Attachment 1_FSSO PWS Dragoon Inn.pdf

PDF 592 KB Posted

Attached to
Full Food Service DFAC
Solicitation number
W912PB26RA036
Issued by

About this file

This is a Performance Work Statement (PWS) for a full food service contract at the Dragoon Inn dining facility (Building 612) located at Rose Barracks in Vilseck, Germany, beginning in July 2026.

The contractor shall provide comprehensive food service operations including dining facility management, food preparation, grab-and-go meal options, headcount management, food service sanitation, and janitorial duties. Standard operating hours are 0515–1930 Monday–Friday and 0700–1930 Saturday–Sunday, with meal service periods including breakfast (0730–0930), lunch (1130–1300), and dinner (1700–1830) on weekdays, and brunch (0930–1300) and supper (1700–1830) on weekends. The facility has a seating capacity of 796 with 4 regular menu serving lines, 2 short-order lines, and estimated average daily diners of approximately 10,799 at breakfast, 6,165 at lunch, and 8,553 at dinner on weekdays. The contractor must provide all personnel, uniforms, equipment, supplies, and supervision except for government-furnished property. Key requirements include compliance with TB MED 530 food safety standards, implementation of a Quality Control Plan with documented procedures, maintenance of proper food preparation temperatures, adherence to Army Food Management Information System (AFMIS) protocols, and performance of sanitation and facility maintenance. Key personnel requirements include a Project Manager with three years of Army dining facility management experience, a Dining Facility Manager with five years of DoD DFAC experience and current certifications, Lead Chefs and Cooks with food handler and sanitation certifications, and support staff with appropriate food service training. The contractor must also complete multiple training programs including Anti-Terrorism Level I training within 15 days of contract start, OPSEC training within 30 days, and iWATCH training within 30 days. Performance will be evaluated monthly against established standards requiring greater than 95 percent compliance with inspection checklists and zero safety or environmental discrepancies. All contractor labor hours must be reported through the eCMRA system, and numerous deliverables including Quality Control Plans, training schedules, contingency plans, and various operational reports are required at specified intervals throughout the contract period.

View the file

Other files

File Type Posted
FSSO PWS Dragoon Inn V3.pdf PDF
FSSO PWS Dragoon Inn V3.docx DOCX document
Attachment 2_Government Furnished Property.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

December 12

PERFORMANCE WORK STATEMENT (PWS)

Full Food Service Contract for

Dragoon Inn, Building 612 Rose Barracks, Vilseck, Germany

(July 2026)

Part 1 General Information

Vision Statement: The mission of the Dragoon Warrior Inn is to fuel the warfighter and enhance mission readiness as a key component of the Holistic Health and Fitness (H2F) program. It must provide flexible and efficient access to nutritious, high-quality meals, offering both traditional sit-down dining and convenient on-the-go options to support the dynamic needs and peak performance of every Warrior.The service outlined in this requirement encompasses dining facility management functions, food preparation, facility sanitation and janitorial duties. Performance criteria for overall dining facility duties fall under contractor responsibilities.

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject,either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing inrelationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal services contract to perform the requirements described in the PWS and contract. The Contractor shall provide dining facility management, food preparation, headcount, food service sanitation and janitorial duties at the Dragoon Inn Dining Facility located at Rose Barracks, Vilseck, Germany. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all supervision, labor, personnel, supplies and equipment not provide by the Government, except for property identified in Vilseck, Germany Government Furnished Property (GFP) attachment, to perform activities that comprise the full operation of an Army Warrior Restaurant. GFP is addressed in PWS Part 3 per Government Property (GP) and services.

1.2 Background: This initiative seeks to deliver comprehensive food service contracted support at the Dragoon Inn Dining Facility, located in Building 612, Rose Barracks, Vilseck, Germany. Vilseck, Germany, serves as the base for the 2D Cavalry Regiment, which provides assistance to the 7ATC Command, USAG Bavaria, as well as to the civilian workforce and Soldiers residing at this location. See Technical Exhibit 3 – Estimated Workload Data. COR will provide quarterly projections.

