Attachment 1 - Grandview Lookout Cabin Project Specs.pdf

PDF 1 MB Posted

Attached to
Grandview Lookout Cabin Reroof, Demolition, and Asbestos Removal, Kaibab National Forest
Solicitation number
12970223Q0087
Issued by

About this file

This solicitation is for a roof replacement, demolition, and asbestos abatement project at the Grandview Lookout Cabin in the Kaibab National Forest. The selected contractor will remove and dispose of asbestos-containing materials from the existing transite board, press board, sink coating and shingles. The project also includes demolishing an existing water heater building and water tank. The contractor will install a new metal roof on the cabin and small shed building along with all necessary accessories. Work will be coordinated to minimize disruption to seasonal employees housed in the cabin. The response deadline is not provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA Forest Service Kaibab National Forest

Grandview Lookout Cabin Roof Replacements Tusayan Ranger District

Prepared by:

Coconino and Kaibab National Forests

Facilities Engineering February 2022

SECTION 011000 - SUMMARY

SECTION 011030 - MEASUREMENT AND PAYMENT

SECTION 013000 - SUBMITTALS

SECTION 016000 - PRODUCT REQUIREMENTS

SECTION 016010 – MOBILIZATION

SECTION 017000 - EXECUTION REQUIREMENTS

SECTION 017100 - CLEANING

SECTION 017320 - SELECTIVE DEMOLITION

SECTION 017820 – OPERATION AND MAINTENANCE DATA

SECTION 028000 – ACM ABATEMENT

SECTION 061600 - SHEATHING

SECTION 074113 - METAL ROOF PANELS

SECTION 076200 - SHEET METAL FLASHING AND TRIM

SECTION 077100 - ROOF SPECIALTIES

SECTION 077200 - ROOF ACCESSORIES

SECTION 077253 - SNOW GUARDS

SECTION 079200 - JOINT SEALANTS

SECTION 264113 - LIGHTNING PROTECTION FOR STRUCTURES

SUMMARY 011000 - 2

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Work for this Project consists of abatement and proper disposal of asbestos containing material (ACM) in existing transite board, press board, spray-on sink coating, and shingles; demolition of existing water heater building and water tank; and installation of new metal roof on the cabin and small shed building. The new roofing system shall include all the manufacturer’s compatible accessories including, but not limited to underlayment, adhesives, roof jacks, vent flashings, edge and corner components, valley components, drip flashing, etc. The Project includes all labor, materials, and equipment necessary to perform all the operations for the work specified.

1.2 LOCATION

A. Grandview Lookout Cabin, Tusayan Ranger District. The Project is approximately 10 miles east of the Tusayan Ranger Station, 176 Lincoln Log Loop, Grand Canyon Village, AZ 86023. Take Forest Service Rd 302 east from HWY 64/180, just south of the town of Tusayan. Follow FR 302 for 14.4 miles to FR 310. Turn left onto FR 310. Continue 1.4 miles to the lookout tower and cabin, on the right. Coordinates for the compound are latitude: 35.958036, longitude:

-111.954681.

1. Owner: USDA Forest Service, Kaibab National Forest

2. Background Information: Grandview Lookout Cabin was built in 1936 and has an asphalt shingle roof.

1.3 DESCRIPTION OF WORK – GRANDVIEW LOOKOUT CABIN

A. The existing building(s) have been tested for ACM. Materials around the wood stove, sink, and shingles were found to contain asbestos. This report is available to the bidders. The building is wood framed, constructed in 1936, with an asphalt shingle roof. The cabin serves as housing for seasonal lookout employees. The work will need to be coordinated with the employee(s) to reduce the impact to their living accommodations.

B. Environmental Work (Phase I): Specification 028000 describes the environmental work in these Specifications.

1. The Environmental Work (Phase I) will be followed by Renovation Work (Phase II) to complete the work in this contract. Contractor shall coordinate all phases of work to minimize any time lapse.

2. Specification 028000 addresses the environmental work, including building utility disconnects, proper removal and disposal of the ACMs, and required documentation and reporting.

