Attachment 1 - FY27 Hopper Groupings_Industry Day.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
USACE National Enterprise Dredging Center Hopper Contracts
Solicitation number
W912PM27HOPPR
Issued by

About this file

This is a hopper dredging contract groupings document that organizes proposed consolidated dredging projects by geographic district for the U.S. Army Corps of Engineers (USACE) National Enterprise Dredging Center. The document lists nine groupings of hopper dredging and beach nourishment projects scheduled across FY27-28, distributed among nine districts: Norfolk, Jacksonville, New Orleans, Mobile, Portland, San Francisco, Philadelphia, Savannah, Charleston, Wilmington, Baltimore, and New York. Projects are categorized as either maintenance dredging or beach nourishment work, with estimated dredging quantities ranging from 250,000 to 11,000,000 cubic yards or hours. Bid open dates span from December 2026 through August 2027, with expected award dates ranging from December 2026 through September 2027 and performance periods extending through April 2028.

The groupings specify hopper dredges as the primary or exclusive equipment type for all projects, with some locations also accepting bucket or pipeline dredges. Dredged material placement is designated for open-water placement, beach/shoreline nourishment, or confined diked placement depending on project location. Key project locations include Thimble Shoal Channel (Norfolk), Jacksonville Harbor, Calcasieu Bar, Mississippi River corridors, Lower Columbia River, Humboldt Bar, various beach nourishment projects in the Philadelphia district (Cape May, Absecon Island, Barnegat Inlet, Rehoboth, Bethany, Fenwick Island), and Savannah and Charleston harbors. The Sources Sought Notice accompanying this document indicates firms must register in the System for Award Management (SAM) and submit equipment documentation, firm information, and socioeconomic designations by September 4, 2026, at 1500 EST.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hopper List

Row Labels
Baltimore
BALTIMORE HARBOR AND CHANNELS (50 FOOT), MD
Charleston
(blank)
Jacksonville
JACKSONVILLE HARBOR, FL
KINGS BAY ENTRANCE CHANNEL
NAVAL STATION MAYPORT
Los Angeles
WORK FOR OTHERS
Mobile
FY27 GULF COAST REG HOPPER #1
New Orleans
CALCASIEU RIVER AND PASS, LA
MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO, LA
MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO, LA;CALCASIEU RIVER AND PASS, LA
Norfolk
NORFOLK HARBOR, VA
Philadelphia
BRIG. INL TO GRT EGG INL N.J.
DE. COAST FROM HENLOPEN TO FENWICK ISLAND, DE
DEL COAST CAPE HENL. TO FENWICK
DELAWARE COAST BETHANY/S. BETHANY
MANASQUAN INLET TO BARNEGAT
NJ COASTAL INLETS&BEACHES, CAPE MAY-LOWER TWNSHP
Portland
COLUMBIA AND LOWER WILLAMETTE RIVERS BELOW VANCOUVER, WA & PORTLAND, OR
COLUMBIA RIVER AT THE MOUTH, OR & WA
COOS BAY, OR
San Francisco
HUMBOLDT HARBOR AND BAY, CA
OAKLAND HARBOR, CA
Savannah
BRUNSWICK HARBOR, GA;WILMINGTON HARBOR, NC;SAVANNAH HARBOR, GA
Wilmington
(blank)
(blank)
MOREHEAD CITY HARBOR, NC
(blank)
Grand Total

Hopper Nav-CSRM Detail

Potential Groupings (Not Prioirty)District NameJob NameClass(es) of WorkAdvertising DateBid Open DateExpected Award DateEstimated Period of Performance Start DateEstimated Period of Perfromance End DateExpected Dredge TypesEstimated Total Dredging Quantity (CY)Expected Pay MeasureDredged Material Placement Categories
1NorfolkTHIMBLE SHOAL CHANNELMaintenance Dredging11/6/2612/8/262/11/273/5/278/31/27Bucket;Hopper1,570,000Cubic yardsBeach/Shoreline Nourishment; Construction and Industrial/Commercial Uses; Open-Water Placement
1JacksonvilleJACKSONVILLE HARBOR, FLMaintenance Dredging10/13/2611/12/2612/15/262/15/278/15/27Bucket;Hopper750,000Cubic yardsConfined (Diked) Placement
2New OrleansCALCASIEU BAR HD 1-25Maintenance Dredging11/2/2612/2/2612/17/261/15/274/15/27Hopper6,000,000HoursOpen-Water Placement
2MobileFY27 Mobile District IDIQ - PascagoulaMaintenance Dredging12/15/261/15/272/15/274/1/279/30/27Hopper500,000HoursOpen-Water Placement
2MobileFY27 Mobile District IDIQ - Panama CityMaintenance Dredging12/15/261/15/272/15/278/1/279/30/27Hopper250,000HoursOpen-Water Placement
2New OrleansMISS RIVER HD 1-27Maintenance Dredging12/18/266/10/276/30/272/1/288/31/28Hopper10,000,000HoursOpen-Water Placement
3PortlandWCH MAINTENANCE DREDGING - LOWER COLUMBIA RIVERMaintenance Dredging1/22/273/1/273/22/276/15/2711/15/27Hopper1,470,000Cubic yardsOpen-Water Placement
3San FranciscoWCH MAINTENANCE DREDGING - HUMBOLDT BAR & ENTRANCEMaintenance Dredging1/22/273/1/273/22/276/1/2711/15/27Hopper900,000Cubic yardsOpen-Water Placement
3PortlandWCH MAINTENANCE DREDGING - MOUTH OF THE COLUMBIA RIVERMaintenance Dredging1/22/273/1/273/22/274/1/2711/15/27Hopper1,720,000Cubic yardsBeach/Shoreline Nourishment; Open-Water Placement
3PortlandWCH MAINTENANCE DREDGING - COOS BAYMaintenance Dredging1/22/273/1/273/22/274/1/2711/15/27Hopper400,000Cubic yardsBeach/Shoreline Nourishment; Open-Water Placement
3Los AngelesPt. Mugu Beach NourishmentBeach Nourishment6/8/277/7/278/11/279/15/273/1/28600,000Beach/Shoreline Nourishment
4JacksonvilleMAYPORT O&MMaintenance Dredging2/9/273/11/274/12/276/15/2712/30/27Bucket;Hopper1,000,000Cubic yardsOpen-Water Placement
4JacksonvilleKINGS BAY ENTRANCE CHAN O&MMaintenance Dredging7/9/278/10/279/15/2712/15/273/31/28Hopper1,200,000Cubic yardsOpen-Water Placement
5New OrleansMISS RIVER & CALCASIEU BAR HDMaintenance Dredging12/18/267/15/277/30/271/10/287/31/28Hopper11,000,000HoursOpen-Water Placement
6PhiladelphiaCape May Inlet to Lower TwpBeach Nourishment6/4/277/22/278/5/2710/1/271/30/28Hopper500,000Cubic yardsBeach/Shoreline Nourishment
6PhiladelphiaABSECON ISLANDBeach Nourishment2/13/273/16/274/2/276/1/2711/30/27Hopper;Pipeline1,400,000Cubic yardsBeach/Shoreline Nourishment
6.1PhiladelphiaBarnegat Inlet to Little Egg Inlet, NJBeach Nourishment5/3/276/4/276/18/278/1/273/30/27Hopper1,800,000Cubic yardsBeach/Shoreline Nourishment
7SavannahSavannah Harbor Entrance Channel Maintenance DredgingMaintenance Dredging7/9/278/18/279/15/2712/15/273/31/28Hopper950,000Cubic yardsOpen-Water Placement
7CharlestonFY 27 RHDC Charleston DistrictMaintenance Dredging6/17/277/16/279/17/2712/15/273/31/28Hopper1,500,000Cubic yardsOpen-Water Placement
7WilmingtonFY27-28 SAD REGIONAL HARBOR 11.1 - WILMINGTONMaintenance Dredging6/30/278/3/279/5/2712/1/274/15/28Hopper900,000Cubic yardsOpen-Water Placement
8PhiladelphiaREHOBOTH/ DEWEY BEACHESBeach Nourishment4/1/275/3/275/17/277/1/2710/30/27Hopper500,000Cubic yardsBeach/Shoreline Nourishment
8PhiladelphiaBETHANY & SOUTH BETHANYBeach Nourishment4/1/275/3/275/17/277/1/2710/30/27Hopper700,000Cubic yardsBeach/Shoreline Nourishment
8.1PhiladelphiaFenwick IslandBeach Nourishment4/1/275/3/275/17/277/1/2710/30/27Hopper300,000Cubic yardsBeach/Shoreline Nourishment
9SavannahBrunswick Harbor Entrance Channel Maintenance DredgingMaintenance Dredging7/9/278/18/279/15/2712/15/273/31/28Hopper1,600,000Cubic yardsOpen-Water Placement
9WilmingtonFY27-28 SAD REGIONAL HARBOR 11.2 - MOREHEAD CITYMaintenance Dredging7/19/278/20/279/24/2712/1/274/15/28Hopper500,000Cubic yardsOpen-Water Placement
9BaltimoreBaltimore Harbor and Channels (York Spit)Maintenance Dredging8/1/279/1/2710/15/2711/15/274/13/28Hopper1,500,000Cubic yardsOpen-Water Placement
TBDNew YorkFire Island Inlet to Montauk Point (FIMP), NY - Contract 3B - SouthamptonBeach Nourishment4/15/276/15/277/15/2711/15/273/15/28Hopper1,700,000Cubic yardsBeach/Shoreline Nourishment

File details come from the government source that posted it. Updated .