ATTACHMENT 1 FOR SOLICITATION HC101320QA975

TELECOMM PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND TRIP

DELAY (RTD) FROM THE CUSTOMER "A" LOCATION TO THE CUSTOMER "Z"

LOCATION. 11. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED

TOTALLY DIVERSE END TO END TO THE GOVERNMENT'S SERVICE DELIVERY

POINTS (SDP'S) FROM TSR RU01MAY206630; MEANING THAT THE PHYSICAL

PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL

OFFICE LOCATIONS), AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST

HAVE 50 METERS PHYSICAL SEPARATION FROM TSR RU01MAY206630. 12.

VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM)

ON EXTENSION FROM COMMERCIAL POP TO GOVERNMENT SERVICE DELIVERY

POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO

THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST

BE ADJUSTED TO -3 TO -9 DBM. 13. VENDOR MUST CONDUCT WALK-THROUGH

SITE SURVEY PRIOR TO INSTALLATION AT THE "A" AND "Z" LOCATIONS. 14.

VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE

COORDINATION AND ACTIVATION PROCESS. 15. PROVIDER MUST CONDUCT A

SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL

EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A"

LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR

EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION

BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR

MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION

AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN

OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING. Q. CIRCUIT

SPECIFICATIONS CONTINUED: 1. CIRCUIT REQUIRES THE FOLLOWING

PARAMETERS: (A) VENDOR PROVIDED 10G ETHERNET SIGNAL TO THE DISA

ROUTERS. 10GIGABIT ETHERNET OVER OTN (OTU2), OTU2 CIRCUIT WILL CARRY

10GBE LAN PHY PAYLOAD, THE VENDOR WILL DEMONSTRATE THAT THE

PAYLOAD STRUCTURE IDENTIFIER (PSI) BYTE IN COLUMN 15, ROW 4 OF THE

OTU2 FRAME CAN TRANSPORT VALUE 0X09 BIDIRECTIONALLY ERROR FREE.

REFERENCE: PARA 17.4.1, ITU-T G.709/Y.1331 (06/2016) MAPPING OF GFP FRAMES

INTO AN EXTENDED OPU2 PAYLOAD AREA. 10GIGABIT ETHERNET - LAN PHY

INTERFACE REQUIRED AT COMMERCIAL DEMARC AT THE "A" AND "Z

"LOCATIONS. (B) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET

(OPTICAL HANDOFF-10GB ETHERNET LAN-PHY-SINGLE MODE FIBER), 1310NM.

"SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE: WHEN

EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH

OF THE OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO

DELIVERY. (C) COMMITTED INFORMATION RATE (CIR): 10GB (D) ETHERNET

FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT

(MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES. (E) NO NETWORK INTERFACE

UNIT, DEDICATED PATH (F) TESTING CRITERIA: VENDOR MUST TEST THE

CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 (02/2016) ETHERNET SERVICE

ACTIVATION SIMPLE CIR VALIDATION TEST WITH EMIX PATTERN ADDFH. NOTE:

ETHERNET FRAME SIZE DESIGNATOR 'H' (PHYSICAL MTU) IS EQUAL TO 9000

BYTES. (G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS

24 HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5%

AVAILABILITY OR BETTER. (H) 1 HOUR RESPONSE TIME TO RESPOND TO

CUSTOMER UPON RECIEPT OF TROUBLE. (I) VENDOR REQUIRED TO HAVE

CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES. (J) VENDOR MUST

HAVE A 24X7 NETWORK OPERATIONS CENTER. (K) TELECOMM PROVIDER MUST

MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION MONITORING OF

ETHERNET CIRCUIT. TEST & ACCEPTANCE INSTRUCTIONS: 2. VENDOR MUST

PROVIDE: A. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION

AND MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.

B. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS. C.

VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE

PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 3. ALL

EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE

DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT

AFB, IL. PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950 MINIMUM

TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:

10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTIC 1. TEST AND ACCEPTANCE:

CIRCUITS SHALL PASS A FULLY DOCUMENTED SATISFACTORY 72 HOUR SOAK

TEST BY DISA GOC AT SCOTT AFB 2. ERROR PERFORMANCE: ERROR

PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER

THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN

99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10

GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. 3.

MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER

THAN 24 HOURS. 4. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER

THE 10GB CIRCUIT AND SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS

PER 350 MILES MEASURED AS THE GREAT CIRCLE DISTANCE BETWEEN THE "A"

AND "Z" LOCATIONS. 5. ROUND TRIP DELAY VARIANCE (JITTER) SHALL BE NO

MORE THAN 3MS.