ATTACHMENT 1 FOR SOLICITATION HC101320QB253.pdf
PDF 9 KB Posted
- Solicitation number
- HC101320QB253
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101320QB253.pdf | ||
| Solicitation Sample Vendor Block Diagram and Circuit Path Maps_Version2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 FOR SOLICITATION HC101320QB253
TELECOMM PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND TRIP
DELAY (RTD) FROM THE CUSTOMER "A" LOCATION TO THE CUSTOMER "Z"
LOCATION. 11. VENDOR MUST PROVIDE LIGHT LEVEL READINGS (DB LOSS) ON
EXTENSION FROM COMMERCIAL POP TO GOVERNMENT SERVICE DELIVERY
POINT (SDP) AT THE "Z" LOCATION PRIOR TO CIRCUIT TURN UP TO THE
GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE
ADJUSTED TO -3 TO -9. 12. VENDOR MUST CONDUCT WALK-THROUGH SITE
SURVEY PRIOR TO INSTALLATION AT THE "Z" LOCATION ONLY. 13. VENDOR
MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION
GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND
ACTIVATION PROCESS. D312-418-9935/9913, L. PURPOSE STATEMENT CONTINUED:
C618-418-9935/9913. 14. PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR
TEST FROM THE DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP
INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THE
GOVERNMENT'S SDP AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION
BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP AT THE "Z"
LOCATION. VENDOR MUST ENSURE A TEST SET IS PLACED AT THE DROP SIDE OF
TELECOMM PROVIDER'S OR LOCAL ACCESS PROVIDERS FDP AS APPLICABLE AT
THE "A" LOCATION AND A SECOND TEST SET AT THE END OF THE FIBER JUMPERS
TO BE USED FOR TERMINATION TO THE GOVERNMENT'S SDP AT THE "Z"
LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO
THEGOVERNMENT FOR ACCEPTANCE TESTING. TESTING CRITERIA: VENDOR
MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 BENCH MARKING
CONFIGURATION AND PERFORMANCE OF ETHERNET SERVICE. NOTE-ETHERNET
FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9100 BYTES.
CIRCUIT REQUIRES THE FOLLOWING PARAMETERS: (A) FIBER TERMINATION:
FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET-LAN-
PHY-SINGLE MODE FIBER), 802.3AE, 1310NM. "SC" CONNECTORS. (B) COMMITTED
INFORMATION RATE (CIR) - 10GB. (C) 10GB ETHERNET - LAN-PHY INTERFACE
REQUIRED AT COMMERCIAL DEMARC AT THE A AND Z LOCATIONS. (D)
ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM
TRANSMISSION UNIT (MTU) OF 9100 OCTETS (BYTES). (E) NO NETWORK
INTERFACE UNIT, DEDICATED PATH (F) GFE CLOCKING: VENDOR ESFU (OR
EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT. (G) TESTING CRITERIA:
VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 BENCH
MARKING CONFIGURATION AND PERFORMANCE OF ETHERNET SERVICE. NOTE-
ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9100 BYTES. (H) LINE
MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A
DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER. (I) 1 HOUR RESPONSE
TIME TO RESPOND TO CUSTOMER UPON RECIEPT OF TROUBLE. (J) VENDOR
REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES. N.
CIRCUIT SPECIFICATIONS CONTINUED: (K) VENDOR MUST HAVE A 24X7
NETWORK OPERATIONS CENTER. (L) TELECOMM PROVIDER MUST MAINTAIN
OPERATIONS, MAINTENANCE AND ADMINISTRATION MONITORING OF
ETHERNET CIRCUIT IAW ITU-T-Y.1731. (M) THE COMMERCIAL CIRCUIT WILL BE
ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DISA GOC IP BACKBONE
ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627 (D)
770-8627.
VENDOR MUST PROVIDE: 1. THE LONG-HAUL CIRCUIT NO. AND LEC CKT ID'S AS
APPLICABLE TO THE DISA IE161 PROGRAM OFFICE PRIOR TO TURN UP TO THE
GOVERNMENT. PRIMARY: RAY BURKE (301) 225-2550 ALTERNATE: KEN DIEF (301)
225-2416 2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF 10GBE SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3.
INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS. 4.
VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE
PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
TEST & ACCEPTANCE INSTRUCTIONS: MINIMUM TECHNICAL SPECIFICATIONS:
SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10. GIGABITS/S, +- 100 PPM LINE
CODE: OPTIC ETHERNET FRAME: 9100 OCTETS (BYTES) 1. TEST AND
ACCEPTANCE: 10GB LAN PHY CIRCUITS SHALL PASS A FULLY DOCUMENTED
SATISFACTORY 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY:
D312-418-9935/9913, C618-418-9935/9913. 2. TESTING PARAMETERS AND
THRESHOLDS: THE FOLLOWING TESTING PARAMETERS SHALL BE MEASURED
DURING TEST AND ACCEPTANCE TESTING. ERROR PERFORMANCE SHALL BE
MEASURED AND RECORDED OVER THE DURATION OF THE CONTIGUOUS 24 HOUR
TESTING INTERVAL AND SHALL BE MEASURED AND RECORDED PER DEFINITION
IN ITU-T-Y.1564. 3. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE
BETTER THAN THE FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE:
AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL
BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND
SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC.
DELAY SHALL BE BETTER THAN 10 MSEC 4. MEAN TIME TO LOSS OF BIT COUNT
INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS. 5. ROUND TRIP
DELAY (RTD): RTD SHALL BE MEASURED OVER THE 10GB WAVE CIRCUIT AND
SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS.