ATTACHMENT 1 GASCONADE PRICING SHEET.xls
XLS spreadsheet 87 KB Posted
- Attached to
- USCGC GASCONADE DRYDOCK REPAIRS
- Solicitation number
- 70Z08526QIBCT0033
About this file
This is a pricing sheet template for the USCGC Gasconade (WLR-75C) drydock availability in FY2026. The document outlines 67 line items covering maintenance, inspection, repair, and preservation work for both the tender and barge components of the vessel. Work categories include hull plating inspection and renewal (various steel weights), propulsion system maintenance (shafting, seals, bearings, propellers), rudder and keel cooler servicing, cathodic protection renewal, underwater body preservation, tank cleaning and inspection (fuel, potable water, sewage), deck preservation, hull fitting inspections, and piping work. Items are designated as either definite (D-prefix) or optional (O-prefix), with unit pricing structured as job-based line items, most currently showing $0.00 values pending contractor input.
The pricing template includes a cost estimation breakdown section with fields for direct labor hours by trade (engineering technician, machinist/pipe fitter, electrician, shipfitter, welder, firewatch, insulator/lagger, painter, general labor, and supervisory/QA/NDT personnel), material and subcontractor costs, and composite labor rates. A geographic labor rate table provides baseline rates for 26 U.S. shipyard locations ranging from $45 to $67 per hour, with assumed G&A and profit factors of 15% and 10% respectively. The drydock is located at 100 Arsenal Street, St. Louis, Missouri 63118. The total contract value line remains at $0.00, indicating this is a blank template awaiting contractor submission of pricing for both definite and optional work items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GASCONADE DDFY26 SOLICITATION.docx | DOCX document | |
| Attachment 4- Request for Clarifications GASCONADE.docx | DOCX document | |
| ATTACHMENT 2 GASCONADE SPECIFICATIONS.pdf | ||
| Attachment 3- Past Performance Information Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC GASCONADE (WLR-75C) DRYDOCK AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | NSP | JOB | 1 | NSP |
| D-002 | Hull Plating, U/W Body, Inspect - Tender | JOB | 1 | $0.00 | |
| D-003 | Hull Plating, U/W Body, Ultrasonic Testing - Tender | JOB | 1 | $0.00 | |
| O-004 | Hull and Structural Plating, General, 10.2 lbs. Steel, Renew - Tender | JOB | 1 | $0.00 | |
| O-005 | Hull and Structural Plating, General, 12.75 lbs. Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-006 | Hull and Structural Plating, General, 15.3 lbs. Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-007 | Hull And Structural Plating, General, 20.4 lbs. Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-008 | Hull and Structural Plating, General, 7.65 lbs. Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-009 | Hull and Structural Plating, General, Degraded Weld, Steel, Repair - Tender | JOB | 1 | $0.00 | |
| D-010 | Propulsion Shaft Rope Guards, Inspect | JOB | 1 | $0.00 | |
| O-011 | Propulsion Shafting, Optical or Laser Alignment Check | JOB | 1 | $0.00 | |
| D-012 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-013 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | JOB | 1 | $0.00 | |
| D-014 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | $0.00 | |
| D-015 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-016 | Keel Coolers, Clean, Inspect and Hydro | JOB | 1 | $0.00 | |
| D-017 | Fathometer Transducer, General Maintenance | JOB | 1 | $0.00 | |
| D-018 | Rudder Assembly, Remove, Inspect And Reinstall | JOB | 1 | $0.00 | |
| D-019 | Rudders, Preserve, 100 Percent | JOB | 1 | $0.00 | |
| D-020 | Spuds, Overhaul - Tender | JOB | 1 | $0.00 | |
| D-021 | Cathodic Protection, Magnesium Anodes, Renew, - Tender | JOB | 1 | $0.00 | |
| D-022 | Drydock - Tender | JOB | 1 | $0.00 | |
| D-023 | Temporary Services, Provide - Tender | JOB | 1 | $0.00 | |
| D-024 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-025 | Hull Plating, U/W Body, Inspect - Barge | JOB | 1 | $0.00 | |
| D-026 | Hull Plating, U/W Body, Ultrasonic Testing - Barge | JOB | 1 | $0.00 | |
| O-027 | Hull and Structural Plating, General, 10.2 lbs. Steel, Renew - Barge | JOB | 1 | $0.00 | |
| O-028 | Hull and Structural Plating, General, 12.75 lbs. Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-029 | Hull and Structural Plating, General, 15.3 lbs. Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-030 | Hull And Structural Plating, General, 20.4 lbs. Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-031 | Hull and Structural Plating, General, 7.65 lbs. Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-032 | Hull and Structural Plating, General, Degraded Weld, Steel, Repair - Barge | JOB | 1 | $0.00 | |
| D-033 | Keel Coolers, Clean, Inspect and Hydro - Barge | JOB | 1 | $0.00 | |
| D-034 | Fathometer Transducer, General Maintenance - Barge | JOB | 1 | $0.00 | |
| D-035 | Cathodic Protection, Magnesium Anodes, Renew - Barge | JOB | 1 | $0.00 | |
| D-036 | Temporary Services, Provide - Barge Barge | JOB | 1 | $0.00 | |
| D-037 | Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-038 | Spuds, Overhaul - Barge | JOB | 1 | ||
| D-039 | Drydock - Barge | JOB | 1 | $0.00 | |
| D-040 | U/W Body, Preserve, 100 percent - Tender | JOB | 1 | ||
| D-041 | U/W Body, Preserve, 100 percent - Barge | JOB | 1 | ||
| D-042 | Decks - Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | ||
| D-043 | Hull Plating Freeboard, Preserve, 100 Percent - Tender | JOB | 1 | ||
| D-044 | Tanks, MP Fuel Service, Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| D-045 | Tanks, Potable Water, Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| D-046 | Propeller, Perform Minor Repairs and Reconditioning | JOB | 1 | $0.00 | |
| D-047 | Spud Wells, Preserve - Tender | JOB | 1 | $0.00 | |
| D-048 | Sewage Holding Tanks, Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| D-049 | Grey Water Piping, Clean and Flush | JOB | 1 | $0.00 | |
| D-050 | Sewage Piping, Clean and Flush | JOB | 1 | $0.00 | |
| O-051 | Tanks (Sewage Holding), Preserve, Partial - Tender | JOB | 1 | $0.00 | |
| O-052 | Tanks, Potable Water, Preserve, Partial, - Tender | JOB | 1 | $0.00 | |
| D-053 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect - Barge | JOB | 1 | $0.00 | |
| D-054 | Tanks, Potable Water, Clean and Inspect - Barge | JOB | 1 | $0.00 | |
| O-055 | Tanks, Potable Water, Preserve, Partial - Barge | JOB | 1 | $0.00 | |
| D-056 | Hull Plating Freeboard, Preserve, 100 Percent - Barge | JOB | 1 | $0.00 | |
| D-057 | Spud Wells, Preserve - Barge | JOB | 1 | $0.00 | |
| D-058 | Hull Plating Freeboard (Buoy Port Areas), Preserve | JOB | 1 | $0.00 | |
| D-059 | Appendages (U/W), Leak Test - Tender | JOB | 1 | ||
| O-060 | Appendages (U/W), Internal, Preserve - Tender | JOB | 1 | ||
| D-061 | Hull Fittings (Mooring and Towing), Inspect and Test - Tender | JOB | 1 | ||
| D-062 | Hull Fittings (Mooring and Towing), Inspect and Test - Barge | JOB | 1 | ||
| D-063 | Compressed Air Supply to Propulsion Shaft Seals, Installation | JOB | 1 | ||
| D-064 | Sewage Piping Renew | JOB | 1 | ||
| D-065 | Main and Boat Deck Preservation - Barge | JOB | 1 | ||
| D-066 | Weather Deck, Preserve | JOB | 1 | ||
| D-067 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 450 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(10/7/2025)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |