ATTACHMENT 1 FOR SOLICITATION HC101320QA975.pdf
PDF 178 KB Posted
- Solicitation number
- HC101320QA975
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Sample Vendor Block Diagram and Circuit Path Maps_Version2.pdf | ||
| HC101320QA975.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 FOR SOLICITATION HC101320QA975
TELECOMM PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND TRIP
DELAY (RTD) FROM THE CUSTOMER "A" LOCATION TO THE CUSTOMER "Z"
LOCATION. 11. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END TO THE GOVERNMENT'S SERVICE DELIVERY
POINTS (SDP'S) FROM TSR RU01MAY206630; MEANING THAT THE PHYSICAL
PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL
OFFICE LOCATIONS), AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST
HAVE 50 METERS PHYSICAL SEPARATION FROM TSR RU01MAY206630. 12.
VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM)
ON EXTENSION FROM COMMERCIAL POP TO GOVERNMENT SERVICE DELIVERY
POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO
THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST
BE ADJUSTED TO -3 TO -9 DBM. 13. VENDOR MUST CONDUCT WALK-THROUGH
SITE SURVEY PRIOR TO INSTALLATION AT THE "A" AND "Z" LOCATIONS. 14.
VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS. 15. PROVIDER MUST CONDUCT A
SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL
EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A"
LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR
EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION
BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR
MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION
AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN
OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING. Q. CIRCUIT
SPECIFICATIONS CONTINUED: 1. CIRCUIT REQUIRES THE FOLLOWING
PARAMETERS: (A) VENDOR PROVIDED 10G ETHERNET SIGNAL TO THE DISA
ROUTERS. 10GIGABIT ETHERNET OVER OTN (OTU2), OTU2 CIRCUIT WILL CARRY
10GBE LAN PHY PAYLOAD, THE VENDOR WILL DEMONSTRATE THAT THE
PAYLOAD STRUCTURE IDENTIFIER (PSI) BYTE IN COLUMN 15, ROW 4 OF THE
OTU2 FRAME CAN TRANSPORT VALUE 0X09 BIDIRECTIONALLY ERROR FREE.
REFERENCE: PARA 17.4.1, ITU-T G.709/Y.1331 (06/2016) MAPPING OF GFP FRAMES
INTO AN EXTENDED OPU2 PAYLOAD AREA. 10GIGABIT ETHERNET - LAN PHY
INTERFACE REQUIRED AT COMMERCIAL DEMARC AT THE "A" AND "Z
"LOCATIONS. (B) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET
(OPTICAL HANDOFF-10GB ETHERNET LAN-PHY-SINGLE MODE FIBER), 1310NM.
"SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE: WHEN
EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH
OF THE OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO
DELIVERY. (C) COMMITTED INFORMATION RATE (CIR): 10GB (D) ETHERNET
FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT
(MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES. (E) NO NETWORK INTERFACE
UNIT, DEDICATED PATH (F) TESTING CRITERIA: VENDOR MUST TEST THE
CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 (02/2016) ETHERNET SERVICE
ACTIVATION SIMPLE CIR VALIDATION TEST WITH EMIX PATTERN ADDFH. NOTE:
ETHERNET FRAME SIZE DESIGNATOR 'H' (PHYSICAL MTU) IS EQUAL TO 9000
BYTES. (G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS
24 HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5%
AVAILABILITY OR BETTER. (H) 1 HOUR RESPONSE TIME TO RESPOND TO
CUSTOMER UPON RECIEPT OF TROUBLE. (I) VENDOR REQUIRED TO HAVE
CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES. (J) VENDOR MUST
HAVE A 24X7 NETWORK OPERATIONS CENTER. (K) TELECOMM PROVIDER MUST
MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION MONITORING OF
ETHERNET CIRCUIT. TEST & ACCEPTANCE INSTRUCTIONS: 2. VENDOR MUST
PROVIDE: A. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION
AND MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.
B. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS. C.
VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE
PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 3. ALL
EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE
DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT
AFB, IL. PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950 MINIMUM
TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:
10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTIC 1. TEST AND ACCEPTANCE:
CIRCUITS SHALL PASS A FULLY DOCUMENTED SATISFACTORY 72 HOUR SOAK
TEST BY DISA GOC AT SCOTT AFB 2. ERROR PERFORMANCE: ERROR
PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER
THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN
99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10
GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. 3.
MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER
THAN 24 HOURS. 4. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER
THE 10GB CIRCUIT AND SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS
PER 350 MILES MEASURED AS THE GREAT CIRCLE DISTANCE BETWEEN THE "A"
AND "Z" LOCATIONS. 5. ROUND TRIP DELAY VARIANCE (JITTER) SHALL BE NO
MORE THAN 3MS.