*** ATTACHMENT 1 FOR SOLICITATION HC101321QA536 ***

ATTENTION HERNDON, VA LOCATION: THIS REQUIREMENT MUST BE

ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO

GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR RU05AUG217279,

MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN

HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS.

ADDITIONALLY AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL

SEPARATION FROM TSR RU05AUG217279. THE 50 METER SEPARATION IS WAIVED

INSIDE BLDG 13555 FOR HERNDON, VA LOCATION.*** 7. THE TELECOM PROVIDER

MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR TECHNICAL REVIEW

SHOWING THE ROUTES FROM THE COMMERCIAL M. REMARKS CONTINUED:

DEMARCS TO THE SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS.

DRAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE

REQUIREMENTS, TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD), AND FIBER

ROUTES RED LINED END TO END SO THE GOVERNMENT CAN CONFIRM PHYSICAL

END TO END DIVERSITY REQUIREMENTS ARE MET. ADDITIONALLY, THE VENDOR

IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH CONNECTIVITY

DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF PRESENCE

(POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.

THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16

(DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL.MI L) FOR HISTORICAL

PURPOSES. 8. THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL

STRENGTH IN DBM) ON THE EXTENSION FROM COMMERCIAL POP TO THE

GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z" LOCATION

PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE

WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM. 9. THE

VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY

LOCATIONS, IAW UNIQUE INSTALLATION FACTORS. 10. THE VENDOR MUST

CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION A T BOTH

LOCATIONS. 11. THE VENDOR MUST CONTACT DISA GOC IP BACKBONE

ENGINEERING AND IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO

ESTABLISH THE COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-

8627, (D) 418-8627. 12. THE VENDOR MUST CONTACT DISA GOC TIER-II

ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING.

PHONE: (C) 618-418-8627, (D) 418-8627. 13. THE PROVIDER MUST CONDUCT A

SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL

EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A"

LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR

EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION

BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR

MUST ENSURE TEST SETS ARE N. REMARKS CONTINUED: PLACED AT THE DROP

SIDE AT THE "A" LOCATION AND AT THE "Z" LOCATION. TESTING MUST BE

SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE

TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL

ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT

DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW

ITU-T-Y.1564.

1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS: (A) FIBER

TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB

ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS

AS DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED REACH OPTICS ARE

USED THAT CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE VENDOR

WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY. (B) COMMITTED

INFORMATION RATE (CIR): 10GB. (C) ETHERNET FRAME SIZE WILL BE

CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU) OF 9000

OCTETS (BYTES) JUMBO FRAMES. (D) NO NETWORK INTERFACE UNIT,

DEDICATED PATH. (E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO

BE ENGINEERED INTO CIRCUIT. (F) TESTING CRITERIA: VENDOR MUST TEST THE

CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING

METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT

THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE: ETHERNET

FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9000 BYTES. (G) LINE MUST

REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,

SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR

BETTER. (H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT

OF TROUBLE. (I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN

ANY CIRCUIT OUTAGES. (J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS

CENTER. (K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE

AND ADMINISTRATION MONITORING OF ETHERNET CIRCUIT. O. REMARKS

CONTINUED: (L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF

THE GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D) 418-8627. 2.

VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND

MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3.

INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS. 4.

VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE

PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 5.

VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO

BEGINNING THEIR END-TO-END TESTING. 6. ALL EQUIPMENT AND CIRCUIT

PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA GOC IP BACKBONE

ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C) 618-

418-9950, (D) 418-9950 TOLL FREE: 855-868-9950. 7. DD FORM 1368 WILL BE

SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY RNSOC, SCOTT AFB,

IL. GUIDANCE ON SUBMISSION IS AVAILABLE AT

<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>. CLICK ON "DISA-DITCO

CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION

PROCEDURES."

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM LINE

CODE: OPTICAL 1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY

DOCUMENTED, SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT

AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627. 2. ERROR PERFORMANCE: ERROR

PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER

THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN

99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10

GIGABIT HIGHEST FRAME RATE,AND SHALL MEET ITU-T-Y.1564 STANDARDS.

JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC. 3.

MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL P. REMARKS

CONTINUED: BE GREATER THAN 24 HOURS. 4. ROUND TRIP DELAY (RTD) FOR

THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN MILLISECONDS FROM THE

CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S

SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR

EQUAL TO 10 (10MS (<450)/15MS (450-1000)/ 20MS (1000-1500)/29MS (>1500))

MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE

GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE

TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS

PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.