy Maintenance Facility (HMF) located at U.S. Coast Guard Base Elizabeth City. The HMF is divided up between HMF #1, HMF #2, and HMF Machine Shop located at 1060 Consolidated Rd, Elizabeth City, NC 27909. The entire HMF accounts for approximately 230,151 Sq-Ft of depot level fixed wing hangar and shop space to support the U.S. Coast Guards Aviation Logistics Command (ALC) mission.

SCOPE

The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to inspect, maintain, and complete emergency repairs to the various HVAC equipment located at the HMF at Base Elizabeth City, NC.

OBJECTIVE

The Contractor shall perform all work to ensure the continuous, safe, and efficient operation of the HVAC equipment detailed in Exhibit #2, and to provide HVAC equipment repair services as specified within paragraphs 2.6.

APPLICABLE DOCUMENTS

The Contractor shall comply with all applicable sections of the Code of Federal Regulations and other federal, state, and local laws, codes, regulations, and procedures that are applicable to the maintenance and repair of HVAC equipment covered under this contract.

PERFORMANCE REQUIREMENTS SUMMARY

This contract includes a performance requirements summary (PRS) at paragraph 11.0. The PRS plays an integral role in the administration of the contract. In addition to any applicable inspection clauses or other related terms and conditions contained in the contract, the PRS shall serve as a primary tool for inspection and acceptance of services as facilitated by the Contracting Officer’s Representative (COR).

Evaluation of the Contractor’s overall performance shall be in accordance with the performance standards set forth in the PRS, and will be conducted by the COR. The PRS constitutes a material aspect of the contract and will not be changed or otherwise modified without prior written approval of the Contracting Officer.

SPECIFIC REQUIREMENTS AND TASKS

General Requirements

2.1.1 Security: The Contractor shall abide by all security and force protection policies in effect on Base Elizabeth City. Security and force protection procedures on the installation may include, but are not limited to, personnel screening, installation access and identification procedures, vehicle search requirements, restricted area access, and parking restrictions. The Contractor shall be aware that security and force protection procedures may change due to changes in the local Force Protection Condition level.

2.1.2 Vehicle Operation: The Contractor shall obey all speed limits and traffic signs. Disobeying traffic regulations may result in the loss of on-base driving privileges.

2.1.3 Theft: The Government will not be liable for any lost, stolen, or damaged vehicles, working materials, tools, equipment, and personal items.

2.1.4 Unscheduled Interruptions: The work under this contract occurs on a military base. Delays or additional response time due to military activities are part of the environment and cannot be considered cause for an adjustment in price. Maintenance operations are subject to unscheduled interruptions and maintenance personnel may be required to immediately leave the designated area or be denied access due to unforeseen circumstances. All uncompleted work requirements will be rescheduled at a later date.

2.1.5 Medical Emergencies and Fire Protection: In case of an emergency, dial 911.

2.1.6 Safety & Health Requirements: The Contractor shall comply with federal, state, and local laws with regard to safety and health standards.

2.1.7 Hazardous Materials & Environmental Compliance:

2.1.7.1. The Contractor shall comply with all federal, state, and local regulations and base policies regarding the use, evacuation, containment, storage, transportation, and disposal of hazardous materials and waste. The Contractor shall provide site-specific plans to address known environmental concerns for minor and major repair work. Any plans shall be submitted to the COR seven (07) calendar days prior to the performance of any work. The Contractor shall not initiate minor or major repair work until a plan has been approved by the COR.

2.1.7.2. Hazardous materials used or generated in the performance of this contract shall be controlled and disposed of by the Contractor in a manner that is safe and in accordance with federal, state, and local laws. The Contractor shall clean-up all hazardous and non-hazardous spills when they occur as a result of the Contractor’s work. Safety Data Sheet (SDS) information shall be available onsite for all products used during the course of the Contractor’s work. The Contractor shall provide for the transportation and disposal off Base Elizabeth City of all hazardous and non-hazardous waste products generated in the performance of this contract. The Contractor shall immediately notify the COR of any HAZMAT spill.

2.1.8 The use of illegal drugs or the consumption of alcohol is prohibited on federal property. Violators will be prosecuted.

2.1.9 Smoking is only authorized at designated locations.

Work Control and Management

2.2.1 The Contractor shall implement all necessary work control procedures to ensure timely completion of work, as well as to permit tracking of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein.

2.2.2 The Contractor shall provide an emergency response telephone number to the COR and the Contracting Officer upon contract award. This number shall be available 24 hours a day, 7 days a week.

Equipment Validation The Contractor is required to visually inspect each piece of HVAC equipment listed in Exhibit #2 within the first 15 calendar days of this contract. During this period, the Contractor shall validate the equipment description, manufacturer, and model number. The Contractor shall notify the COR of any problems with the equipment within seven (07) calendar days of completion of the initial inspection.

The Government uses a Coast Guard modified version of IBM’s Maximo® Asset Management software to manage its facilities, infrastructure, and equipment. From time to time, the Contractor can be expected to remove and replace failed HVAC equipment. Whenever HVAC equipment is replaced, the Contractor shall provide the COR with the following new equipment information within seven (07) calendars day after installation:

Equipment Description Building Name Physical Location within the Building Manufacturer Name Manufacturer Model Number Serial Number Installation Date Approximate Acquisition Cost

Preventative Maintenance Scheduling

Within fourteen (14) calendar days of contract award, the Contractor shall submit a detailed preventative maintenance schedule (preferably in MS Excel format) for the COR’s approval. This schedule shall be for the entire contract period and identify each piece of HVAC equipment by the Government’s equipment number, equipment description, building and the date on which preventative maintenance work is scheduled (see section below for work completion deadlines). The preventative maintenance schedule shall be updated annually within fourteen (14) calendar days of each option year renewal.