1.3 Scope: The Contractor shall provide dining facility management, food preparation, grab and go meal options, headcount, food service sanitation and janitorial duties at the Dragoon Inn Dining Facility located at Rose Barracks, Vilseck, Germany.

1.4 Objectives: Full food service management, food preparation, grab and go meal options, headcount, food service sanitation and janitorial duties is required to support the Garrison. The contractor shall provide all personnel, transportation and supervision necessary to perform food service management, food preparation, headcount, food service sanitation and janitorial duties as defined in this Performance Work Statement, with the exception of Government Furnished Property (GFP).

1.5 General Information:

1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which the government is assured that the work complies with the requirement of the contract.

The Quality Control Plan shall be provided within thirty (30) calendar days after contract award to the COR and within five (5) working days when changes are made thereafter (Deliverable 0005). After acceptance of the quality control plan the contractor shall receive the Contracting Officer Representative’s acceptance in writing of any proposed change to the QC system. At a minimum, the contractor's QC plan shall contain the following:

1.5.1.1 Provisions:

1. Organization chart which provides for QC personnel to have direct accountability to the Contractor's top management.

2. An inspection system covering all tasks and services required by this contract.

3. A schedule shall include areas to be inspected on a routine or unscheduled basis, frequency of inspections, documentation forms, and individuals that will perform the inspections and the follow-up procedures.

4. Method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable.

5. Method of documenting and enforcing QC operations.

6. Process action plan to correct and prevent continuous deficiencies and defects.

7. Methods of communication with the Government regarding quality and contract performance.

8. Customer/diner feedback.

9. Monthly reporting system to the Contractor's home office.

10. A cleaning schedule that ensures the cleanliness of the Dining Facility in accordance with TRI SERVICE FOOD CODE TB MED 530, paragraph 6-501.12. In addition, the schedule shall include the periodic in-depth cleaning services. (Deliverable 0024).

1.5.1.2 Elements of the Plan:

1. Personnel health and hygiene.

2. Workplace Safety.

3. Fire prevention and evacuation.

4. Environmental protection.

5. Energy conservation.

6. Employee and Sanitation training. (IAW the paragraph 5.1.2.1)

7. HAZMAT Program.

8. Hazard communication standards (OSHA) for use of chemicals

9. Hazard Analysis Critical Control Point (HACCP).

10. Government Property.

11. Security.

12. Key control. (IAW the paragraph 1.7)

13. Pest control

14. Food safety

15. Facility maintenance

16. Menu Planning w/ Dietitian Approval

17. Risk Management Log (DA Form 7800)

1.5.1.3 Inspection Techniques:

1. Random sampling (inspections)

2. Planned sampling (inspection)

3. Customer surveys

1.5.2 Quality Assurance: The Contractor shall have work complete and ready for inspection in accordance with all terms of the task order. The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan.

This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)

deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: Work shall be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the COR. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

NAME OF AMERICAN HOLIDAY DATE

New Year Day January 1st Martin Luther King Memorial Day 3rd Monday in January President Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th

1.5.3.2 Host Nation Holidays: Work shall be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the COR.

NAME OF GERMAN NATIONAL

AND LOCAL HOLIDAY

DATE

New Year January 1st Epiphany January 6th Good Friday Varies yearly Easter Sunday Varies yearly Easter Monday Varies yearly Labor Day May 1st Ascension Varies yearly Whit Sunday Varies yearly Whit Monday Varies yearly Corpus Christi Varies yearly Day of German Unity October 3rd All Saints' Day November 1st Christmas December 25th St. Stephen's Day December 26th

1.5.4 Operating Hours: The Contractor is responsible for conducting business seven (7) days per week, between the hours of 0515 to 1930, Monday – Friday; and between the hours of 0700 to 1930, Saturday, Sunday, and Holidays, and Training Holidays, except when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings during the week and Holidays. The hours of operation for the DFAC Meal Schedule are shown below. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

Mon-Fri: Breakfast 0730-0930, Lunch 1130-1300, Dinner 1700-1830.

Sat, Sun & Holidays and Training Holidays: Brunch 0930-1300, and Supper 1700-1830.

In the event of inclement weather, for a late work call the Breakfast hours 0800-0930, for post shutdown the facility will operate on Brunch and Supper hours, and if operations are cancelled during the duty the dinner hours 1600-1730. (This is the standard operating hours for the Dragoon Inn).

1.5.4.1 Expanded Serving Hours: Expanded meal serving hours may be required. Services to be provided or discontinued shall be within 48 hours of advance government notice. Service shall be invoiced in accordance with CLIN entitled “Expanded Services.” Note: Government payment will be made on a prorated hourly rate; e.g., if service is extended for 45 minutes, payment will be made at ¾ of the hourly rate.

1.5.5 Training Holidays: USAREUR-AF has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities if scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday.

However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.

1.5.6 Place of Performance: The work to be preformed under this contract will be at the Vilseck, Germany, Rose Barracks, Building 612.

1.6 Security Requirements: The following information is provided on security related matters.

1.6.1 Security Program: The Contractor or any representative of the Contractor entering DoD, USAREUR, or local locations to perform contract requirements shall abide by all security regulations and may be subject to security inspections IAW AE Regulation 525-13, Military Operations, Antiterrorism. Contractor personnel and property shall be subject to search and seizure upon entering, while on, and upon leaving the DoD, USAREUR, or local locations pursuant to regulatory guidance.

All Contractor personnel shall conduct themselves IAW acceptable business decorum at all times. The Contractor shall remove any individual from the site whose continued presence or employment on this contract is deemed by the KO or COR to be contrary to the public interest, deemed to adversely affect health, morale, welfare, or good order and discipline on the installation, or inconsistent with the best interests of national security.

Meal Serving Hours – Dragoon Inn Dining Facility Rose Barracks, Building 612 Vilseck Germany

1.6.2 Personnel Security Clearance Requirements: N/A

1.6.3 Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe Regulation (AE) 190-16 Installation Access Control and AE 604-1 for Germany specific contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or AE Regulation 604-1, the regulation takes precedent.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

AE Reg 190-16 and AE 190-16-G German translation can be found on the following website:

https://media.defense.gov/2017/Apr/27/2001921546/-1/-1/0/AER190-16.pdf.

1.6.3.1 Installation Pass Log: In addition, the Contractor shall provide the COR, an Initial Installation Pass Log within 3 calendar days prior to performance after contract award.

(Deliverable 0020). The log must at a minimum contain the following information: Name, Position, ID number and Contact number. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log (Deliverable 0020).

1.6.3.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within five (5) working days.

(Deliverable 0029).

1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 5 working days. (Deliverable 0029).

1.6.3.4 Common Access Cards (CAC) and CAC Log: The Contractor shall provide the following information: Last, First Middle Name, Cadency Name, Personal identifier (e.g. Social Security Number, Federal Identification Number, or Tax Identification Number), date of birth, primary email address (this email address will be used to contact the individual) to the COR with 15 calendar days after award (unless circumstances require otherwise and as directed by https://media.defense.gov/2017/Apr/27/2001921546/-1/-1/0/AER190-16.pdf the Contracting Officer) (Deliverable 0030). The Contractor shall ensure safeguarding of Personally Identifiable Information (PII) and comply with requirements under 1.22.5.

1.6.3.4.1 The Contractor shall provide a CAC log within the first 30 calendar days after contract award and within five (5) days after changes have been made (Deliverable 0035) (unless circumstances require otherwise and as directed by the Contracting Officer). The COR will provide format and content for the log during the post award meeting. Note - CACs are Government property and must be accounted for.

1.6.4 Background Checks: Required to access military installations.

1.6.4.1 U.S. Citizen: Contractors that work with or teach youth under the age of 18 years are subject to U.S (and host nation if OCONUS) background checks. The Requiring Activity Manager will determine the extent of background checks required. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within ten (10) calendar days of receipt by the Contractor, identifying such with the appropriate contract number (Deliverable 42). The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within ten 10 calendar days of receipt by the Contractor, identifying such with the appropriate contract number (Deliverable 0042). When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.

1.6.4.2 Local Nationals and Third Country Nationals: See PWS Para 1.6.3 and 1.26.3.3.

1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).

1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.

1.7 Key Control: The Contractor shall establish and maintain a Key Roster and Lock Control Program as part of the Quality Control Plan. The Contractor shall safeguard keys furnished to the Contractor by the government. The contractor shall notify the COR of loss or damged Keys within 1 hour of discovery, addionally the contractor will submit a work order to DPW for a replacement key. The Contractor shall utilize an automated key control system or an equivalent substitute as a means of key control. The Contractor shall designate in writing to the COR a key custodian to manage the key control program by the start of full performance at the post award conference or within five (5) calendar days after contract start (which occurs first).

(Deliverable 0007, 0008 & 0009).

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The COR and/or ACOR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the COR and/or ACOR will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Project Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.

Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the COR. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel:

1.10.1 The Project Manager (PM):

The PM shall be a single point of contact for the KO and Contracting Officers Representative (COR). Project Manager shall have the authority to obligate the company and be responsible for overall performance (to include subcontractors) of the task order to meeting the specified performance standards. The name, work and mobile phone and email address of both the Project Manager (PM) and alternate shall be provided to the Government as part of the Contractor’s proposal. The PM shall attend meetings (menu boards, food cuttings, sanitation training) with the Government in support of the contract and ensure required management staff support meetings in support of the contract. During any absence of the PM, only one (1) alternate shall have full authority to act for the Contractor on all matters relating to work performed under the resulting contract. (Deliverable 0001)

Minimum Qualifications:

a. Speak and write English at a language proficiency equal to Level 3. (AEP 690-70, Appendix H)

b. Communicate effectively on complex matters and compose correspondence and other written communications about the work for which they are responsible.

c. Three (3) years’ experience as an assistant manager, or manager, of a United States Army DFAC or at least eight (8) years of progressive management, or assistant management, experience working in a food service operation providing complete meal service (breakfast, lunch, and dinner) in either a cafeteria style, or multi-entree operation, setting. Military food service experience in the pay grade of E-7 or above may be credited as management experience for this position.

d. Two (2) year experience using the Army Food Management Information Systems (AFMIS) within the past five (5) years, from the date of close of solicitation.

e. Have a current Food Protection Manager certification and Food Handlers as defined in Tri Service Food Code TB Med 530 para 2-102.20.

1.10.2 Dining Facility Manager and Alternate Dining Facility Manager:

The Dining Facility Manager (DFM) oversees the entire operation of the dining facility and is directly responsible for all food service staff. The DFM must possess comprehensive knowledge of all aspects of dining facility operations. The primary responsibilities of the DFM encompass personnel management tasks such as work scheduling, menu planning, requesting and receiving subsistence, food preparation and serving, as well as ensuring safety, sanitation, and security. Additionally, the DFM is responsible for headcounting and cash turn-in, managing the Army Food Management Information System (AFMIS), overseeing account management, inventory management, and the operation and maintenance of facilities and equipment. Furthermore, the DFM coordinates support for the dining facility and participates in the Installation Food Program.

Minimum Qualifications

a. Speak and write English at a language proficiency equal to Level 3. (AEP 690-70, Appendix H)

b. Communicate effectively on complex matters and compose correspondence and other written communications about the work for which they are responsible.

c. Shall have five (5) years’ experience working in a Department of Defense (DoD) DFAC (providing complete meal service: breakfast, lunch and dinner) within the last ten (10) years, and three (3) years’ experience as an Assistant Manager or Manager of a DoD DFAC.

Experience shall also include as a minimum two (2) years’ experience using automated food management systems within the past five (5) years.

d. Have a current 40-hour Sanitation Certification as defined in TB Med 530. *

e. Have a current Food Handler Certification as defined in TB Med 530. * Military food service experience in the pay grade of E-7 or above will be credited as management experience for this position.

*If contractor does not have current Sanitation Certification and Food Handler Certification as defined in TB Med 530 at contract award contractor will be provided certification class in Germany. Contractor will be responsible for any travel costs incurred to attend the certification class.