3. The building has been tested for ACM presence and the results are attached.

4. All hazardous waste shall be manifested and delivered to an appropriate landfill for disposal. Toxicity characteristic leaching procedure (TCLP) analysis shall be the responsibility of the Contractor as described within these Specifications.

SUMMARY 011000 - 3

C. Renovation Work (Phase II): New construction shall follow the Coconino County Design Criteria to meet local climatic and geographic conditions. All new installations shall meet the county’s criteria where there is a building site at an elevation of 7,500 feet or more above sea level.

D. Demolition Work: The demolition work consists of demolishing the existing water heater building and water tank. The Contractor shall remove and dispose of existing items items stored in the building(s) as part of the demolition effort except for items slated to be salvaged. The Contractor shall demolish existing structure, including foundations to at least 24” below grade.

Dispose of all material at a certified local landfill. The Contractor shall grade all sites to match existing grade to drain water. The Contractor shall remove concrete pads, if present, and fill depression left behind. Dispose of concrete at a certified landfill.

Figure 1 Grandview Lookout Cabin and Tower

SUMMARY 011000 - 4

Figure 2 Buildings for Reroofing at Grandview Lookout Cabin

Figure 3 Building for Demolition at Grandview Lookout Cabin

Figure 4 Water Tank for Demolition at Grandview Lookout Cabin

1.4 CONTRACT TIME/TIMING OF WORK

A. Base Bid: 90 Calendar Days

SUMMARY 011000 - 2

1.5

B. Phase I can start after July 1, 2023. The start date for demolition activities can begin after July 1, 2023. No restrictions are placed on weekend work.

C. The time to complete the work in this contract is negotiable.

D. Weather normally starts impacting the road conditions in mid-November, which can prevent access to the lookout tower site. Access to the lookout site during bad road conditions is prohibited due to vehicles causing resource damage. Road conditions generally improve after winter in late March – early April to allow access to the Site.

INSPECTION OF WORKSITE

A. Bidders are encouraged to visit the site, compare the specifications with any work in place, and inform themselves of all conditions, including other work, if any, being performed. Failure to visit site will in no way relieve the successful bidder from the necessity of furnishing any materials or performing any work that may be required to complete work in accordance with specifications, without additional cost to the Government.

B. Information regarding the site of the work provided in specifications is believed to be reasonably correct, but the Government does not warrant either the completeness or accuracy of such information, and it is the responsibility of the Contractor to verify all information independently and to make other examinations of the conditions to be encountered during construction.

C. The Contractor acknowledges that he/she has investigated and satisfied him/herself as to the conditions affecting the work, including, but not restricted to, those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads, and conditions of the ground, the character of equipment and facilities needed prior to and during prosecution of the work. The Contractor further acknowledges that he/she are satisfied as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the sites. Any failure by the Contractor to acquaint him/herself with the available information will not relieve him/her from the responsibility for estimating properly the difficulty or cost of successfully performing the work.

1.6 GOVERNMENT-FURNISHED FACILITIES

A. Areas for staging operations and storage of materials shall be approved by the COR. The Contractor must request in writing for approval from the COR to stage trailers on site.

1.7 USE OF PREMISES

A. General: Contractor shall have limited use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by Owner's right to perform work or to retain other contractors on portions of the Project. Any damage resulting from the Contractor’s use of the site will be repaired or replaced at the Contractor’s expense at the direction of the Contracting Officer’s Representative (COR).

B. Contractor shall at all times conduct his/her operations to ensure the least inconvenience to the public and employees.

SUMMARY 011000 - 3

C. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.

D. Preservation of Natural Features: Confines all operations to work limits of the Project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

1. Provide temporary barriers to protect existing trees, plants and root zones.

2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with

COR and remove agreed-on roots and branches that interfere with construction.

3. Do not fasten ropes, cables, or guys to existing trees.

4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

E. Protection of Waters of the United States: Cleaning of equipment shall not be conducted in any waters of the U.S. nor shall resultant cleaning runoff, paint cans, lids, brushes, or other debris be allowed to enter waters of the U.S.

F. Existing Utilities:

1. There are minimal existing utilities that might need to be disconnected from the building prior to the removal and disposal of building components. This should be coordinated with the COR.

2. There is no electricity available at this site. Contractor is responsible for providing their own source of power.

3. There is no water available at this site.

4. There are no sanitary services available at this site.

G. Due to public use of a trail to and near this site, the Contractor shall ensure the safety of the public at all times and shall provide adequate warnings of environmental and safety hazards.

H. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor-air intakes.

1.8 PRECAUTIONARY MEASURES

A. Protection of Work: The Contractor shall take precautions necessary to protect all work during the construction period and shall maintain adequate protection during severe weather conditions to prevent damage to the work, materials and equipment. The existing elements of the building(s) shall remain undamaged and structurally sound during all phases of this contract. Any damage to the building(s) or their functional elements resulting from the Contractor’s work at the site shall be immediately repaired at no additional cost to the Government.

B. Safety: The Contractor is responsible for safeguarding the public, Forest Service Employees, Contractor employees, existing facilities, and forest resources from contract operations. All operations shall comply with the requirements and restrictions of OSHA, the Arizona Occupational Safety and Health Code, and the Workman’s Compensation Board. The Contractor shall erect signs and barricades to make unguarded operations safe as required. Signs, lights, barricades and other devices, as necessary, shall be maintained at night and on weekends.

Precautions, such as safely storing materials, shall be practiced to prevent injury to others in the area.

SUMMARY 011000 - 4

C. Security: Security is not provided by the Government. The Contractor shall take all precautions deemed necessary to secure the worksite, improvements and equipment. This may include security fencing at the Contractor’s discretion.

1.9 CLEAN UP AND DISPOSAL – NON-HAZARDOUS WASTE

A. Waste accumulation in approved containers and material staging is allowed at the site. Disposal of waste material will be off National forest Land and in compliance with local, state, and federal laws regarding disposal of construction waste. Before final acceptance of the Project by the Government, the Contractor shall remove from Government land all waste materials and rubbish resulting from this work.

B. The Contractor is responsible for all costs and permits associated with landfill disposal.

1.10 APPLICABLE CODES AND STANDARDS

A. All work shall conform to the latest editions of the International Building Codes, American Welding Society Code, American Water Works Association, National Electrical Code, and the American Institute of Steel Construction. All environmental codes, including RCRA and NESHAP, shall be adhered by the Contractor.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

MEASUREMENT AND PAYMENT 011030 - 1

SECTION 011030 - MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 REQUIREMENTS

A. Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the SCHEDULE OF ITEMS.

1.2 MEASUREMENT TERMS AND DEFINITIONS

A. Unless otherwise specified, the following terms are defined as follows:

1. Each. One entire unit. The quantity is the actual number of units completed and accepted.

2. Linear foot. As applicable, measure the work along its length from end-to-end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps.

3. Lump sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as "1." Estimated quantities of lump sum work shown in the contract are approximate.

4. Square yard. 9 square feet. Longitudinal and transverse measurements for area computations will be made horizontally. No deductions from the area computation will be made for individual fixtures having area of 9 square feet or less.

1.3 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. Actual Quantities (AQ). These quantities are determined from actual measurements of completed work.

2. Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

1.4 UNITS OF MEASUREMENT

A. Payment will be by units defined and determined according to U.S. Standard measure.

END OF SECTION 011030

SUBMITTALS 013000 - 1

SECTION 013000 - SUBMITTALS

PART 1 - GENERAL

1.1 REQUIREMENTS

A. It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item.

Contractor shall allow ten (10) days for processing of submittals by the Government.

B. Submittals may also be referred to as Shop Drawings.

1.2 MANUFACTURER’S LITERATURE AND SHOP DRAWINGS

A. Submit one (1) copy to the COR for approval on the items required herein. Submittal specifications are to be submitted in the following format:

1. The specifications and salient qualities of the item specified in the contract.

2. The specifications and salient qualities of the submittal item.

3. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.

4. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the Government or adequate justification for a cost increase to the Government.

5. Shop drawings of submitted item(s) including wiring or layout diagrams.

B. If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed shall be submitted to the COR.

C. If the specified item is to be accessible, the submittal items need to meet current Americans with Disabilities Act Accessibility Guidelines (ADAAG) or Forest Service Accessibility Guidelines and show to be installed for accessibility on submitted drawings, not just state it is available as accessible.

D. Submittals will be waived if Contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.

E. Submittals are required per the following sections:

1. 017300 – Operations and Maintenance Data

a. Manuals (2)

2. 061600 – Sheathing

a. Product Data

3. 074113 – Metal Roof Panels

a. Product Data

b. Color Samples

c. Underlayment Product Data

SUBMITTALS 013000 - 2

d. Warranty information and documentation

4. 076200 – Sheet Metal Flashing and Trim

a. Product Data

b. Color Samples

c. Shop Drawings for Fabricated items

5. 077200 – Roof Accessories

a. Product Data

b. Shop Drawings

6. 077253 – Snow Guards

a. Product Data

7. 079200 – Joint Sealants

a. Product Data

b. Color Samples

END OF SECTION 013000

PRODUCT REQUIREMENTS 016000 - 1

SECTION 016000 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.

B. Comparable Product Requests: Submit request for consideration of each comparable product.

Identify product or fabrication or installation method to be replaced.

1. Show compliance with requirements for comparable product requests.

2. COR will review the proposed product and notify Contractor of its acceptance or rejection.

C. Basis-of-Design Product Specification Submittal: Show compliance with requirements.

D. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions.

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Deliver products to Project site in manufacturer's original sealed container or packaging, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

3. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected.

4. Store materials in a manner that will not endanger Project structure.

5. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation.

E. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. Provide products that comply with the Contract Documents, are undamaged, and, unless otherwise indicated, are new at the time of installation.

1. Provide products complete with accessories, trim, finish, and other devices and components needed for a complete installation and the intended use and effect.

2. Descriptive, performance, and reference standard requirements in the Specifications establish salient characteristics of products.

B. Where Specifications include the phrase "as selected by COR from manufacturer's full range" or similar phrase, select a product that complies with requirements. COR will select color, gloss, PRODUCT REQUIREMENTS 016000 - 2 pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

2.2 COMPARABLE PRODUCTS

A. COR will consider Contractor's request for comparable product when the following conditions are satisfied:

1. Evidence that the proposed product does not require revisions to the Contract Documents, that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work.

2. Detailed comparison of significant qualities of proposed product with those named in the Specifications.

3. List of similar installations for completed projects, if requested.

4. Samples, if requested.

PART 3 - EXECUTION (Not Used)

END OF SECTION 016000

MOBILIZATION 016010 - 1

SECTION 016010 – MOBILIZATION

PART 1 - GENERAL

1.1 DESCRIPTION

A. This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

PART 4 - MEASUREMENT AND PAYMENT

4.1 PROGRESS PAYMENTS WILL BE MADE AS FOLLOWS:

A. The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.

1. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.

2. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.

3. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.

B. Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.

C. The total of all payments shall not exceed the original contract amount for this item.

4.2 PAYMENT

A. Payment will be made under:

MOBILIZATION 016010 - 2

PAY ITEM DESCRIPTION PAY UNIT

016010(01) Mobilization – All Work LS

END OF SECTION 016010

EXECUTION REQUIREMENTS 017000 - 1

SECTION 017000 - EXECUTION REQUIREMENTS

PART 1 - GENERAL

1.1 EXECUTION REQUIREMENTS

A. Cutting and Patching:

1. Structural Elements: When cutting and patching structural elements, notify COR of locations and details of cutting and await directions from COR before proceeding. Shore, brace, and support structural elements during cutting and patching.

2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.

3. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in COR's opinion, reduce the building's aesthetic qualities.

B. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of products and equipment.

PART 2 - PRODUCTS

2.1 MATERIALS

A. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.

B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

1. Use cleaning products that comply with Green Seal's GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels.

2.2 OPERATION AND MAINTENANCE DOCUMENTATION

A. Directory: Prepare a single, comprehensive directory of emergency, operation, and maintenance data and materials, listing items and their location to facilitate ready access to desired information.

B. Organization: Unless otherwise indicated, organize manual into separate sections for each system and subsystem, and separate sections for each piece of equipment not part of a system.

C. Organize data into three-ring binders with identification on front and spine of each binder, and envelopes for folded drawings. Include the following:

1. Manufacturer's operation and maintenance documentation.

2. Maintenance and service schedules.

EXECUTION REQUIREMENTS 017000 - 2

3. Spare parts list and local sources of maintenance materials.

4. Copies of warranties. Include procedures to follow and required notifications for warranty claims

PART 3 - EXECUTION

3.1 EXAMINATION AND PREPARATION

A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of mechanical and electrical systems, and other construction affecting the Work.

B. Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Notify COR if unsuitable conditions are found prior to new installation.

1. Verify compatibility with and suitability of substrates.

2. Examine roughing-in for mechanical and electrical systems.

3. Examine walls, floors, and roofs for suitable conditions.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

D. Surface and Substrate Preparation: Comply with manufacturer's written recommendations for preparation of substrates to receive subsequent work.

3.2 INSTALLATION

A. Comply with manufacturer's written instructions and recommendations.

B. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

C. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place. Where size and type of attachments are not indicated, verify size and type required for load conditions.

1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by COR.

D. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

E. Use products, cleaners, and installation materials that are not considered hazardous.

3.3 CUTTING AND PATCHING

A. Provide temporary support of work to be cut.

EXECUTION REQUIREMENTS 017000 - 3

B. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

C. Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to minimize interruption to occupied areas.

D. Cutting: Cut in-place construction using methods least likely to damage elements retained or adjoining construction.

1. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

E. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections.

1. Restore exposed finishes of patched areas and extend finish restoration into adjoining construction in a manner that will minimize evidence of patching and refinishing.

2. Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance.

3. Where patching occurs in a painted surface, prepare substrate and apply primer and intermediate paint coats appropriate for substrate over the patch, and apply final paint coat over entire unbroken surface containing the patch. Provide additional coats until patch blends with adjacent surfaces.

3.4 CLEANING

A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.

1. Remove liquid spills promptly.

2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.

3. Remove debris from concealed spaces before enclosing the space.

4. Remove all nails, fasteners and construction waste at end of each day.

B. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion:

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities. Sweep paved areas; remove stains, spills, and foreign deposits. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.

2. Sweep paved areas broom clean. Remove spills, stains, and other foreign deposits.

3. Remove labels that are not permanent.

4. Clean transparent materials, including mirrors. Remove excess glazing compounds.

5. Clean exposed finishes to a dust-free condition, free of stains, films, and foreign substances. Sweep concrete floors broom clean.

6. Vacuum carpeted surfaces and wax resilient flooring.

7. Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication and foreign substances. Clean plumbing fixtures. Clean light fixtures, lamps, globes, and reflectors.

8. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.

9. Pick up all nails and fasteners using several passes with a magnetic roller sweeper.

EXECUTION REQUIREMENTS 017000 - 4

3.5 OPERATION AND MAINTENANCE MANUAL PREPARATION

A. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.

B. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.

1. Prepare supplementary text if manufacturers' standard printed data are unavailable and where the information is necessary for proper operation and maintenance of equipment or systems.

END OF SECTION 017000

CLEANING 017100 - 1

SECTION 017100 - CLEANING

PART 1 - GENERAL

1.1 DESCRIPTION

A. Throughout the construction period, maintain the construction site and facilities in an orderly and clean manner as described in this Section.