TASK ONE. Preventative Maintenance

2.5.1 The Contractor shall perform preventative maintenance in accordance with the manufacturer’s instructions and accepted industry standards on all equipment identified in Exhibit #2, list of HMF HVAC equipment. The Coast Guard uses RSMeans® Preventative Maintenance Components as the industry standards for preventative maintenance performed by government personnel. The Coast Guard job plans for Preventative Maintenance and periodicity for each piece of equipment can be found in Exhibit #3. In those cases where the manufacturer’s instructions conflict with the RSMeans® Preventative Maintenance Components, the Contractor shall perform the preventative maintenance based on the manufacturer’s instructions.

2.5.2 The Contractor shall complete preventative maintenance work within fifteen (15) calendar days from the date specified in the Contractor’s preventative maintenance schedule required under paragraph

2.4. If materials are required, the preventative maintenance work shall be completed within fifteen (15) calendar days after receipt of the materials. If preventative maintenance work is delayed beyond these deadlines, the Contractor shall notify the COR and provide an expected completion date.

2.5.3 In addition to the manufacturer’s instructions and industry standards, the Contractor shall be responsible for the following:

a. Purchase of all consumables such as filters, belts, oils, refrigerants, etc.

b. Inspection of temperature and humidity set points and sensitivities, and adjustment as necessary after discussing with COR.

c. Maintain clean surfaces and equipment surroundings.

2.5.4 The Contractor shall submit a monthly preventative maintenance report to the COR within seven

(7) calendar days after the end of the month with all equipment maintenance and inspections performed within the month. This report shall include the Government’s equipment number and description as provided in Exhibit #2. Additionally, this report shall identify any equipment deficiencies noted by the Contractor during the performance of the preventative maintenance work.

TASK TWO. Routine Repairs

2.6.1 This contract requires the Contractor to repair equipment in addition to providing preventative maintenance. The time it takes the Contractor to repair equipment and the time it takes the Contractor to respond to repair requests affects their monthly payment. If the Contractor does not respond to a request for repairs in time or does not complete work in the allotted time given, a deduction will be made in the amount as defined in the table below.

Repair Completion Deduction in Pay 97% 0 91% 10% 88% 25%

2.6.2 The time it takes to repair equipment will be determined on a case-by-case basis. The Contractor will first submit a time estimate to the COR, and if the COR agrees to the repairs, the work will begin. If the Contractor finds additional repairs are needed, extra time to repair a piece of equipment may be granted by the COR.

Additionally, the Contractor must respond to repair request within 4 hours and within 2 hours for an emergency request for repairs. Emergency repair requests require a response 24 hours per day 7 days per week. Regular repair request will only be required during the normal workweek as described in section 4.3 of the PWS. The table below shows what the Coast Guard expects from the Contractor and the deductions the Coast Guard will make if they do not meet the standard.

Time to Respond to Repair Requests Deduction in Pay 97% 0 91% 10% 88% 25%

The Coast Guard requires the Contractor to respond by phone or by email to repair requests.

Failure of the Contractor to respond to repair request due to phone or email issues is incumbent upon the Contractor and are not the fault of the Coast Guard.

2.6.3 The Contractor shall submit a monthly emergency repair report and a regular repair report to the COR within seven (7) calendar days after the end of the month. This report shall include the Government’s equipment number and description as provided in Exhibit #2.

CONTRACTOR PERSONNEL

Qualified Personnel The Contractor shall provide qualified personnel to perform all requirements specified in this PWS.

Contractor personnel shall be licensed by the state in which the work is being performed. The Contractor shall provide a copy of licenses upon request of the COR or the Contracting Officer.

Licenses required upon request are below:

North Carolina Mechanical License Chlorofluorocarbons (CFC) Certification

Project Manager The Contractor shall provide a project manager who shall be responsible for all Contractor work performed under this PWS. The project manager shall be a single point of contact for the Contracting Officer and the COR. The name of the project manager, and the name of any alternates who shall act for the Contractor in the absence of the project manager, shall be provided to the Government as part of the Contractor's quote. During any absence of the project manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under this contract. The project manager and all designated alternates shall be able to read, write, and speak English.

Additionally, the Contractor shall not replace the project manager without prior approval from the Contracting Officer. The project manager shall be available to the COR via telephone between the hours of 7:30 a.m. and 4:00 p.m. EST, Monday through Friday, and shall respond to a request for discussion or resolution of technical problems within 4 hours of notification.

Employee Identification Contractor employees visiting Government facilities shall wear an identification badge or uniform shirt that, at a minimum, displays the Contractor’s name. Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent.

Employee Conduct Contractor employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not bring discredit upon the United States Coast Guard or the Department of Homeland Security. The project manager shall ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety, security and authorized smoking areas.

Removing Employees for Misconduct or Security Reasons The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.

Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

OTHER APPLICABLE CONDITIONS

PERIOD OF PERFORMANCE

The period of performance for this contract is a one-year base period with four one-year option periods as follows:

Period Start Finish Base July 01, 2023 June 30, 2024

Option 1 July 01, 2024 June 30, 2025 Option 2 July 01, 2025 June 30, 2026 Option 3 July 01, 2026 June 30, 2027 Option 4 July 01, 2027 June 30, 2028

PLACE OF PERFORMANCE

The primary place of performance will be the USCG Base Elizabeth City, Elizabeth City, NC.

HOURS OF OPERATION

Contractor employees shall generally perform all work between the hours of 7:30 a.m. and 4:00 p.m. EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this PWS.

TRAVEL

Contractor travel shall not be required for this requirement.

PROGRESS MEETINGS

The project manager shall be available to meet with the COR upon request to present deliverables, discuss progress, exchange information, and resolve emergent technical problems and issues. These meetings shall take place at the USCG Base Elizabeth City, Elizabeth City, NC.

GENERAL REPORT REQUIREMENTS

The Contractor shall provide all written reports in electronic format with read and write capability-using applications that are compatible with DHS workstations (Windows 10 and Microsoft Office Applications).

GOVERNMENT TERMS & DEFINITIONS

CDR – Contract Discrepancy Report CLIN – Contract Line-Item Number COR – Contracting Officer’s Representative DHS – Department of Homeland Security HAZMAT – Hazardous Material HVAC – Heating, Ventilation and Air Conditioning KO – Contracting Officer OSHA – Occupational Safety and Health Administration PRS – Performance Requirement Summary PWS – Performance Work Statement QC – Quality Control QCP – Quality Control Plan RFQ – Request for Quotation SDS – Safety Data Sheet

GOVERNMENT FURNISHED RESOURCES

The Government will make available at no cost to the Contractor water and electricity, pending the determination of availability at each location. Any connections to these utilities are the responsibility of the Contractor. The Contractor shall instruct employees in utilities conservation practices. Electrical components and all other government furnished utilities shall be used in accordance with OSHA standard requirements as well as the applicable federal, state and local laws.

Modifications will address whether or not Government furnished items are being provided.

CONTRACTOR FURNISHED PROPERTY

The Contractor shall furnish all facilities, materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government furnished resources specified in PWS paragraph 6.0.

GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the Contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted quote. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

The COR will have 10 business days to review deliverables and make comments. The Contractor shall have 10 business days to make corrections and redeliver.

DELIVERABLES

The Contractor shall consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed or approved by the COR prior to proceeding to next deliverable or event in this PWS.

2.5.4

Preventative Maintenance Reports

Within 7 calendar days after the end of the month.

COR

2.6

Routine Repair Request Reports

Within 7 calendar days after completion of repairs.

2.6.3

Emergency Repair Requests Reports

Within 7 calendar days after completion of repairs.

3.2

Project Manager Contact Information

With Contractor’s quote

Contracting Officer

9 10 Contractor Quality Control Plan

Within 7 calendar days after contract award

ITEM PWS

REFERENCE

DELIVERABLE / EVENT DUE BY

DISTRIBUTIO

N

2.1.7

Hazardous Materials and Environmental Compliance

As needed 7 calendar days prior to performance of work

2.3

Equipment Validation

7 calendar days from completion of initial inspection.

2.3

Newly Installed Equipment Data

7 calendar days after installation of equipment

2.4

Preventative Maintenance Schedule

Within 14 calendar days of contract award and within 14 calendar days after the start of each option year thereafter.

CONTRACTOR QUALITY CONTROL (QC) REQUIREMENTS

Contractor QC Plan (QCP): The Contractor shall develop, submit within seven (7) calendar days after contract award, and maintain a QCP delineating the Contractor’s QC program or inspection system to monitor and control their performance of services, as required in accordance with Section 9.0, Deliverables, herein.

The QC program or inspection system shall encompass all functions of the contract. The Contractor shall develop and implement quality control procedures addressing the areas identified in the PWS herein and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's management shall keep the Coast Guard informed of all issues affecting quality to include timely and effective corrective actions. The QC records shall, in part, consist of inspection checklists, and shall indicate the nature, frequency, and number of observations made, the number and type of deficiencies found, and the nature of corrective action taken as appropriate.

QC Program/Inspection System shall include, but is not limited to, the following:

I. Introduction to the Quality Control System

A. Background and Rationale for the System B. Objectives in using Quality Control C. Successes with and updates for the System

II. Preventive, Emergency Maintenance and Inspection/Testing Services Quality Control Process

A. Inspection Procedure B. Means of Identifying and Resolving Problems C. Roles and Responsibilities

III. Specific Quality Control Functions A. Performance schedule (covering all the service requirements of this contract, Scheduling, Submissions in Completion Reports, Availability of Supervisor/Alternate)

1. Work Controls

2. The type of equipment and products to be used

B. Maintenance/Equipment Compliance w/OSHA C. Labor Practices (hiring, retention & rewards, and substitutions) D. Security & Safety Compliance w/OSHA E. Government Access to Contractor records

IV. Contingencies A. Routine or Emergency Situations B. Procedures to be used C. Obtaining additional employees D. Strike Contingency Plan

QUALITY ASSURANCE REQUIREMENTS

Fundamental Government Responsibilities

The COR is responsible for representing the Contracting Officer for all facets of the requested services quality. The COR will carry out inspections, reviews and approvals, handle deficiencies, and ultimately accept on behalf of the Contracting Officer. The specific COR functions are identified below.

General Quality Assurance Functions To surveil the Contractor's quality program, the COR will verify the Contractor’s compliance with designated performance requirements. In addition, for noncompliance or untimely corrective action to deficiencies of specific tasks, the Contractor shall be subject to re-performance. With this intent, the surveillance approach may not be one that stays the same throughout the duration of the contract. The COR will periodically update the surveillance approach when the need arises. The COR will inspect the Contractor's QCP regularly for compliance with the requirements herein.

Specific Quality Assurance Functions The COR shall establish an Inspection Schedule using the Quality Checklists from the Contractor’s QC Program. The COR shall perform the following quality and evaluative functions that comprise the Government Quality Assurance Surveillance Plan (QASP):

10.7.1 Carry out periodic inspections using the Quality Checklists.

10.7.2 Report findings resulting from these inspections to the Contractor/Contracting Officer.

10.7.3 If discrepancies are discovered as a result of the periodic inspections, or any other means, use Contract Discrepancy Report (CDR) to communicate them to the Contractor and follow up to ensure nonconformance are corrected.

10.7.4 The COR shall meet with the program manager or supervisor as agreed to or as often as necessary. The Contractor and COR shall sign the written minutes of these meetings, prepared by the COR. Should the Contractor not concur with the minutes, the Contractor shall state any areas of non– concurrence in writing to the COR within 5 calendar days of receipt of the signed minutes.

10.7.5 Follow up to ensure customer surveys are conducted properly and Contractor responds fully to concerns.

10.7.6 Review changes as well as initial and annual equipment inventories.

10.7.7 Take appropriate actions based on Health, Safety, Environmental, and any other inspection results.

PERFORMANCE REQUIREMENTS SUMMARY (PRS)

The PRS establishes key elements of Contractor performance that represent “mission essential” service requirements, which are identified in the table below in the “Service Output” column. The “Performance Objective” column represents the standard against which Contractor performance will be measured in relation to accomplishment of the corresponding service output. The performance objective or “standard” describes the minimum acceptable level of service by the Contractor for satisfactory performance. The “Acceptable Quality Level (AQL)” column displays the maximum allowable deviation from the performance objective, which, if exceeded, evokes the negative incentive specified in the table below.

12.0 ATTACHMENT/TECHNICAL EXHIBIT LISTING

12.1 Exhibit #1: Map of USCG Base Elizabeth City, NC

12.2 Exhibit #2: Technical Exhibit

12.3 Exhibit #3: Job Plan List

Service Output Performance Objective

Acceptable Quality Level

(AQL)

Negative incentive

1. Initial Validation of HVAC Equipment per PWS paragraph 2.3

Initial inspection and validation of equipment data.

95% Re-Performance

2. Periodic Preventative Maintenance

Services performed in accordance with manufacturers’ recommendations and are on time.

97% Re-Performance

3. Response to Emergency and Normal Repair Requests

Perform repairs to provide the continuous, safe, and efficient operation of HVAC equipment.

97% Deduction of Payment

EXHIBIT #1: MAP OF USCG BASE ELIZABETH CITY, NC

EXHIBIT #2: TECHNICAL EXHIBIT

1.0 LIST OF HVAC EQUIPMENT AND LEVEL OF SERVICE/MAINTENANCE FREQUENCY

Location # Class

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

PACKAGE

UNITS

Package Unit, Air Cooled -

#66

Center South

Exterior Wall

LENNOX

TGA120S2

BM1G

5607L0 1269 215624 1955 1954 No N/A

847908

PACKAGE

UNITS

Package Unit, Air Cooled -

#46

North Exterior of Machine

Shop

LENNOX

TGA102S2

BS1G

5607L1

2474 215640 1955 1954 No N/A

847908

PACKAGE

UNITS

Package Unit, Air Cooled -

#67

South Exterior Carrier

38AKS044

0808Q0 8466 215642 1955 1954 No N/A

847908

PACKAGE

UNITS

Package Unit, Air Cooled -

#76

South Exterior

TEMPMA

STER

YJT40C00

A4AAA2

N2M16 52101

283051 1955 1954 No N/A

847908

PACKAGE

UNITS

Package Unit, Forced Air Heater -

#71

2 FL SW

Closet

LENNOX

G40UH-

36A-070-

5907M 12787

215652 1935 1934 No N/A

847908

PACKAGE

UNITS

Package Unit, Forced Air Heater -

#75

DRS Site Services

LENNOX NA NA 215653 1935 1934 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