1.10.3 Lead Chef

Minimum Qualifications:

a. Speak and write English at a language proficiency equal to Level 2. (AEP 690-70, Appendix H)

b. Be certified and provide proof of certification (Gesellenbrief or international equivalent) to the COR (Deliverable 0012).

c. Certifications shall be validated by the contractor, in English, and provided to the COR ten

(10) days prior to the employee’s start of contract performance. Military food service experience in pay grade of E-6 or above will be credited as experience for this position. Lead Cooks that have worked within the past ten (10) years, shall have five (5) years’ experience working in a food service operation providing cafeteria style or multi-entrée operation providing complete meal service (breakfast, lunch, and dinner).

d. Two (2) years must have been served as a Lead Cook.

e. Have a current Food Handler Certification as defined in TB Med 530/NAVMED P-5010-

1/AFAN 48-147 IP

f. Have a current 40-hour Sanitation Certification as defined in TB Med 530/NAVMED P-5010-

1/AFAN 48-147 IP

1.10.4 Chef

Minimum Qualifications:

a. Speak and write English at a language proficiency equal to Level 2. (AEP 690-70, Appendix H)

b. Be certified and provide proof of certification (Gesellenbrief or international equivalent) to the COR at time of submission of the installation pass requirement (DELIVERABLE 0022).

c. Certifications shall be validated by the contractor, in English, and provided to the COR ten

(10) days prior to the start of the contract. (Deliverable 0013). Military food service experience in pay grade of E-1 to E5 or above will be credited as experience for this position. Cooks that have worked five (5) years or more in a US Army DFACs as a cook and can provide validated proof of past employment will not be required to submit the Gesellenbrief or international equivalent

d. Have a current Food Handler Certification as defined in TB Med 530/NAVMED P-5010-

1/AFAN 48-147 IP

1.10.5 Ration Clerk

Minimum Qualifications:

a. 4 hours of Basic Food Handlers Training as specified per Tri Service Food Code TB Med 530, para 2-501.11.

b. Two (2) years experience using automated food management systems within the past five

(5) years from the date of close of the solicitation.

c. Be proficient with computer systems and Microsoft Programs.

d. Heavy lifting, 45 pounds and over

e. Heavy carrying, 45 pounds and over

d. Prolonged standing, 50 minutes continuous.

1.10.6 Administration Clerk

Minimum Qualifications

a. Speak and write English at a language proficiency equal to Level 3. (See Regulation AEP 690-70, Appendix H)

b. Two (2) years experience using automated food management systems within the past five

(5) years from the date of close of solicitation.

c. Be proficient with computer systems and Microsoft Programs.

d. Cashier experience in handling Credit Card and Cash transactions.

1.10.7 Headcount/Cashier

Minimum Qualifications

a. Speak and understand English at a language proficiency equal to Level 3. (See Regulation AEP 690-70, Appendix H)

b. Two (2) years experience using automated food management systems within the past five

(5) years from the date of close of solicitation.

c. Be proficient with computer systems and Microsoft Programs.

d. Cashier experience in handling Credit Card and Cash transactions.

1.10.8 Dining Facility Attendants

Minimum Qualifications

a. Speak and understand English at a language proficiency equal to Level 2. (See Regulation AEP 690-70, Appendix H)

b. 4 hours of Basic Food Handlers Training as specified per Tri Service Food Code TB Med 530, para 2-501.11.

1.10.9 Health Examinations:

The Contractor shall provide health certificates for each employee prior to working in Food Service Operations IAW the Tri Service Food Code TB Med 530. These certificates must be updated ten (10) calendar days prior to contract start date and annually on the date contract was awarded (Deliverable 0011). Personnel with evidence of communicable disease, infected wounds, open sores, or acute respiratory infection, shall be referred to a doctor to receive written clearance before returning to work. Personnel with a health problem(s) shall not be permitted to work in any capacity where there is likelihood of food or food contact surface contamination with pathogenic organisms or transmitting disease agents to others.

1.10.10 Personnel Health and Hygiene:

Personnel shall maintain compliance with sanitation and food safety standards IAW the TB Med 530. The Contractor shall notify the COR in writing any time an employee is diagnosed with an illness due to Salmonella Typhi, Shigella, Spp, Escherichia coli, 0157:H7, or hepatitis A virus. Personnel with these or other health problems, i.e. persistent sneezing, coughing, or runny nose shall not be permitted to work in the dining facility. Personnel relieved of work due to illness must have doctor’s clearance before returning to work. The Contractor shall provide a copy to the COR within two (2) hours upon notification (Deliverable 0012). Contractor personnel shall wash their hands before handling clean utensils, equipment or starting food preparation and between the handling of raw and cooked or other ready to eat foods.

Contractor personnel shall also wash their hands after smoking tobacco products. Maintain and keep fingernails clean, cut short and devoid of nail polish and other nail products. Tobacco of any form shall not be used in or near the dining facility. The use of alcoholic beverages or illegal drugs by Contractor personnel, while on duty, is strictly forbidden. Standards specified in

TB MED 530 /NAVMED P-5010-1/AFAN 48-147 IP.

1.11 Identification of Contractor Employees:

All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12 Contractor Travel:

Contractor Dining Facility Manager shall be required to travel to USAREUR-AF sponsored one day quarterly food service management board (FSMB) meetings, and attend meetings, conferences, and training. Contractor travel expenses will be included in firm fixed price of contract. Projected locations for the FSMB include Stuttgart, Wiesbaden, Grafenwoehr, Vilseck and Kaiserslautern. Failure to attend the FSMB will result in a NonConformance Report from the COR or Contracting Officer.

1.13 Other Direct Costs:

N/A

1.14 Data Rights:

The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government.

These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.15 Non-Disclosure Requirements:

Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorize Government personnel or upon written approval of the Contracting Officer.

The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.

1.16 Non-Disclosure Statements:

The Contractor shall provide signed non-disclosure agreements to the Government no later than 3 calendar days prior to performance. (Deliverable 0031) Disclosure of information by Contractor personnel may result in Contractor personnel removal from performance under this contract.

1.17 Organizational Conflict of Interest (OCI):

Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI (Deliverable 0032). The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.18 Phase In /Phase Out Period:

To facilitate a seamless and organized transition of responsibility for the Dining Facility and its food operations from the current Contractor to the new Contractor, the Contractor is required to engage in a phase-in period during which the incumbent Contractor will continue to deliver the services. This phase will begin upon the contract award and will last for a duration not exceeding one hundred and twenty (120) calendar days. Within fifteen (15) calendar days from the commencement of the phase-in period, the Contractor must finalize all hiring processes, which include, but are not limited to, initial background checks, and must submit all necessary background check forms and installation access forms (in accordance with Army Europe Regulation (AER) 604-1, Personnel Security Screening, Local National Screening Program (LNSP); AR 380-19, Information Systems Security; and AER 190-16, Installation Access Control) to the Contracting Officer Representative (COR), along with eligibility requirements, etc., for all personnel needed to fulfill the Contract requirements and to be on-boarded by the start of full performance. Throughout the phase-in period, the Contractor is expected to familiarize themselves with the performance requirements to ensure the commencement of full service delivery on the contract start date. The government will provide training for the web-based systems that will be utilized by the Manager, Ration and Administration Clerks, and Headcount Personnel. The phase-in period will specifically apply to the Dining Facility Manager, Ration Clerks, Administration Clerks, Headcount Personnel, and Lead Cooks. This period will last for 120 days following the contract award. The Contractor is responsible for completing all necessary steps for the assumption of operations during the phase-in period and must fulfill all requirements as outlined in the contract prior to the initiation of full performance.

Phase Out Period: The phase-out period takes place at the conclusion of the contract performance period when, if required, a transition to a new contractor occurs. During the phase-out period, the contractor is obligated to undertake all necessary actions to ensure a smooth transition.

1.19 Safety:

The Contractor shall follow AR 385-10, The Army Safety Program and TB MED 530 530/NAVMED P5010-1/AFAN 48-147 IP Paragraph 8-201.14.