PART 2 - PRODUCTS

2.1 CLEANING MATERIALS AND EQUIPMENT

A. Provide required personnel, equipment and materials as needed to maintain the specified standard.

2.2 COMPATIBILITY

A. Use only the cleaning materials and equipment, which are compatible with the surface being cleaned, as recommended by the manufacturer of the cleaning material.

PART 3 - EXECUTION

3.1 PROGRESS CLEANING

A. Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection of materials.

B. Do not allow accumulation or scrap, debris, waste material and other items not required for construction of this work.

C. At least twice each month, and more often if necessary, completely remove all scrap, debris and waste material from the job site.

D. Provide adequate storage for all items awaiting removal from the job site, observing requirements for fire protection and protection of the ecology.

3.2 SITE

A. Daily, and more often if necessary, inspect the site and pick up all scrap, debris and waste material.

Remove such items to the place designated for their storage.

B. Maintain the site in a neat and orderly condition at all times.

C. Clean mud and debris from roadways or highways adjacent to the project site daily.

CLEANING 017100 - 2

3.3 STRUCTURE

A. At least weekly, inspect the structures and pick up all scrap, debris and waste material and remove them to the place designated for their storage.

B. “Clean” for the purpose of this paragraph shall be interpreted as meaning free from material capable of being removed by reasonable effort with a handheld broom.

3.4 STRUCTURE

A. Prior to completion of the work, remove from the job site all tools, surplus materials, equipment, scrap, debris and waste.

B. Structures:

1. Exterior:

a. Visually inspect exterior surfaces and remove all traces or soil, waste materials, smudges and other foreign matter.

b. Remove all traces of splashed materials from adjacent surfaces.

c. In the event of stubborn stains not removable with water, the Forest Service may require light sandblasting or other cleaning at no additional cost to the Forest Service.

2. Interior:

a. Visually inspect interior surfaces and remove all traces or soil, waste materials, smudges and other foreign matter.

b. Remove all traces of splashed material from adjacent surfaces.

c. Remove paint drippings, spots, stains and dirt from finished surfaces.

3. Final cleaning of the project site shall be approved by the Forest Service prior to final acceptance of the work.

END OF SECTION 017100

SELECTIVE DEMOLITION 017320 - 1

SECTION 017320 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Items indicated to be removed and salvaged remain the Government’s property. Carefully detach from existing construction, in a manner to prevent damage, and store as directed by the CO.

Include fasteners or brackets needed for reattachment elsewhere.

B. Pre-demolition Photographs: Show existing conditions of adjoining construction and site improvements. Submit before Work begins.

C. It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify COR, Forest Service will be responsible for determining presence. Hazardous materials will be removed by Forest Service under a separate contract.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 DEMOLITION

A. Remove existing roofing systems including, but not limited to, asphalt shingles, underlayment, flashings, and drip edge.

B. Salvage existing gutter systems.

C. Remove any unsuitable roof substrate.

D. Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building.

E. Locate, identify, shut off, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.

SELECTIVE DEMOLITION 017320 - 2

F. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

G. Protect walls, ceilings, floors, and other existing finish work that are to remain. Cover and protect furniture, furnishings, and equipment that have not been removed.

H. Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

I. Provide temporary weather protection to prevent water leakage and damage to structure and interior areas.

J. Requirements for Building Reuse:

1. Maintain existing building structure (including structural floor and roof decking) and envelope (exterior skin and framing, excluding window assemblies and nonstructural roofing material) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

2. Maintain existing interior nonstructural elements (interior walls, doors, floor coverings, and ceiling systems) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

K. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

L. Remove demolition waste materials from Project site and legally dispose of them in an EPA-approved landfill. Do not burn demolished materials.

M. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

N. Full demolition of the existing hot water heater building and water tank will be required. The COR will determine what items in the existing building need to be salvaged. The demolition will include removal of any foundation and regrading of the location to achieve positive drainage away from the main building.

PART 4 - MEASUREMENT AND PAYMENT

4.1 MEASUREMENT

A. Grandview LO Cabin and Small Shed: Lump sum for selective demolition. Payment includes all incidental work necessary to complete this item of work.

B. Grandview LO Cabin Hot Water Building and Water Tank: Lump sum for full demolition.

Payment includes all incidental work necessary to complete this item of work.

SELECTIVE DEMOLITION 017320 - 3

4.2 MEASUREMENT

5 Payment will be made at the contract lump sum unit price as listed in the “Contract Schedule of Items” for quantities measured and accepted as follows:

PAY ITEM DESCRIPTION PAY UNIT

017320(01) Grandview Lookout Cabin Roof Selective Demo LS Main Cabin and Small Shed

017320(02) Grandview Lookout Cabin Structure Demo LS Hot Water Building and Water Tank

END OF SECTION 017320

OPERATION AND MAINTENANCE DATA 017820 - 1

SECTION 017820 – OPERATION AND MAINTENANCE DATA

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for preparing operation and maintenance manuals, including the following:

1. Operation manuals for systems, subsystems, and equipment.

2. Maintenance manuals for the care and maintenance of products, materials, finishes, systems and equipment.

B. Related Sections include the following:

1. Division 1 Section “Closeout Procedures” for submitting copies of submittals for operations and maintenance manuals.

2. Division 2 through 16 for specific operation and maintenance manual requirements for products in those sections.

1.2 SUBMITTALS

A. Manual: Submit two of each manual in final form at least 15 days before final inspection.

Contracting Officer (CO) will return copy with comments within 15 days after final inspection.

1. Correct or modify each manual to comply with CO’s comments. Submit 3 copies of each corrected manual within 15 days of receipt of CO’s comments.

1.3 DEFINITIONS

A. System: An organized collection of parts. Equipment, or subsystems united by regular interaction.

B. Subsystem: A portion of a system with characteristics similar to a system.

PART 2 - PRODUCTS

2.1 MANUALS, GENERAL

A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system.

Each manual shall contain a title page, table of contents, and manual contents.

B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:

1. Subject matter included in manual.

2. Name and address of Project.

3. Name and address of District or Forest.

4. Date of submittal.

5. Name, address, and telephone number of Contractor.

OPERATION AND MAINTENANCE DATA 017820 - 2

6. Cross-reference to related systems in other operation and maintenance manuals.

C. Table of Contents: List each product included in manual, identified by product name, indexed to content of volume, and cross-referenced to Specification Section number in Project Manual.

D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.

1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch (115-by-280-mm) paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.

a. Identify each binder on front and spine, with printed title “OPERATION AND

MAINTENANCE MANUAL,” Project title or name, and subject matter of contents.

Indicate volume number for multiple-volume sets.

2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.

4. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.

a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.

b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.

2.2 MANUALS, GENERAL

A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and equipment descriptions, operating standards, operating procedures, operating logs, wiring and control diagrams, and license requirements.

B. Descriptions: Include the following:

1. Product name and model number.

2. Manufacturer’s name.

3. Equipment identification with serial number of each component.

4. Equipment function.

5. Operating characteristics.

6. Limiting conditions.

7. Performance curves.

8. Engineering data and tests.

9. Complete nomenclature and number of replacement parts.

C. Operating Procedures: Include startup, break-in, and control procedures; stopping and normal shutdown instructions; routine, normal, seasonal, and weekend operating instructions; and required sequences for electric or electronic systems.

OPERATION AND MAINTENANCE DATA 017820 - 3

D. Systems and Equipment Controls: Describe sequence or operation, and diagram controls as installed.

E. Piped Systems: Diagram piping as installed, and identify color-coding where required for identification.

2.3 PRODUCT MAINTENANCE MANUAL

A. Content: Organize manual into a separate section for each product, material, and finish. Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below.

B. Source Information: List each product included in manual, identified by product name and arranged to match manual’s table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.

C. Product Information: Include the following, as applicable:

1. Product name and model number.

2. Manufacturer’s name.

3. Color, pattern, and texture.

4. Material and chemical composition.

5. Reordering information for specially manufactured products.

D. Maintenance Procedures: Include manufacturer’s written recommendations for inspection procedures, types of cleaning agents, methods of cleaning, schedule for cleaning and maintenance, and repair instructions.

E. Repair Materials and Sources: Include lists of materials and local sources of materials and related services.

F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.

2.4 SYSTEMS AND EQUIPMENT MAINTENANCE MANUAL

A. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturer’s maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranty and bond information, as described below.

B. Source Information: List each system, subsystem, and piece of equipment included in the manual, identified by product name and arranged to match manual’s table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.

C. Manufacturers’ Maintenance Documentation: Manufacturers’ maintenance documentation including maintenance instructions, drawings and diagrams for maintenance, nomenclature of

OPERATION AND MAINTENANCE DATA 017820 - 4

parts and components, and recommended spare parts for each component part or piece of equipment.

D. Maintenance Procedures: Include test and inspection instructions, troubleshooting guide, disassembly instructions, and adjusting instructions, [and demonstration and training videotape if available], that detail essential maintenance procedures.

E. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.

F. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers’ maintenance documentation and local sources of maintenance materials and related services.

G. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.

PART 3 – MANUAL PREPARATION

3.1 MANUAL PREPARATION

A. Emergency Manual: Assemble a complete set of emergency information indicating procedures for use by emergency personnel and by Government operating personnel for types of emergencies indicated.

B. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and maintenance of each product, material, and finish incorporated into the Work.

C. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.

D. Manufacturers’ Data: Where manuals contain manufacturers’ standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data includes more than one item in tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.

E. Drawings: Prepare drawings supplementing manufacturers’ printed data to illustrate relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in Record Drawings to ensure correct illustration of complete installation.

1. Do not use original Project Record Documents as part of operation and maintenance manuals.

F. Comply with Division 1 Section “Closeout Procedures” for the schedule for submitting operation and maintenance documentation.

OPERATION AND MAINTENANCE DATA 017820 - 5

PART 4 – MEASUREMENT AND PAYMENT

4.1 MEASUREMENT

A. There will be no separate Measurement for this section.

4.2 PAYMENT

A. This work is incidental to other items in the contract and direct separate item payment will not be made.

END OF SECTION 017820

ACM ABATEMENT 028000 - 1

SECTION 028000 – ACM ABATEMENT

PART 1 - GENERAL

1.1 DESCRIPTION

A. In this work, the Hazmat/Environmental contractor shall provide all labor, materials, tools, equipment, PPE, services, testing, supervision and incidentals necessary to perform work of asbestos containing material removal. The Contractor shall show proof of certification in compliance by EPA to engage in asbestos removal activities per 40 CFR 745.225, 226, & 227.

The Contractor shall comply with the Federal Regulatory Agencies: U.S. Environmental Protection Agency (EPA), U.S. Housing and Urban Development Agency (HUD), U.S.

Occupational Health and Safety Administrations (OSHA), U.S. Department of Transportation (DOT), U.S. Department of Health and Human Services (HHS), and U.S. Department of Labor (DOL). The Contractor shall also comply with local, and State laws, regulations and regulatory agencies; and Arizona Department of Environmental Quality (ADEQ).

1.2 SECTION REQUIREMENTS

A. An asbestos NESHAP Notification/Permit Activity Application for Demolition Activites must be filed with ADEQ prior to commencement of work at all sites. Contractor is responsible for the costs associated with the permits.

B. Hantavirus Pulmonary Syndrome (HPS): Because of the location of these buildings, rodent droppings are present. It shall be the Contractor’s responsibility to take precautions to minimize the risk of HPS to workers. There will be no additional compensation for Hantavirus precautions.

HPS is a severe, sometimes fatal, respiratory disease in humans caused by infection with a Hantavirus.

C. Anyone who comes into contact with rodents that carry Hantavirus is at risk of HPS. Rodent infestation in and around the home remains the primary risk for Hantavirus exposure. Even healthy individuals are at risk for HPS infection if exposed to the virus.