PACKAGE

UNITS

Package Unit, Air Cooled -

#88

West Exterior LENNOX NA NA 215654 1955 1954 No N/A

847908

PACKAGE

UNITS

Package Unit, Air Cooled -

#52

East End of South

Exterior

LENNOX

TGA10SS2

BS1G

5607L1 2475 215655 1955 1954 No N/A

847908

PACKAGE

UNITS

Package Unit, Air Cooled -

#60

Center South

Exterior

LENNOX

TGA120S2

BM1G

5607L1

215656 1955 1954 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#43

North Exterior of Machine

Shop

LENNOX

HP29-036-

7G 5807B0

215659 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#45

North Exterior of Machine

Shop

LENNOX

HS29-060-

13G 5807B2

215660 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#44

North Exterior of Machine

Shop

LENNOX

TSA060S4

N44G 5812C1

215661 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#81

West Exterior

LENNOX

HS290601

3G 5807B2

215662 1712 1719 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#85

West Exterior LENNOX

HS29-039-

7G

807H19 274 215663 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#54

East End of South

Exterior

LENNOX

13HPD-

024-230-

5807K1 7454 215664 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#64

Center South

Exterior

LENNOX

HS29-060-

13G

5807D1

215665 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#65

Center South

Exterior

LENNOX

TSA060S4

N44G

5812C1

215666 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#69

South Exterior

LENNOX

HS290601

3G 5807B2

215667 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#70

South Exterior

LENNOX

HS290361

3G 5807B2

215668 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#71

South Exterior

LENNOX

HS290361

3G 5807A1

215669 1712 1719 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#86

West Exterior LENNOX

HS290601

3G

5807D1 4285 215670 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#89

North Exterior LENNOX

HS290601

3G

5808D1 2034 215671 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#90

North Exterior

LENNOX

HS290601

3G 5807B2

215672 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#91

North Exterior

LENNOX

HS290601

3G 5807B2

215673 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#50

East End of South

Exterior Wall

LENNOX

HS29-36-

13G

5808A0

215674 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#51

East End of South

Exterior Wall

LENNOX

13ACD-

024-230-

1914G2

215675 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#55

East End of South

Exterior Wall

LENNOX

HS29-036-

13G

5807A1

215676 1712 1719 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#56

East End of South

Exterior Wall

LENNOX

HS29-060-

13G

5807B2 3962 215677 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#57

East End of South

Exterior Wall

LENNOX

HS29-060-

13G

5807B2 3966 215678 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#58

East End of South

Exterior Wall

LENNOX

13HPD-

018-230-

5807J3

215679 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#61

Center South

Exterior Wall

LENNOX

TSA060S4

N44G

5812J0

215680 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#62

Center South

Exterior Wall

LENNOX

HS29-060-

13G

5807B2

215681 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#63

Center South

Exterior Wall

LENNOX

HS29-036-

13G

5807A1

215682 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#68

South Exterior

LENNOX

13HPD-

018-230-

5807J3

215683 1712 1719 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#72

South Exterior LENNOX

13HPD-

024-230-

5807K1 7448 215684 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#73

South Exterior LENNOX

HP29-060-

7G

5807G1 1807 215685 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#74

South Exterior

LENNOX

HP29-060-

7G 5807G1

215686 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#75

West Exterior

LENNOX

HP29-060-

7G 5807G1

215687 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#77

South Exterior

LENNOX NA NA 215688 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#80

West Exterior

LENNOX

HS29-039-

7G NA 215689 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#82

West Exterior

LENNOX

HS29-039-

7G 5807C3

215690 1712 1719 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#84

West Exterior LENNOX

HS29-039-

7G

5807B0 7808 215691 1712 1719 No N/A

847908

PACKAGE

UNITS

Split System A/C, Air Cooled -

#87

West Exterior LENNOX

HS29-060-

13G

5807B2 3969 215692 1712 1719 No N/A

847908

PACKAGE

UNITS

Reciprocati ng, Air

Cooled - #53

East End of South

Exterior Carrier

38AKSO44

0608Q0

215709 2054 2053 No N/A

847908

PACKAGE

UNITS

Reciprocati ng, Air

Cooled - #59

Center South

Exterior Carrier

38AKSO44

1108Q8

215710 2054 2053 No N/A

847908

AIR

HANDLING

UNITS

Air Handling Unit - #58

Hangar 2 Bay 3 East

End

ICE AC248

030871 25B1

216002 1780 1778 No N/A

847908

AIR

HANDLING

UNITS

Air Handling

Unit

Hangar 2 Bay 4 East

End

ICE AC148100

030871 25B2

216080 1780 1778 No N/A

847908

AIR

HANDLING

UNITS

Air Handling

Unit

Hangar 2 Bay 4 East

End

ICE AC148100

030871 25A2

216127 1780 1778 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

AIR

HANDLING

UNITS

Air Handling Unit - #59

Hangar 2 Bay 3 West

End

ICE AC248

030872 5A1 216128 1780 1778 No N/A

847908

UNIT

HEATERS Unit Heater 2 FL Ceiling Adjacent to CO's Office

LENNOX NA NA 216129 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

2 FL Ceiling in MRS

Conference

RM

LENNOX

G40UH60

C11015

NA 216135 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

2 FL Break RM 4 Closet

LENNOX NA NA 216136 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

Hangar 2 Bay 3 Men's RM Ceiling

LENNOX

G40UH60

C11015

NA 216137 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

2 FL Ceiling Adjacent

CMD Master Chief

LENNOX NA NA 216139 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

IT Closet D Ceiling

LENNOX

G40UH60

C11015

NA 216141 1935 1934 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

UNIT

HEATERS Unit Heater

2 FL SE

Men's RM Ceiling

LENNOX NA NA 216142 1935 1934 No N/A

847908

UNIT

HEATERS Unit Heater

2 FL SE

Closet LENNOX

G40UH36

A-7016

5907M 12786 216144 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

- #56

2 FL SE

Closet

LENNOX

G40UH-

60C-110-

5907B2

216145 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

- #57

2 FL SE

Closet

LENNOX

G40UH-

60C-110-

5907B1

216146 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

Training RM 3 Chiefs

Mess Closet

LENNOX

G40UH60

C11015

NA 216147 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

Training RM 3 Chiefs

Mess Closet

LENNOX

G40UH60

C11015

NA 216148 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

2 FL SW

Closet

LENNOX

G40UH60

C11015

5907B1

216149 1935 1934 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

UNIT

HEATERS Unit Heater 2 FL West Men's RM

Ceiling

LENNOX

G40UH60

C11015 NA 216150 1935 1934 No N/A

847908

UNIT

HEATERS Unit Heater IT Closet F

Ceiling LENNOX

G40UH60

C11015 NA 216151 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

2 FL SW

Closet

LENNOX

G40UH60

C11015

5907B1

216152 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

- #80 DRS Site Services

LENNOX

G40UH60

C11015

NA 216153 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

- #82

2 FL Break RM 5 in

Drop Ceiling

LENNOX

G40UH60

C11015

NA 216154 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

Break RM 6 Ceiling

LENNOX

G40UH60

C11015

NA 216155 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

2 FL Ceiling Adjacent to MRS Chief's

Office

LENNOX

G40UH60

C11015

NA 216156 1935 1934 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

UNIT

HEATERS

Unit Heater

- #89

HMF

Training RM

5 Closet

LENNOX

G40UH-

60C-110-

5907L0 0598 216157 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

- #91

HMF

Training RM

5 Closet

LENNOX

G40UH-

60C-110-

5907K1 3523 216159 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

- #90

HMF

Training RM

5 Closet

LENNOX

G40UH-

60C-110-

NA 216160 1935 1934 No N/A

847908

UNIT

HEATERS

Unit Heater

- #85

Break RM 6 Men's RM

Above Drop Ceiling

LENNOX

G40UH-

60C-110-

NA 216162 1935 1934 No N/A

847909

UNIT

HEATERS

Unit Heater

Suspended from Ceiling

Modine NA NA 216463 1935 1934 No N/A

847911

UNIT

HEATERS

Unit Heater, Electric

Corrosive Bay

NA NA 216464 8486 N/A No N/A

847911

UNIT

HEATERS

Unit Heater, Electric

Flammable Bay

NA NA 216465 8486 N/A No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

AIR

HANDLING

UNITS

Air Handling

Unit

Hangar 1 Bay 1 West

Side

AC148

010564 81B 216584 1780 1778 No N/A

847887

AIR

HANDLING

UNITS

Air Handling

Unit

Hangar 1 Bay 2 East

End

AC148

010564 81B 216585 1780 1778 No N/A

847887

AIR

HANDLING

UNITS

Air Handling

Unit

Hangar 1 Bay 2 West

End

AC148

010564 81A

216586 1780 1778 No N/A

847887

AIR

HANDLING

UNITS

Air Handling

Unit

Hangar 1 Bay 1 East

Side

AC148

010564 81A

216588 1780 1778 No N/A

847887

AIR

HANDLING

UNITS

Air Handling

Unit

Metal Shop Attached to Paint Booth

NA NA 216589 1780 1778 No N/A

847887

PACKAGE

UNITS

Reciprocati ng, Air

Cooled - #21

Center South

Exterior Wall Carrier 38AKS044

0405F0

216597 2054 2053 No N/A

847887

PACKAGE

UNITS

Reciprocati ng, Air

Cooled - #22

Center South

Exterior Carrier

38AKSO44

0405F0

216598 2048 2046 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

PACKAGE

UNITS

Reciprocati ng, Air

Cooled - #23

Center South

Exterior Wall Carrier 38AKS044

0405F0 3637 216600 2054 2053 No N/A

847887

PACKAGE

UNITS

Reciprocati ng, Air

Cooled - #31

West End of South Wall Carrier 38AKS044

0305F0 2721 216605 2054 2053 No N/A

847887

PACKAGE

UNITS

Package Unit, Air Cooled -

#14

South Exterior East

End

LENNOX

GA090S2B

M1G

5605C0

217189 1955 1954 No N/A

847887

PACKAGE

UNITS

Package Unit, Air Cooled -

#20

Center South

Exterior TRANE NA NA 217190 1955 1954 No N/A

847887

PACKAGE

UNITS

Package Unit, Air Cooled -

#24

Center South

Exterior TRANE NA NA 217191 1955 1954 No N/A

847887

PACKAGE

UNITS

Package Unit, Air Cooled -

#29

Center South

Exterior TRANE NA NA 217192 1955 1954 No N/A

847887

PACKAGE

UNITS

Package Unit, Air Cooled -

#33

Center South

Exterior TRANE NA NA 217193 1955 1954 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

PACKAGE

UNITS

Package Unit, Air Cooled -

#47

NE Exterior of Paint

Shop

LENNOX

TGA102S2

BM1G

5606A0 7863 217194 1955 1954 No N/A

847887

PACKAGE

UNITS

Package Unit, Air

Cooled - #7 East Exterior TRANE

YSC120F4

RLA

112310 236L 217195 1955 1954 No N/A

847887

PACKAGE

UNITS

Package Unit, Heat Pump, Air

Cooled

2 FL

Breezeway

AZ39H15E

ABM1

NA 217196 1947 1946 No N/A

847887

PACKAGE

UNITS

Package Unit, Heat Pump, Air

Cooled

2 FL West Breezeway

GENERAL

ELECTRIC

AZ39H15E

ABM1

NA 217197 1947 1946 No N/A

847887

PACKAGE

UNITS

Package Unit, Heat Pump, Air

Cooled

2 FL

Breezeway

GENERAL

ELECTRIC

AZ39H15E

ABM

NA 217198 1947 1946 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled

North Exterior

Adjacent to Machine

Shop

LENNOX

HS290601

3G 5807B2

217200 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled

North Exterior

Adjacent to Machine

Shop

ARCOAIR

E

HS290601

3G

5807B2

217201 1712 1719 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

PACKAGE

UNITS

Split System A/C, Air

Cooled - #1

North Exterior LENNOX

HS290601

0G

5805C2 2140 217202 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#10

East Exterior LENNOX

HS29-060-

13G NA 217203 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#11

East Exterior LENNOX

HS29-060-

13G 805C34

217204 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#12

East End of South

Exterior Wall

LENNOX

HP29-036-

5G

5804L0

217205 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#13

East End of South

Exterior Wall

LENNOX

TSA036S4

N43G

5814C0

217206 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#15

South Exterior East

End

LENNOX

HS29-024-

3P

5805A2

217210 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#16

South Exterior East

End

LENNOX

HS29-024-

3P

5805B- 45184

217212 1712 1719 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#17

Center South

Exterior Wall

TRANE

4TTA3060

A4000BB

11283Y 6L2F 217213 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#18

Center South

Exterior Wall

TRANE

4TTA3060

A4000BB

11074X A45F 217214 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#19

Center South

Exterior

LENNOX

13HPX-

018-230-

1912E0

217215 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air

Cooled - #2

North Exterior

LENNOX

HS290601

0G 5805C2

217216 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#25

West End of South

Exterior Wall

TRANE

2TWB301

8A1000BA

111220

AS4F

217217 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#26

West End of South

Exterior Wall

LENNOX

TSA060S4

N44G

5814H0

217218 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#27

West End of South

Exterior Wall

TRANE

4TTA3060

A4000BB

11155

MM15F

217219 1712 1719 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#28

Center South

Exterior

LENNOX

HS29-024-

3P

5805B4 5186 217220 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air

Cooled - #3

North Exterior LENNOX

HS290601

0G

5805A0 7591 217221 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#30

Center South

Exterior

LENNOX

HS29-024-

3P

5805B4

217222 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#32

West End of South Wall

LENNOX

TSA036S4

N43G 5813D1

217223 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#34

Center South

Exterior

LENNOX

HS29-060-

10G

5805A1

217224 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#35

West End of South

Exterior

LENNOX HS29

5807A1

217225 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#36

West End of South

Exterior

LENNOX

HS29-060-

13G

5807B2

217226 1712 1719 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#37

West End of Door 12 LENNOX

HS29-060-

13G

5807B2 3970 217227 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#38

West End of Door 12 LENNOX

HS29-060-

13G

5807B4 4314 217228 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air

Cooled - #4

North Exterior

LENNOX

HS29-060-

10G 5805A0

217229 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#41

North Exterior Machine

Shop

LENNOX

HS29-060-

13G 5807D1

217230 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#42

North Exterior Machine

Shop

LENNOX

HS29-060-

13G 5807D1

217231 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#48

West Exterior

LENNOX

HS29-060-

10G 5805A0

217232 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#49

West Exterior

LENNOX

HS29-060-

10G 5805B0

217233 1712 1719 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

PACKAGE

UNITS

Split System A/C, Air

Cooled - #5

North Exterior LENNOX

HS29-060-

10G

5805C2 2139 217234 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air Cooled -