1.21.1 Host Nation Safety Laws and Regulations:

Accident Report /Occupational Safety and Health Act (OSHA). The contractor shall provide a verbal report within one (1) hour and written follow-up report within four (4) hours after occurrence to the COR using DA Form 285. Original and one copy shall be submitted to the COR within three (3) calendar days after the occurrence whenever an accident occurs involving personal injury IAW AR 385-10, chapter 3. (Deliverable 0010).

1.22 Environmental Compliance:

The contractor shall follow installation, local, state and federal policies concerning recycling and environmental waste program. TB MED 530/NAVMED P-5010-1/AFAN 48-147 IP Paragraph 5-5, Environmental Compliance and Protection Manual, MCO P5090.2

1.23 Required Training:

The following provides information on training requirements.

1.23.1 Anti-Terrorism (AT) Level I Training:

All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within (15) calendar days after the contract start-date or within 30 calendar days of new employees' commencing performance (Deliverable 0006) Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion (Deliverable 0006) for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within fifteen (15) days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training

(Deliverable 0006) every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies

1.23.2 OPSEC SOP/Plan requirements.

The contractor shall develop an OPSEC Plan/SOP within 90 calendar days of contract award to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. The SOP/Plan will include the government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The Contractor shall comply with all applicable Department of Defense (DoD) security regulations and procedures during the performance of this contract. The Contractor shall not disclose and must safeguard procurement sensitive information, computer systems and data, Privacy Act data, and government personnel work products that are obtained or generated in the performance of this contract. Neither the Contractor nor any of its contract service providers shall disclose or cause to disseminate any information concerning operations of military activities. Such action(s) could result in violation of the contract and possible legal actions.

(Deliverable 0026)

1.23.3 OPSEC Training:

All Contractor employees, including subcontractors, shall complete Level I OPSEC training within thirty (30) days of employment under this contract (Deliverable 0027). Verification of the training shall be provided to the COR within five (5) days after completion of the training (Deliverable 0027). OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months (Deliverable 0027). Verification of the training shall be provided to the COR within five (5) days after completion of the training (Deliverable 0027). If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training.

Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within five (5) days after completion of the training (Deliverable 0027)

1.23.4 iWATCH Training:

The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) days after the contract is awarded and within thirty (30) days after new employees commence contract performance. (Deliverable 0033). Verification of the training shall be provided to the COR within five (5) days after completion of the training (Deliverable 0033). Training slides can be found on the Army OneSource we site:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.

1.23.4.1 Information Assurance ( IA ) Training:

N/A

1.23.4.2:

All Contractor employees, including subcontractors, requiring access to Government information systems shall complete the Department of Defense (DoD) IA Cyber Awareness Training within 15 day before contract start date or effective date of incorporation of this requirement into the contract, whichever applies (Deliverable 0034). Fifteen (15) days after employment of new personnel. Verification of the training shall be provided to the COR within five (5) days after completion of the training (Deliverable 0034)

1.23.4.3:

All Contractor employees, including subcontractors, working information technology (IT)/IA functions shall comply with DoD and Army training requirements per Information Assurance Training Certification and Workforce Management DoD Directive (DoDD) 8570.01, Information Assurance Workforce Improvement Program DoD 8570.01-M, and Information Assurance AR 25-2 within thirty (30) calendar days of employment. Training is available at https://ia.signal.army.mil/DoDIAA/default.asp.

1.23.4.4 All Contractor employees, including subcontractors, performing services under this contract with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS), the web address is https://atc.us.army.mil/iastar/index.php. Verification of registration shall be provided to the COR within five (5) days after registration. (Deliverable 0035). Contractor personnel must complete refresher training every 12 months (Deliverable 0035). Verification of the training shall be provided to the COR within five (5) days after completion of the training (Deliverable 0035).

1.23.5 Personally Identifiable Information (PII):

Contractor employees, including subcontractors, performing services under this contract with access to PII and Government information shall complete “Identifying and Safeguarding PII” within 30 calendar days of employment. Contractor personnel shall complete refresher training every twelve (12) months from initial completion. The Contractor shall provide the COR a copy of the training certificates for its employees no later than five (5) days after completion (Deliverable 0036). Training is available at http://iatraining.disa.mil/eta/piiv2/launchPage.htm

1.24 Authorization to Perform Services in Germany:

1.24.1:

Contractors performing services in the Federal Republic of Germany (FRG) shall comply with German law. The Contractor shall determine whether performance requires registration with German authorities or authorization to do business in Germany and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the Contractor shall determine what documents or authorization its employees and any subcontractor employees must possess to work in Germany. The Contractor shall ensure affirmatively that its employees and subcontractor employees possess such documents or authorizations.

1.24.2:

Contractor employees who: (a) are not nationals of Germany or other European Union countries; (b) are not members of the force, the civilian component or their dependents; or c) do not have assimilated status under Articles 71, 72, or 73 of the Supplementary Agreement to the NATO SOFA shall possess work and residence permits.

1.24.3:

By acceptance of and performance under this contract, the Contractor affirms that it has complied with the requirements above. Compliance with this requirement and German law is a material contract requirement. Noncompliance by the Contractor or subcontractor at any tier shall be grounds for issuing a negative past performance evaluation and terminating this contract for default.

1.25 Notice to Proceed:

Reserved

1.26 Electromagnetic Compatibility Directive:

The Contractor certifies that all electrical and electronic equipment and appliances furnished are in compliance with the Electromagnetic Compatibility Directive 2014/30/EU. For radio transmitting and telecommunication devices furnished in the Federal Republic of Germany, the Contractor certifies that all such items have been approved by the Bundesamt fuer Zulassungen. Any penalties for noncompliance imposed by the Government of the European country where the equipment or appliances are delivered or product liability claims caused by interference generated by furnished appliances or equipment are solely the responsibility of the Contractor.

1.27 Government Property and Services:

N/A

1.28 Conventional Forces Europe (CFE) Treaty Verification Inspection:

Contractor-owned or controlled structures and containers located on U.S. Government installations are subject to short-notice inspections by CFE treaty inspection teams. The Government will endeavor to provide the Contractor as much notice as possible in the event of such inspections. The contractor shall provide access to such structures and containers at the request of the Government. The Contractor shall report such inspections to the KO through the COR in writing within ten (10) calendar days of completion of the inspection. Contractor-owned or controlled structures and/or containers on U.S. installations may have to be inspected to comply with the CFE treaty even if Contractor personnel are unavailable to provide access.

Any costs borne by the Contractor or any impact on contract performance as a result of the inspection will be a matter of negotiation between the Contractor and the KO.

1.29 Personnel Clearance Determination:

The Contractor shall initiate background check requirements for all Contractor employees IAW DOD, HQDA, USEUCOM, USAREUR-AF, and local policy. Upon favorable review and initiation of the PSI, the government may grant contractor personnel temporary access pending final adjudication of the PSI. The Contractor shall request Information Technology (IT) eligibility for an employee requiring access and passwords to the government-furnished data systems, within two (2) days after receipt of CAC. The Contractor shall ensure Local Nationals (LNs) and Third Country Nationals (TCNs) applicants, who are or who are not residents of Germany meet the minimum 12 consecutive month German residency requirement; and U.S. applicants who meet the Standard Form (SF) 85P suitability requirement, are in compliance with the Army Europe Regulation (AER) 604-1, Personnel Security Screening, Local National Screening Program (LNSP); AR 380-19, Information Systems Security; and AER 190-16, Installation Access Control, by the time their applications are received by the government. The 12 consecutive month Germany residency requirement applies to all contractor employees. The Contractor shall complete all hiring actions that includes but not limited to initial background checks, meeting suitability requirements, etc. no later than fifteen (15) calendar days after contract award. For any replacement contractor employees, the fifteen (15) calendar day requirement also applies for submission of background check forms to the COR.

1.30 Contingency Plan:

The Contractor shall provide a contingency plan NLT than ten (10) calendar days prior to the start of full contract performance (Deliverable 0002).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .