Attachment 1_HAROLD MILLER_BLANK SOS.xls
XLS spreadsheet 41 KB Posted
- Attached to
- DOCKSIDE: USCGC HAROLD MILLER DS FY26 BMDE QL3
- Solicitation number
- 70Z08025QPBPL0033
About this file
This document is a Pricing Schedule for the U.S. Coast Guard Cutter HAROLD MILLER (WPC-154) Dockside Availability in Fiscal Year 2026. The solicitation, issued by the Department of Homeland Security US Coast Guard, covers maintenance and repair work with a performance period from January 27, 2026, to March 10, 2026. The pricing schedule includes several line items for maintenance tasks such as 8000-hour Maintenance (QL3), underwater body cleaning and inspection, and zinc anode renewal, with most current line items showing $0.00 pricing.
The document includes provisions for potential Over and Above/Growth Work, with a labor rate line item for 529 hours and a material markup/handling fee of $28,350.00. The pricing structure allows for additional scope modifications through contract adjustments using the unit price column. The schedule appears to be a draft (Draft-0) and provides a framework for potential maintenance and repair services for the Coast Guard cutter, with flexibility for future work scope expansions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08025QPBPL0033_RFQ.pdf | ||
| Attachment 2_HAROLD MILLER Spec.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC HAROLD MILLER (WPC-154) DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | MDE, 8000 Hour Maintenance (QL3), Perform | JOB | 1 | $0.00 | |
| D-002 | U/W Body (Waterborne), Clean and Inspect, Renew Zinc Anodes | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 0 | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | 1 | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Over and Above/Growth Work | |||||
| The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||
| OA/G-001 | **Provide breakdown, as follows: | Hour | 529 | $0.00 | |
| Over and Above/Growth Labor Rate | |||||
| Unit Price: $________; Quantity: 529; Unit of Issue: Hour; Extended Price: $____________ | |||||
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $28,350.00 | % | $0.00 | |
| Unit Price: $28,350.00; Quantity: 1; Unit of Issue: Percent ________%; | |||||
| Extended Price: [$28,350.00 X percentage quoted]: $______________ | |||||
| Total Price of Over and Above/Growth | $0.00 |
&C(5/12/2025) Draft-0 - Page &P of &N
File details come from the government source that posted it. Updated .