#50

West Exterior LENNOX

HS29-036-

5G

5804L0 4330 217235 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air

Cooled - #6

North Exterior

LENNOX

HS29-060-

10G 5805B0

217236 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air

Cooled - #8

East Exterior LENNOX

HS29-060-

13G 5805C3

217237 1712 1719 No N/A

847887

PACKAGE

UNITS

Split System A/C, Air

Cooled - #9

East Exterior LENNOX

HS29-060-

13G 5805C3

217238 1712 1719 No N/A

847887

UNIT

HEATERS

Unit Heater

2 FL Ceiling Adjacent to LRS Product

Li

LENNOX

G40UH60

C11007

NA 217249 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

Hangar 1 Bay 1

Avionics Shop Ceiling

LENNOX

G40UH60

C11007

NA 217250 1935 1934 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

UNIT

HEATERS Unit Heater

2 FL HMF

Training RM

LENNOX

G40UH60

C11007

5905C0 3095 217251 1935 1934 No N/A

847887

UNIT

HEATERS Unit Heater

2 FL HFM1

Training RM

LENNOX

G40UH60

C11007

5905C0 3105 217252 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

Hangar 1 Bay 1 Men's RM Ceiling

LENNOX

G40UH60

C11007

NA 217253 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

2 FL Break RM 2 Closet

LENNOX

G40UH60

C11007

5905C0

217254 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

Break RM 1 Ceiling

LENNOX

G40UH60

C11007

NA 217255 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

IT Closet A Ceiling

LENNOX

G40UH60

C11007

NA 217256 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

2 FL SE

Men's RM

Ceiling

LENNOX

G40UH60

NA 217257 1935 1934 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

UNIT

HEATERS Unit Heater

2 FL SE

Closet LENNOX

G40UH24

A04510

5905D2 240 217258 1935 1934 No N/A

847887

UNIT

HEATERS Unit Heater

2 FL SE

Closet LENNOX

G40UH60

C11007

5905C0 3100 217259 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

2 FL SE

Closet

LENNOX

G40UH60

C11007

NA 217260 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

Ceiling in Control RM

2A

LENNOX

G40UH60

C11007

NA 217261 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

2 FL SW

Closet

LENNOX

G40UH60

C11007

5905C0

217262 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

2 FL SW

Closet

LENNOX

G40UH60

C11007

5905C0

217263 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

2 FL

Conference

Center Closet

LENNOX

G40UH60

C11007

5905C3

217264 1935 1934 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

UNIT

HEATERS Unit Heater

2 FL

Conference

Center Closet

LENNOX

G40UH60

C11007

590C03 086 217265 1935 1934 No N/A

847887

UNIT

HEATERS Unit Heater

2 FL SW

Corner

Men's RM Ceiling

LENNOX

G40UH60

C11007 NA 217266 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

IT Closet C Ceiling

LENNOX

G40UH60

C11007

NA 217267 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

2 FL Break RM 3 Closet

LENNOX

G40UH60

C11007

590C03

217268 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

Main Entry Way Hallway

LENNOX

G40UH60

C11007

NA 217269 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

2 FL Ceiling Adjacent to

HC130H

Engine

LENNOX

G40UH60

C11007

NA 217270 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

Bay 2 Men's

RM SW

Corner Ceiling

LENNOX

G40UH60

NA 217271 1935 1934 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

UNIT

HEATERS Unit Heater

2 FL NE

Corridor Ceiling

LENNOX NA NA 217272 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #19

Tech Planning RM in Drop Ceiling

LENNOX NA NA 217273 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #28

2 FL SE

Closet

LENNOX

G40UH-

24A-045-

5905D2

217274 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #36

Metal Shop Suspended from Ceiling South End

LENNOX

G40UH60

C11007

NA 217275 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #37

Metal Shop Suspended from Ceiling East End

LENNOX

G40UH60

C11007

NA 217276 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #38

Metal Shop Suspended from Ceiling East End

LENNOX

G40UH60

C11007

NA 217277 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #39

Metal Shop Suspended from Ceiling East End

LENNOX

G40UH60

NA 217278 1935 1934 No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847887

UNIT

HEATERS

Unit Heater

- #40

Metal Shop Suspended from Ceiling East End

LENNOX

G40UH60

C11007 NA 217279 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #41

Metal Shop Suspended from Ceiling East End

LENNOX

G40UH60

C11007 NA 217280 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #42

Metal Shop Suspended from Ceiling East End

LENNOX

G40UH60

C11007

NA 217281 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #5

2 FL

Conference

Center Closet

LENNOX

G40UH-

60C-110-

5905C0

217282 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #6

2 FL

Conference

Center Closet

LENNOX

G40UH-

60C-110-

5905C0

217283 1935 1934 No N/A

847887

UNIT

HEATERS

Unit Heater

- #9

2 FL SE

Corner

Corridor Ceiling

LENNOX NA NA 217284 1935 1934 No N/A

847908

FOOD

SERVICE

EQUIPMENT

Ice Machine

SW Corner NA NA 221385 1765 N/A No N/A

Description Equipment Description

Physical Location

Mfr.

Name

Model # Serial # Equip # Job Plan

2nd Job Plan

Mech.

Control System

Have Access and Login Info

847908

DIRECT

EXPANSION

SYSTEMS

Heat Pump, Window

Unit Guard Shack NA NA 221386 1947 1946 No N/A

2.0 FILTER LIST

Exhibit #3: JOB PLAN DETAILS

Job Plan

Description Revision RSMeans Frequency

D3055-250-1950-Q-Air conditioning split system, DX, air cooled, up to 10 ton

3 D3055-250-1950 Q

D3055-250-1950-A-Air conditioning split system, DX, air cooled, up to 10 ton

4 D3055-250-1950 A

E1095-348-1950-Q-Ice Machine, flake or cube

3 E1095-348-1950 Q

E1095-380-3950-S-Refrigerator/display, walk-in with external condenser

2 E1095-380-3950 S

D3045-110-1950-A-Air handling unit, 3 tons through 24 tons

2 D3045-110-1950 A

D3045-110-1950-Q-Air handling unit, 3 tons through 24 tons

2 D3045-110-1950 Q

D3055-122-1950-A-Forced air heater, oil, or gas fired, to 120 MBH

3 D3055-122-1950 A

D3055-122-1950-Q-Forced air heater, oil, or gas fired, to 120 MBH

2 D3055-122-1950 Q

D3055-310-1950-A-Heat pump, air cooled, up to 5 tons

2 D3055-310-1950 A

D3055-310-1950-Q-Heat pump, air cooled, up to 5 tons

2 D3055-310-1950 Q

D3055-210-1950-A-Package unit, air cooled, 3 tons through 24 tons

3 D3055-210-1950 A

D3055-210-1950-Q-Package unit, air cooled, 3 tons through 24 tons

2 D3055-210-1950 Q

D3035-130-1950-A-Chiller, reciprocating, air cooled, up to 25 tons

3 D3035-130-1950 A

D3035-130-1950-M-Chiller, reciprocating, air cooled, up to 25 tons

2 D3035-130-1950 M

D3035-130-2950-A-Chiller, reciprocating, air cooled, over 25 tons

2 D3035-130-2950 A

D3035-130-2950-M-Chiller, reciprocating, air cooled, over 25 tons

2 D3035-130-2950 M

8486 Unit Heater, Electric - A 4 CG STANDARD A

Exhibit #3: JOB PLAN DETAILS

FREQUENCY LEGEND:

A – Annual Q – Quarterly S – Semi-Annual / Seasonal M – Monthly W – Weekly

Job Plan Tasks

Job Plan Details // 1712 - D3055-250-1950-Q-Air conditioning split system, DX, air cooled, up to 10 ton

Task lD Description D u r a t i o n M e t e r Name

Organization: USCG Site: SAM Duration: 0:36 Priority: interruptible? N

Supervisor: Crew:

Labor Group: Owner: Group Owner:

10 Check with operating or area personnel for 0:02

20 Clean intake side of condenser coils, fans and intake 0:03

30 Lubricate shaft and motor 0:03

50 Replace air filters. 0:05

80 Perform operational check of unit; make adjustments on controls and other components as required.

0:02

90 During operation of unit, check refrigerant pressure; add refrigerant as 0:16

100…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .